ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
ADVENT ENVIROCARE TECH OLOGY PVT LTD
2
3
Ref. No.: AETPL 02Date: 8/22/2022
4
Rev.No.: 00Page no.01 of 01AETPL/HIRA/10
5
Hazard Identification & Risk Assessment Format
6
Activity: Tower crane operation & maintenance
7
Sr. No.ActivityHazardIssues (Internal/External)Risk ( Probable Outcome) Existing Control Legal Yes/NoRisk Assessment existing Control MeasuresSignificant (S) /
Non-Significant (NS)
Additional Control MeasureRisk Assessment additional Control MeasuresRef. Of WI/ SOP :- Opportunities & ActionRemark
8
Probability(P)Severity(S)Risk Level (H/M/L) : Probability(P)Severity(S)Risk Level (H/M/L) :
9
1Operation of Tower craneDeployment of unauthorized crane operatorInternal1. Property Damage
2. Major injury
1. Only operator who are trained and capable to work at height will be employed to operate the crane
2. Only authorized operators will be allowed to operate crane.
3. Ensure medical fitness of operator.
YesP3S4HS1. Check competency & experienced certificate of tower crane operator.
2. Display Name, contact number with photograph of operator on Tower Crane.
3. Health check up will be carried out for operator as per GPL requirement.
4. Ensure vertigo test. Conduct induction training for operator.
5. Conduct training on height work, tower crane operation safety.

P2S4MNil
10
Crane operation without TPI by competent personInternal1. Crane failure
2. Load failure
3. Property damage
1. On completion of erection, before being taken into use, the tower crane shall be tested and examined by a competent examiner in accordance with the statutory requirements. Before these tests and examinations are carried out, a visual inspection of the crane shall be done by the Mechanical In charge supervising the erection, followed by functional checks.
2. Ensure area barricading while load test
P3S4HS1. Check competency certificate of competent person.
2. Thorough inspection and load test of tower crane to be done by competent person at every six month.
3. Pre inspection to be done as per checklist (Ref No.: GPL/SAF/CH/TCRN/R0)
4. Weekly inspection to be done for tower crane as per checklist (Ref No.: GPL/SAF/CH/TCRN/R0)
P2S4MNil
11
Unsafe access for craneInternal1. Falling from height
2. Injury
1. Provide safe access to reach tower crane ladder. P3S3HS1. Ensure adequate illumination for access (Min. 50 Lux)P2S3MNil
12
Crane operation without functional checkInternal1. Load failure
2. Property damage
3. Major injury
1. A functional check of the crane should be carried out under no load conditions to ensure the correct operation of all motions, limit switches and brakes. These checks to be repeated repeated again with a light load on the crane.
2. On all capacity or near capacity loads, the hoist brakes should be tested by returning the motor switch or push button to the OFF position after raising the load a few inches off the floor. If the hoist brakes do not hold the load should be set on the floor and the crane not further operated.
3. Ensure availablity of all labels and decals on boom.
P4S4HS1. The defect found during functional check to be reported immediately to themechanical in charge.
2. All signs labels and decals on the crane must be in a language (normally English) that is readily understood by the operator.
3. Obtain work permit. Daily tower crane inspection checklist shall be followed strictly.
P2S4MNil
13
Absence of lifeline & fall arrestor for ladderInternal1. Person falling from height
2. Fatal
1. Provide vertical lifeline & fall arrestor for tower crane ladder.
2. Ensure use of full body harness while climbing ladder.
P4S4HS1. Inspect lifeline, fall arrestor & safety harness regularly
2. Conduct training on height work & ladder safety
3. Ensure PPE's like Safety helmet, safety shoes, reflective jacket & full body safety harness.
P2S4MNil
14
Incompetent signalmanInternal1. Hit by load due to poor signalning - Major injury, property damage1. Ensure trained & experienced signalman.
2. Conduct induction training.
3. Ensure medical fitness of signalman.
4. Conduct training on signaling for both operator & signalman.
5. Only signalman will give the signal to avoid confusion.
P3S3HS1. Standard crane signal board will be displayed on tower crane
2. Standard signal code to be followed.
3. Copies of the standard signal code should be issued to all crane operators, signalman and any other persons concerned.
4. Ensure authorization certificate of signalman
5. PPE colour code to be followed for signalman
6. Conduct training on how to use walky-Talky
7. Display signalman (Name, contact no. & photograph) details on tower crane.
P2S3MNil
15
Suspended Load Internal1. Hit by load
2. Major injury
1. Signalman should be available at unloading point to warn worker about job.
2. Conduct Tool Box Talk on hazards & risk associated with crane operation.
3. At no time a load should be held suspended from the crane with the power "ON" unless the operator is at the operator's switch. Under this condition the load should be kept as close as possible.
v. The area should be clear and all persons in the area aware when load is lifted. This is to be ensured by a warning signal while lifting, lowering & while moving
P4S4HS1. Ensure supervision.
2, Ensure presence of signalman.
P2S4MNil
16
Hanging slings in crane hook while not in useInternal1. Hit by sling
2. Injury
1. All slings should be removed from the crane hooks when not in use.P3S3HS1. Conduct TBT for riggers & signalman.P2S3MNil
17
Damaged lifting tools & tacklesInternal1. Personal Injury
2. Failure of load
3. Property damage
1. Only third party inspected tools & tackles to be used at site. Inspect tools to check any damage.
2. Inspect tools & tackles regularly before use
P4S4HS1. Check TPI certificate (Form 11).
2. Inspection colour code to be applied on tools & tackles quaterly.
3. Display inspection colour code chart of tools & tackles
4. Thorough inspection and load test of lifting tools & tackles to be done by competent person at every six month.
P2S4MNil
18
Overloading of crane & lifting tacklesInternal1. Major injury
2. Failure of load
3. Property damage
5. Adverse effect on crane stability
1. Check SWL of all crane & lifting tackles before lifting to avoid overloading.
2. Check functioning of limit switch regularly
3. Lifts should not be attempted beyond the rated load capacity of the crane, slings etc.
4. All operations should be carried out in accordance with the manufacturer’s operating instruction manual.
5. The rated capacity of a crane should not be exceeded, except when testing the crane under the supervision of a competent person.
6. Ensure trained rigger for slinging activity.
P3S4HS1. Ensure SWL is clearly visible on all lifting tools & tackles
2. Ensure manufacturer load chart in operators cabin.
3. Follow instructions & standards safe practices of manufacturer of a tower crane.
4. Conduct training for crane operator, signalman & riggers to aware about crane SWL.
5. Ensure functioning of buzzer while overloading provided with blinking light in operator cabin.
P2S4MNil
19
Collision of tower crane with adjacent tower cranes/ buildings/ loadsInternal1. Damage to structure, tower crane 2. Collapse of tower crane 3. Serious Injury/ Fatality1. Tower cranes shall be fitted with anti collision device (ACD). 2. Ensure competent operator and signalman deployed for the job. 3. Periodical training to tower crane operators and signalaman.P2S2MSNil
20
Adverse whether conditionsInternal1. Poor visibility
2. Hit by load
3. Major injury
4. Load failure
1. If the visibility or range of sight of the operator is impaired by adverse weather conditions, appropriate crane operations should be temporarily suspended.P2S4HS1. Ensure strict supervision in case of adverse whether condiction.
2. Crane operation to be resumed if visibility is clear to operator.
P2S4MNil
21
Absence of aviation lampInternalCollision by passing aircraft1. Provide aviation lamp as collision avoidance measures which should be visible to passing aircraft P3S4HS1. Aviation lamp to be kept on during night as well as day
2. Ensure regular inspection of aviation lamp to check functioning.
P2S4MNil
22
Absence of lightening arrestorInternalElectrocution during lightening1. Provide lightening arrestor at the top of tower crane
2. Provide separate earthing for lightening arrestor
P3S3HS1. Ensure regular earth resistance inspection by authorized electrician.P2S3MNil
23
Poor illuminationInternal1. Poor visibility
2. Hit by load
3. Major injury
4. Load failure
1. Provide LED light on boom.
2. Ensure sufficient illumination in lifting area.
P3S4HS1. Ensure regular illumination inspection at site by Lux meter.P2S4MNil
24
Working in hot weatherInternalFatigueEnsure that the fan is provided in the operators cabin.P3S3HSEnsure rest if requiredP2S3MNil
25
Excess of wind speed than specified in the operating instructions for the crane.Internal1. Adverse effect on crane stability
2. Swinging of load
3. Property damage
4. Fatal
1. Crane should not be operated in wind speeds that are in excess of those specified in the operating instructions for the crane.
2. Care should be taken to prevent pendulum swinging of the load, by careful control of the operating motions to match the swing of the load and to keep it under control at all times.
3. Install anemometer to measure wind speed.

P3S4HS

1. Before a crane is taken into use after exposure to weather conditions likely to have affected the stability of the crane, the crane's anchorage or ballast shall be tested by a competent examiner.
2. Follow manufacturer manual to check wind speed limit beyond which crane operation to be stopped.
3. Follow manufacturer manual safety instructions to be followed in case of heavy wind speed.
P2S4MNil
26
Pulling load by side/Dragging load out of the vertical positionInternalDisturby stability of crane, stress into the crane1. The crane hoisting ropes should be kept vertical.
2. Crane must not be used for side pulls.
3. The hoisting, slewing, traversing, luffing or travelling motions of a crane should not be used to drag any load along the ground with the hoist rope out of the vertical position.
3. Before lifting a load, the hoist line should be plumb.
4. The crane should be centered over the load before starting the hoist to avoid swinging of the load as lifting starts. Load should not be oscillated by cranes to reach areas not under or within reach of crane.
P3S3HS1. Conduct daily TBT
2. Ensure supervision.
P2S3MNil
27
Tower crane swinging over public road outside project boundary with suspended loadExternal1. Fall of suspended load over public1. Tower crane operator shall first take trolley inside project boundary while the crane is swinging with suspended load. 2. Proper communications shall be ensured between operator and signalman.P2S1LNil
28
Imbalanced loadInternalSerious Injury1. Balance & secure the load before lifting itself.
2. Provide guide rope.
P3S3HS1. Signalman to ensure balancing of job before lifting. P2S3MNil
29
Loose MaterialInternal1. Fall of Material
2. Major Injury
3. Property damage
1. Same size of material to be lifted.
2. Ensure Proper tying of material by rope.
3. Do not lift or unload the material without signaling by authorized Signalman.
P3S3HS1. Signalman to ensure for loose materials are secured properly.
2. Periodical training should be conducted for crane operator and singnalman
P2S3MNil
30
Handling of load near personInternal1. Failure of load
2. Major injury
1. Loads must not be carried over people; especially heavy loads carried / transport/ lift over a long radius.
2. When loads have to be handled in the vicinity of persons, extreme care should be exercised and adequate clearances required.
3. The route of the load should be planned to prevent lifting over persons.
4. Operators and signal-man should pay particular attention to possible dangers of persons working out of vision.
5. All persons should be instructed to stand clear of the load being lifted.
6. When lifting from a stack, all persons should be instructed to stand away from the stack in case adjacent materials or objects are displaced.
P3S3HS1. Ensure presence of signalman at loading & unloading location.P2S3MNil
31
Moving load above public road or nearby societyInternal1. Property damage
2. Fall of material
1. Handling of load above public road/nearby society must be avoided.P3S3HS1. Conduct TBT for crane operator & signalman to aware about restricted area beyond site premises.P2S3MNil
32
Leaving crane cabin without inspectionInternal1. Malfunctioning of craneBefore leaving the crane the operator should perform the following:
a. Raise all hooks to an intermediate position.
b. Spot the crane at an approved designated location
c. Place all controls in OFF position.
d. Open the main switch to the OFF position.
e. Make visual check before leaving the crane.
P3S3HS1. Ensure regular verification by mechanical In charge.P2S3MNil
33
Obstruction of Electrical lines/other structures in movements Internal1. Property damage
2. Hit by boom/load
3. Serious Injury
4. Electrocution
1. The load should be checked & to be assured that it is lifted high enough to clear all obstructions and personnel when moving.
2. All overhead power cables to be highlighted with reflective tape & warning sign boards.
3. Ensure sufficient height of crane to avoid hitting with adjacent structure.
P3S4HS1. Carry work under supervision.
2. Conduct TBT to aware crane operator & signalman about overhead power cables.
P2S4MNil
34
Absence of support for tower craneInternal1. Failure of tower crane
2. Property damage
3. Fatal
Ensure to guy or support the tower crane after its free standing height as recommended by manufacturer. When tensioning the guys, ensure that the pull is even on each and that the tower remains perfectly plumb. Ensure also that blocking is installed in the tower to support the guys and to prevent the tower from being damaged.P3S4HS1. Obtain approval from structural consultant before fixing tower crane supports on building structure.
2. Follow manufacturer manual to provide supports.
P2S4MNil
35
Unsafe electrical connectionsInternal1. Short-circuit
2. Fire
1. Ensure all electrical connections by authorized electrician only.
2. Ensure fire extinguisher in operator cabin
P3S3HS1. Ensure regular electrical inspection.
2. Ensure regular inspection of fire extinguisher.
3. Conduct training on operation of fire extinguisher
P2S3MNil
36
Irregular maintenance of craneInternal1. Failure of load
2. Property damage
3. Major injury
1. Preventive maintenance of crane to be done as recommended by manufacturer manual.
2. Regular visual inspection to be done. In the visual inspection, particular care should be taken to ensure the following:
• All bolts and locking devices are correctly positioned and secured.
• The load/radius indicator and automatic safe load indicator are correctly fitted.
• Access ladders, safety platforms and walkways are in position and secure; and ropes are correctly reeved and all machinery guards are in place.
P3S4HS1. Maintain register to record maintenance details
2. Check functioning of anemometer
3. Ensure physical inspection of lightening arrestor.
4. Ensure physical inspection to check continuity of body earthing of tower crane, electrical panel & lightening arrestor earthing.
5. Ensure proper chambers of earth pits, availability of covers on chambers & display of earth resistance boards.
6. Ensure quaterly earth resistance check of all earth pits.
P2S4MNil
37
Confusion in case of emergencyInternal1. Falling from height1. Training to be conducted on emergency prepardness & response
2. Conduct training on operation of fire extinguisher.
P2S3MS1. Conduct mock drill to check effectiveness of emergency prepardness & response training.
2. Display emergency contact number list in operator cabin.
P2S3MNil
38
Continue work without rest to operatorInternalFatigueEnsure that two operators will be deployed separately for day and night work.P3S3HSDisplay day and night operator details.P2S3MNil
39
Defective limit switchesInternalFall of Material
Personal Injury
1. Operator to check working of limit switch before start job.
2. Electrical limit switches or warning devices should never be by passed.
3. Upper limit switches and lower limit switches should be tested in stopping the hoist at the beginning of each shift or as frequently as may be directed.
P3S3HSThe crane should not be operated if limit switches are out of order or if ropes show defects or wear.
xvi. Crane operators should not use limit switches to stop the hoist under normal operating conditions. (These are emergency device and should not be used as operating controls).
xvii. Limit switch should not be blocked adjusted or disconnected in order to go higher than what switch will allow.
P2S3MNil
40
2Faulty limit switches InternalPersonal Injury & property DamageEnsure limit switches are functional P3S3HSEnsure pre inspection of mobile crane before work start.P2S3MNil
41
Damaged or uncertified lifting tools and tacklesInternalPersonal Injury & property Damage1. Ensure that all lifting tools and tackles will be certified by competant person (Form XI) 2. Ensure that all lifting tackles will be in good condition.P3S3HS1. Follow inspection colour code for all lifting tools & tackles.
2. Inspection colour code to be displayed on safety bulletin boards to aware all workers & staff.
3. Before each use of lifting accessories pre-use checks should be carried out to ensure that they are in good condition and that a current report of thorough examination is available.
4. Thorough inspection and load test of tower crane to be done by competent person at every six month.
P2S3MNil
42
Person hit by material/ buckets while liftingInternalPersonal Injury/ FatalityEnsure that two slings will be used for long objects and tag lines will be provided to load/ bucket.P3S3HSEnsure signalman will be available during operation.P2S3MNil
43
Insufficient IlluminationInternalPersonal Injury/ Fatality1. Ensure that minimum 50 Lux level will be available during night time. 2. Ensure extra lights will be fixed at tower crane mast.P3S3HSEnsure night work permit will be folowed.P2S3MNil
44
Work in night timeInternalSerious injury Ensure that the operator will be comfort to work at night and do not sleep in the cabin.P3S3HSTea will be provided to the crane operator and signalman during night time and supervision by building engineer/ Supervisor.P2S3MNil
45
Improper storage of lifting tools & tacklesInternal1. Load failure
2. Property damage
3. Major injury
1. All lifting tools & tackles to be stored in dry placeP3S3HSEnsure regular inspection of tools & tacklesP2S3MNil
46
Lifting sharp material withou protectionInternal1. Damage of sling
2. Fall of material
3. Property damage
4. Major injury
1. Lifting accessories should be protected with protective sleeves or suitable packing, where loads with sharp edges are to be liftedP3S3HS1. Ensure supervision.P2S3MNil
47
Improper communication between operator and signalmanInternalPersonal Injury/ Fatality1. Ensure walky talky will be provided to operator and signalman.
2. If tele-communication equipment such as radio or walkie-talkie is used in a multi-crane situation, suitable arrangement should be made to ensure that the radio frequency is not interrupted for whatever reason at any time during the crane operation period and correct message is received by persons using such equipment.
P3S3HS1. Ensure that all walky taky will be in good condition.P2S3MNil
48
3Maintenance work (Preventive & Break down maintenance)Oil spillage on ladderInternal1. Person falling from height
2. Fatal
1. Oil spillage to be cleaned immediately if any oil spillage is there after maintenance.P2S3HS1. Ensure PPE's like Safety helmet, safety shoes, reflective jacket, hand gloves, ear plug, safety goggle & full body safety harness.
Ensure height work permit will be followed and trained workers will be identified.
P2S3MNil
49
Absence of lifelineInternal1. Falling from height1. Provide lifeline on boom for anchoring safety harness whileP3S3HS1. Check physical condition of lifeline rope.P2S3MNil
50
Loose MaterialsInternal1. Fall of material
2. Major Injury
3. Property damage
1. Use tool kit
2. Do not store loose materials on platform
P3S3HSEngage only authorized persons for maintenance work.P2S3MNil
51
Absence of guard for rotating partInternal1. Caught in between
2. Major injury
Ensure guard for rotating partP3S3HSEnsure regular inspection to check availability of guard.P2S3MNil
52
Ladder climbing without fall protection systemInternal1. Person falling from height
2. Fatal
1. Ensure use of full body harness used by all persons & fall arrestor provided with vertical lifeline while climbing ladder.
2. Ensure use of full body safety harness while maintenance work
P3S3HS1. Ensure that trained persons will be engaged in the maintenance work.
2. Ensure supervision.
P2S3MNil
53
Absence of body earthing for tower crane, electrical panelInternalElectrocutionEnsure body earthing for tower crane, electrical panel & lightening arrestorP3S3HSEnsure that the work permit will be followed.P2S3MNil
54
55
56
57
RISK Calculation / Evaluatio
58
Probability (P)P/SS1S2S3S4
59
P1: ImprobableP1LLMM
60
P2 : RemoteP2LMMH
61
P3 : PossibleP3MMHH
62
P4 : ProbableP4MHHH
63
64
Severity (s)A : Hazards must be avoided (or the level of risk reduced significantly and reliable by controls)
65
S1 : NegligibleB : Hazards should be avoided (or the level of risk reduced significantly and reliable by controls)
66
S2 : MinorC : Risk to be controlled as far as reasonably practicable
67
S3 : SeverD : Risk is controlled as far as reasonably practicable .
68
S4 : Extreme -- : Acceptable risk
69
LEGAL : If activity come under legal implecation (significant) than additional control measures is to be taken and has to be reviewed periodically.
70
S : Significant
71
NS : Non - Significant.
72
73
74
75
76
PREPARED BY AETPL PROJECT MANAGER AETPL SAFETY MANAGER
77
78
ATUL PROJECT MANAGER ATUL SAFETY MANAGER ATUL PROJECT MANAGER
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100