HASIL PENGUKURAN GROUNDING DAN BAR ROD
2
30/04/2025
3
STATIONROOMGROUNDING BAR (GB)NUMBER GBHasil Pengukuran Earth Clamp (Ohm)Note
4
HARJAMUKTISIGNALING112Connection to Rod / PIT
5
22,08/0,73/0,82Connection to PDC (SIG)
6
31,63/0,61/0,99Connection to Cabinet (PSD)
7
4OL/OLConnection to Cabinet (PSD)
8
5OL/OLConnection to Cabinet (PSD)
9
213,62Grounding Signaling to Main Grounding Battery
10
21,55Grounding Signaling to Main Grounding (MEP)
11
31,98Connection to Cabinet Rack (SIG)
12
TELECOM110,48Connection to TEL (Monopole)
13
20,42Connection to TEL
14
31,11Grounding Telecom to Grounding Battery (MEP)
15
4OLConnection to Scada
16
55,42/0,40Connection to TEL
17
60,22/0,46Connection to TEL
18
70,58Connection to TEL
19
CIRACASSIGNALING110,63Grounding Signaling to Grounding Battery
20
20LConnection to PDC (SIG)
21
31,95/2,60Connection to PDC Aux. (SIG)
22
40,54Connection to Cabinet (PSD)
23
50LConnection to Cabinet (PSD)
24
60,41Connection to Cabinet (PSD)
25
70LConnection to Cabinet (PSD)
26
80,24Connection to Cabinet (PSD)
27
210,71Grounding Signaling to Grounding Battery
28
21,44Grounding Signaling to Grounding Battery (MEP)
29
30,96Grounding Signaling to Grounding Telecom (MEP)
30
41,91Connection to Cabinet Rack (SIG)
31
TELECOM110,28/0,28Connection to TEL
32
24,19/0,31Connection to TEL
33
30,36Connection to TEL
34
41,7Connection to Grounding Rod /PIT (MEP)
35
50,71Connection to TEL (Monopole)
36
60,72Connection to Scada
37
70LConnection to Scada
38
210LTo GB SIG
39
KP. RAMBUTANSIGNALING110,84Connection to PDC (SIG)
40
20,82Connection to PDC Aux. (SIG)
41
31,16Grounding Signaling to Grounding Battery (MEP)
42
40LConnection to PSD
43
50LConnection to PSD
44
60LConnection to PSD
45
70LConnection to PSD
46
210,42Grounding Signaling to Grounding Telecom (MEP)
47
220,1Connection to Rod / PIT (MEP)
48
30,43Grounding Signaling to Grounding Battery (MEP)
49
40,84Connection to Cabinet Rack (SIG)
50
TELECOM112,72Connection to TEL
51
20,29Connection to TEL
52
30,27/0,31Connection to TEL
53
40,37/0,40Connection to TEL
54
50,34Connection to TEL
55
60,540Grounding Telecom to Grounding Battery (MEP)
56
70,490Connection to TEL (Monopole)
57
80L/0,43Connection to Scada
58
210LTo GB SIG
59
TMIISIGNALING111,95Connection to PDC (SIG)
60
20,38Connection to PDC Aux. (SIG)
61
30,49Grounding Signaling to Grounding Battery (MEP)
62
45,26Connection to PSD
63
50,37Connection to PSD
64
60,35Connection to PSD
65
70LConnection to PSD
66
212,40Grounding Signaling to Grounding Telecom (MEP)
67
20LGrounding Signaling to Grounding Battery (MEP)
68
32,39Connection to Cabinet Rack (SIG)
69
TELECOM110,24Connection to TEL (Rack 2)
70
20,24/0,24Connection to TEL (Rack 3, Rack 4)
71
30,37/0,43Connection to TEL (Rack 5, Rack 6)
72
41,15Connection to TEL (Monopole)
73
53,80/0,59Connection to TEL
74
60,56Connection to TEL
75
70,82Connection to Scada
76
81,27Grounding Telecom to Rod / PIT (MEP)