| A | B | C | D | E | F | G | H | I | J | K | L | N | O | P | Q | S | T | Z | AA | AC | AE | AJ | AK | AL | AM | AP | AQ | AS | AV | BB | BC | BD | BE | ||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Tulisan warna merah pengganti pinjaman awal | ||||||||||||||||||||||||||||||||||
2 | No Kontrak | USER | Material | Satuan | Vendor | Gudang | Jumlah | Tanggal Datang | Status Datang / Belum | terpakai | sisa stok ABT di gudang belum ada pembagian | Lamandau / Mengkalang | Barito Utara / Tambaba | Gunung Mas / Tumbang Sepan | Gunung Mas / Bereng Balawan | Gunung Mas / Bereng Malaka | Barito Utara / Berong | Lawarang Nyala Parsial | Barito Utara / Liang Buah | Katingan / Mirah Kalanaman | Barito Timur / Muara Awang | Barito Utara / Sampirang II | Kotawaringin Timur / Selucing | Kotawaringin Timur / Tewai Hara | Kotawaringin Timur / Tumbang Batu | Kotawaringin Timur / Tumbang Koling | Kotawaringin Timur / Tumbang Payang | Kotawaringin Timur / Tumbang Sapia | Kotawaringin Timur / Pantap | STATUS | TOTAL | APLN | ABT | ||
3 | |||||||||||||||||||||||||||||||||||
4 | 0589.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | POLE;STEEL;20kV;CIRCL;12m;200daN; | Batang | Raja Besi | PRY | 607 | 22-Des-25 | Datang | 605 | 2 | 196 | 168 | 9 | 0 | 136 | 46 | 50 | |||||||||||||||||
5 | 0593.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CUT OUT;20kV;6-100A;10kA;125kV | Set | Sinarindo Wiranusa | PRY | 42 | 11-Des-25 | Datang | 33 | 9 | 12 | 9 | 9 | 3 | ||||||||||||||||||||
6 | 0595.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | LA;20-24kV;K;10kA;POLYMER | Set | Insindo Inti Abadi | PRY | 30 | 9-Des-25 | Datang | 30 | 0 | 12 | 9 | 9 | |||||||||||||||||||||
7 | 0595.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | LA;20-24kV;K;10kA;POLYMER | Set | Insindo Inti Abadi | BJM | 12 | 8-Des-25 | Datang | 12 | 0 | 12 | |||||||||||||||||||||||
8 | 0596.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | POLE;STEEL;220V;CIRCL;9m;200daN;; | Batang | Raja Besi | PRY | 51 | 22-Des-25 | Datang | 51 | 0 | 23 | 28 | ||||||||||||||||||||||
9 | 0596.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | POLE;STEEL;220V;CIRCL;9m;200daN;; | Batang | Raja Besi | BJM | 66 | 23-Des-25 | Datang | 61 | 5 | 61 | |||||||||||||||||||||||
10 | 0596.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | POLE;STEEL;220V;CIRCL;9m;200daN;; | Batang | Raja Besi | PBN | 127 | 6-Des-25 | Datang | 127 | 0 | 127 | |||||||||||||||||||||||
11 | 0598.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | POLE;CONCRETE;20kV;CIRCL;12m;200daN | Batang | Tonggak Ampuh | PRY | 288 | Datang | 288 | 0 | 288 | ||||||||||||||||||||||||
12 | 0599.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | POLE;CONCRETE;20kV;CIRCL;12m;200daN | Batang | Tonggak Ampuh | PRY | 445 | Datang | 445 | 0 | 445 | ||||||||||||||||||||||||
13 | 0600.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | POLE;CONCRETE;20kV;CIRCL;12m;200daN | Batang | Tonggak Ampuh | PRY | 300 | Datang | 300 | 0 | 300 | ||||||||||||||||||||||||
14 | 0601.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | POLE;CONCRETE;20kV;CIRCL;12m;200daN | Batang | Tonggak Ampuh | PRY | 104 | Datang | 104 | 0 | 104 | ||||||||||||||||||||||||
15 | 0602.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | POLE;CONCRETE;20kV;CIRCL;12m;200daN | Batang | Tonggak Ampuh | PRY | 250 | Datang | 250 | 0 | 250 | ||||||||||||||||||||||||
16 | 0603.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | POLE;CONCRETE;20kV;CIRCL;12m;200daN | Batang | Tonggak Ampuh | PRY | 360 | Datang | 360 | 0 | 360 | ||||||||||||||||||||||||
17 | 0604.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | POLE;CONCRETE;20kV;CIRCL;12m;200daN | Batang | Tiang Beton BRM | KPS | 207 | Datang | 207 | 0 | 207 | ||||||||||||||||||||||||
18 | 0607.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | POLE;CONCRETE;20kV;CIRCL;12m;200daN | Batang | Wijaya Karya Beton Tbk | KPS | 211 | Datang | 211 | 0 | 211 | ||||||||||||||||||||||||
19 | 0617.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | POLE;STEEL;220V;CIRCL;9m;200daN;; | Batang | Bakrie Pipe Industries | KPS | 57 | 7-Jan-26 | Datang | 57 | 0 | 57 | |||||||||||||||||||||||
20 | 0618.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | ISOLATOR;STRAIN KAP PIN;PORC;24KV;;70kN | Set | Twink Indonesia | BJM | 204 | 14 Jan 2026 | Datang | 192 | 12 | 192 | |||||||||||||||||||||||
21 | 0618.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | ISOLATOR;STRAIN KAP PIN;PORC;24KV;;70kN | Set | Twink Indonesia | KPS | 517 | 3 Feb 2026 | Datang | 477 | 19 | 114 | 228 | 156 | |||||||||||||||||||||
22 | 0618.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | ISOLATOR;STRAIN KAP PIN;PORC;24KV;;70kN | Set | Twink Indonesia | PRY | 500 | 3 Feb 2026 | Datang | 498 | 2 | 36 | 6 | 192 | 264 | ||||||||||||||||||||
23 | 0618.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | ISOLATOR;STRAIN KAP PIN;PORC;24KV;;70kN | Set | Twink Indonesia | PBN | 2000 | 1 Feb 2026 | Datang | 1380 | 620 | 180 | 102 | 156 | 114 | 210 | 252 | 39 | 153 | 174 | 2000 | ||||||||||||||
24 | 0621.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | ISOLATOR;PINPOST;PORC;24KV;;12.5kN | Set | Twink Indonesia | BJM | 76 | 14 Jan 2026 | Datang | 16 | 60 | 16 | |||||||||||||||||||||||
25 | 0621.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | ISOLATOR;PINPOST;PORC;24KV;;12.5kN | Set | Twink Indonesia | KPS | 4664 | 3 Feb 2026 | Datang | 3485 | 1179 | 746 | 353 | 541 | 935 | 910 | |||||||||||||||||||
26 | 0621.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | ISOLATOR;PINPOST;PORC;24KV;;12.5kN | Set | Twink Indonesia | PRY | 4288 | 3 Feb 2026 | Datang | 4288 | 0 | 575 | 784 | 1578 | 1351 | ||||||||||||||||||||
27 | 0621.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | ISOLATOR;PINPOST;PORC;24KV;;12.5kN | Set | Twink Indonesia | PBN | 11489 | 1 Feb 2026 | Datang | 5220 | 6269 | 701 | 512 | 1104 | 1264 | 202 | 585 | 852 | 11489 | ||||||||||||||||
28 | 0623.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | POLE;STEEL;220V;CIRCL;9m;200daN;; | Batang | Raja Besi | PRY | 435 | 02 Mar 2026 | Datang | 237 | 198 | 23 | 85 | 129 | |||||||||||||||||||||
29 | 0623.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | POLE;STEEL;220V;CIRCL;9m;200daN;; | Batang | Raja Besi | PBN | 1949 | 27 Feb 2026 | Datang | 445 | 1504 | 46 | 52 | 92 | 102 | 36 | 41 | 76 | 1949 | ||||||||||||||||
30 | 0623.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | POLE;STEEL;220V;CIRCL;9m;200daN;; | Batang | Raja Besi | KPS | 694 | 28 Feb 2026 | Datang | 254 | 440 | 5 | 36 | 20 | 14 | 76 | 103 | ||||||||||||||||||
31 | 0625.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | ISOLATOR;STRAIN KAP PIN;PORC;24KV;;70kN | Set | Kentjana Sakti Indonesia | KPS | 1430 | 9 Feb 2026 | Datang | 174 | 1256 | 78 | 96 | ||||||||||||||||||||||
32 | 0625.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | ISOLATOR;STRAIN KAP PIN;PORC;24KV;;70kN | Set | Kentjana Sakti Indonesia | PRY | 964 | 9 Feb 2026 | Datang | 438 | 526 | 207 | 207 | 24 | |||||||||||||||||||||
33 | 0625.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | ISOLATOR;STRAIN KAP PIN;PORC;24KV;;70kN | Set | Kentjana Sakti Indonesia | PBN | 3142 | 9 Feb 2026 | Datang | 76 | 3066 | 36 | 40 | ||||||||||||||||||||||
34 | 0626.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | ISOLATOR;PINPOST;PORC;24KV;;12.5kN | Set | Kentjana Sakti Indonesia | KPS | 3543 | Datang | 513 | 3030 | 370 | 122 | 21 | ||||||||||||||||||||||
35 | 0626.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | ISOLATOR;PINPOST;PORC;24KV;;12.5kN | Set | Kentjana Sakti Indonesia | PRY | 3000 | 18 Feb 2026 | Datang | 1470 | 1553 | 972 | 475 | ||||||||||||||||||||||
36 | 0626.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | ISOLATOR;PINPOST;PORC;24KV;;12.5kN | Set | Kentjana Sakti Indonesia | PBN | 10000 | Datang | 41 | 9959 | 12 | 29 | 10000 | ||||||||||||||||||||||
37 | 0629.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | LVSB;DIST;3P;400V;250A;2LINE;OD | Set | Panel Global Energi Indonesia | KPS | 5 | 30-Des-25 | Datang | 5 | 0 | 3 | 2 | ||||||||||||||||||||||
38 | 0631.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | LVSB;DIST;3P;400V;250A;2LINE;OD | Set | Triputra Electric Abadi | KPS | 6 | 24 Feb 2025 | Datang | 5 | 1 | 1 | 2 | 2 | |||||||||||||||||||||
39 | 0631.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | LVSB;DIST;3P;400V;250A;2LINE;OD | Set | Triputra Electric Abadi | PRY | 11 | 23 Feb 2026 | Datang | 2 | 10 | 1 | 11 | ||||||||||||||||||||||
40 | 0631.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | LVSB;DIST;3P;400V;250A;2LINE;OD | Set | Triputra Electric Abadi | PBN | 33 | 24 Feb 2025 | Datang | 17 | 16 | 3 | 1 | 1 | 3 | 3 | 2 | 1 | 3 | ||||||||||||||||
41 | 0631.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | LVSB;DIST;3P;400V;250A;2LINE;OD | Set | Triputra Electric Abadi | BJM | 3 | 24 Feb 2025 | Datang | 0 | 3 | ||||||||||||||||||||||||
42 | 0633.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | TRF DIS;D3;20kV/400V;3P;100kVA;YZN5;OD | Set | Trafoindo Prima Perkasa | KPS | 3 | 2-Jan-26 | Datang | 2 | 1 | 1 | 1 | ||||||||||||||||||||||
43 | 0633.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | TRF DIS;D3;20kV/400V;3P;100kVA;YZN5;OD | Set | Trafoindo Prima Perkasa | PRY | 2 | 2-Jan-26 | Datang | 1 | 1 | 1 | |||||||||||||||||||||||
44 | 0633.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | TRF DIS;D3;20kV/400V;3P;100kVA;YZN5;OD | Set | Trafoindo Prima Perkasa | PBN | 17 | 2-Jan-26 | Datang | 11 | 6 | 2 | 1 | 1 | 1 | 1 | 2 | 1 | 2 | 17 | |||||||||||||||
45 | 0634.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | TRF DIS;D3;20kV/400V;3P;160kVA;YZN5;OD | Set | Trafoindo Prima Perkasa | PRY | 1 | 2-Jan-26 | Datang | 1 | 0 | 1 | |||||||||||||||||||||||
46 | 0636.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | TRF DIS;D3;20kV/400V;3P;50kVA;YZN5;OD | Set | Sintra Sinarindo Elektrik | BJM | 3 | 29-Des-25 | Datang | 3 | 0 | 3 | |||||||||||||||||||||||
47 | 0636.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | TRF DIS;D3;20kV/400V;3P;50kVA;YZN5;OD | Set | Sintra Sinarindo Elektrik | KPS | 8 | 29-Des-25 | Datang | 5 | 3 | 1 | 1 | 1 | 1 | 1 | |||||||||||||||||||
48 | 0636.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | TRF DIS;D3;20kV/400V;3P;50kVA;YZN5;OD | Set | Sintra Sinarindo Elektrik | PRY | 8 | 30-Des-25 | Datang | 8 | 0 | 2 | 2 | 3 | 1 | ||||||||||||||||||||
49 | 0636.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | TRF DIS;D3;20kV/400V;3P;50kVA;YZN5;OD | Set | Sintra Sinarindo Elektrik | PBN | 16 | 30-Des-25 | Datang | 6 | 10 | 1 | 2 | 2 | 1 | 16 | |||||||||||||||||||
50 | 0638.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | POLE;STEEL;20kV;CIRCL;12m;200daN; | Batang | Bakrie Pipe Industries | KPS | 1482 | 9-Mar-2026 | Datang | 288 | 1194 | 90 | 86 | 100 | 2 | 10 | |||||||||||||||||||
51 | 0639.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | POLE;STEEL;20kV;CIRCL;12m;200daN; | Batang | Raja Besi | PBN | 1668 | 20-Feb-2026 | Datang | 374 | 1294 | 145 | 13 | 59 | 157 | ||||||||||||||||||||
52 | 0640.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CABLE PWR;NFA2X-T;3X70+1X70;0.6/1kV;OH | Meter | Pulung Cable Indonesia | PBN | 39177 | 13-Jan-26 | Datang | 8200 | 30977 | 7700 | 500 | ||||||||||||||||||||||
53 | 0642.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CABLE PWR;NFA2X-T;3X70+1X70;0.6/1kV;OH | Meter | Mega Kharisma Makmur | BJM | 10200 | 13-Jan-26 | Datang | 10200 | 0 | 9200 | 1000 | ||||||||||||||||||||||
54 | 0642.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CABLE PWR;NFA2X-T;3X70+1X70;0.6/1kV;OH | Meter | Mega Kharisma Makmur | PBN | 15023 | 13-Jan-26 | Datang | 11200 | 3823 | 2200 | 5900 | 3100 | |||||||||||||||||||||
55 | 0644.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CUT OUT;20kV;6-100A;10kA;125kV | Set | Powerindo Prima Perkasa | KPS | 54 | 12-Des-25 | Datang | 42 | 12 | 12 | 6 | 6 | 9 | 9 | |||||||||||||||||||
56 | 0644.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CUT OUT;20kV;6-100A;10kA;125kV | Set | Powerindo Prima Perkasa | PRY | 33 | 11-Des-25 | Datang | 27 | 6 | 15 | 12 | ||||||||||||||||||||||
57 | 0644.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CUT OUT;20kV;6-100A;10kA;125kV | Set | Powerindo Prima Perkasa | PBN | 150 | 16-Des-25 | Datang | 63 | 87 | 6 | 6 | 12 | 12 | 9 | 6 | 12 | 150 | ||||||||||||||||
58 | 0646.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CABLE PWR;NYY;1X95mm2;0.6/1kV;Opstig | Meter | Magnakabel Nusantara | PRY | 108 | 07 - Jan - 2026 | Datang | 0 | 108 | ||||||||||||||||||||||||
59 | 0648.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | LA;20-24kV;K;10kA;POLYMER | Set | Insindo Inti Abadi | KPS | 54 | 23-Des-25 | Datang | 33 | 21 | 6 | 3 | 6 | 9 | 9 | |||||||||||||||||||
60 | 0648.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | LA;20-24kV;K;10kA;POLYMER | Set | Insindo Inti Abadi | PRY | 33 | 23-Des-25 | Datang | 24 | 9 | 12 | 12 | ||||||||||||||||||||||
61 | 0648.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | LA;20-24kV;K;10kA;POLYMER | Set | Insindo Inti Abadi | PBN | 150 | 24-Des-25 | Datang | 66 | 84 | 6 | 6 | 12 | 12 | 9 | 6 | 15 | 150 | ||||||||||||||||
62 | 0649.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CONDUCTOR;AAAC-S;70mm2; | Meter | Ztt Cable Indonesia | KPS | 194397 | 28-Jan-26 | Datang | 28081 | 166316 | 13027 | 15054 | ||||||||||||||||||||||
63 | 0649.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CONDUCTOR;AAAC-S;70mm2; | Meter | Ztt Cable Indonesia | PBN | 74406 | 04 Feb 2026 | Datang | 70481 | 3925 | 30481 | 40000 | 74406 | |||||||||||||||||||||
64 | 0649.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CONDUCTOR;AAAC-S;70mm2; | Meter | Ztt Cable Indonesia | PRY | 81197 | 21-Jan-26 | Datang | 81197 | 0 | 26954 | 45281 | 8962 | |||||||||||||||||||||
65 | 0650.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CONDUCTOR;AAAC-S;70mm2; | Meter | Jembo Cable Company Tbk | KPS | 100000 | 13-Jan-26 | Datang | 99.735 | 265 | 24.527 | 41.154 | 34.054 | |||||||||||||||||||||
66 | 0650.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CONDUCTOR;AAAC-S;70mm2; | Meter | Jembo Cable Company Tbk | PRY | 100000 | 12-Jan-26 | Datang | 83.081 | 16.919 | 83.081 | |||||||||||||||||||||||
67 | 0651.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CONDUCTOR;AAAC-S;70mm2; | Meter | Voksel Electric Tbk | PBN | 350000 | 29 Jan 2026 | Datang | 0 | 350000 | ||||||||||||||||||||||||
68 | 0652.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CONDUCTOR;AAAC-S;70mm2; | Meter | Kabelindo Murni Tbk | PBN | 300000 | 8-Jan-26 | Datang | 197.919 | 102.081 | 32.000 | 20.830 | 50.881 | 62081 | 8.000 | 24.127 | ||||||||||||||||||
69 | 0653.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CONDUCTOR;AAAC-S;70mm2; | Meter | Citra Mahasurya Industries | PRY | 150000 | 1/15/2026 | Datang | 109.610 | 40.390 | 37.745 | 1.538 | 68.727 | 1.600 | 150000 | |||||||||||||||||||
70 | 0655.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CONDUCTOR;AAAC-S;70mm2; | Meter | Prima Indah Lestari | BJM | 34181 | 12 Feb 2026 | Datang | 181 | 34000 | 181 | |||||||||||||||||||||||
71 | 0655.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CONDUCTOR;AAAC-S;70mm2; | Meter | Prima Indah Lestari | PBN | 110830 | 11 Feb 2025 | Datang | 0 | 110830 | ||||||||||||||||||||||||
72 | 0656.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CABLE PWR;NYY;1X70mm2;0.6/1kV;Opstig | Meter | Bicc Berca Cables | PBN | 392 | 16-Jan-26 | Datang | 216 | 176 | 108 | 108 | ||||||||||||||||||||||
73 | 0656.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CABLE PWR;NYY;1X70mm2;0.6/1kV;Opstig | Meter | Bicc Berca Cables | PRY | 1728 | 15-Jan-26 | Datang | 1296 | 432 | 324 | 216 | 216 | 324 | 216 | |||||||||||||||||||
74 | 0656.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CABLE PWR;NYY;1X70mm2;0.6/1kV;Opstig | Meter | Bicc Berca Cables | KPS | 1188 | 15-Jan-26 | Datang | 972 | 216 | 324 | 108 | 108 | 216 | 216 | |||||||||||||||||||
75 | 0658.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CABLE PWR;NYY;1X70mm2;0.6/1kV;Opstig | Meter | Prysmian Cable Indonesia | PBN | 2848 | 2-Jan-26 | Datang | 1296 | 1552 | 324 | 324 | 216 | 108 | 324 | 2848 | ||||||||||||||||||
76 | 0659.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CONDUCTOR;AAAC-S;70mm2; | Meter | KMI Wire and Cable Tbk | PBN | 101355 | 28 Jan 2026 | Datang | 0 | 101355 | ||||||||||||||||||||||||
77 | 0660.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CABLE PWR;NFA2X-T;3X70+1X70;0.6/1kV;OH | Meter | KMI Wire and Cable Tbk | KPS | 19500 | 27 Jan 2026 | Datang | 9875 | 9500 | 3000 | 2500 | 2100 | 2400 | ||||||||||||||||||||
78 | 0660.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CABLE PWR;NFA2X-T;3X70+1X70;0.6/1kV;OH | Meter | KMI Wire and Cable Tbk | PRY | 24900 | 26-Jan-26 | Datang | 24900 | 0 | 4.900 | 7.300 | 7700 | 5000 | ||||||||||||||||||||
79 | 0660.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CABLE PWR;NFA2X-T;3X70+1X70;0.6/1kV;OH | Meter | KMI Wire and Cable Tbk | PBN | 16600 | 28 Jan 2026 | Datang | 10500 | 6100 | 4500 | 5000 | 1000 | |||||||||||||||||||||
80 | 0661.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | POLE;STEEL;20kV;CIRCL;12m;200daN; | Batang | Tiga Pilar Sakato | PBN | 122 | 14 Feb 2026 | Datang | 122 | 0 | 122 | |||||||||||||||||||||||
81 | 0662.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | POLE;STEEL;20kV;CIRCL;14m;350daN; | Batang | Duta Hita Jaya | KPS | 8 | 6-Jan-26 | Datang | 2 | 6 | 2 | |||||||||||||||||||||||
82 | 0663.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | POLE;STEEL;20kV;CIRCL;12m;200daN; | Batang | Duta Hita Jaya | KPS | 239 | 10 Feb 2026 | Datang | 239 | 0 | 55 | 184 | ||||||||||||||||||||||
83 | 0663.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | POLE;STEEL;20kV;CIRCL;12m;200daN; | Batang | Duta Hita Jaya | PBN | 3750 | 20-Feb-2026 | Datang | 559 | 3191 | 145 | 144 | 270 | 3750 | ||||||||||||||||||||
84 | 0685.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | LA;20-24kV;K;10kA;POLYMER | Set | Triputra Electric Abadi | PRY | 45 | 27-Jan-26 | Datang | 0 | 45 | ||||||||||||||||||||||||
85 | 0686.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | TRF DIS;D3;20kV/400V;3P;160kVA;YZN5;OD | Set | Bambang Djaja | PRY | 2 | 3 Feb 2026 | Datang | 0 | 2 | ||||||||||||||||||||||||
86 | 0687.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | TRF DIS;D3;20kV/400V;3P;100kVA;YZN5;OD | Set | Bambang Djaja | PRY | 9 | 3 Feb 2026 | Datang | 0 | 9 | ||||||||||||||||||||||||
87 | 0688.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CABLE PWR;NFA2X-T;3X70+1X70;0.6/1kV;OH | Meter | KMI Wire and Cable Tbk | PRY | 20600 | 24 Feb 26 | Datang | 3100 | 17500 | 200 | 2900 | 20600 | |||||||||||||||||||||
88 | 0689.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CABLE PWR;NFA2X-T;3X70+1X70;0.6/1kV;OH | Meter | Sutrakabel Intimandiri | PRY | 15200 | 9 Feb 2026 | Datang | 6500 | 8700 | 3000 | 3500 | 15200 | |||||||||||||||||||||
89 | 0690.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | LVSB;DIST;3P;400V;250A;2LINE;OD | Set | Bambang Djaja | PRY | 11 | 14 Feb 2026 | Datang | 9 | 2 | 2 | 3 | 1 | 3 | ||||||||||||||||||||
90 | 0692.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | POLE;STEEL;20kV;CIRCL;14m;350daN; | Set | Bakrie Pipe Industries | PRY | 2 | Belum | 0 | 2 | |||||||||||||||||||||||||
91 | 0694.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CUT OUT;20kV;6-100A;10kA;125kV | Set | Powerindo Prima Perkasa | PRY | 42 | 19-Jan-26 | Datang | 0 | 42 | ||||||||||||||||||||||||
92 | 0697.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CABLE PWR;NYY;1X95mm2;0.6/1kV;Opstig | Meter | Sumi Indo Kabel Tbk | PRY | 216 | 28-Jan-26 | Datang | 108 | 108 | 108 | |||||||||||||||||||||||
93 | 0699.PJ/DAN.01.01/F13000000/2025 | UP2K KALTENG | CABLE PWR;NYY;1X70mm2;0.6/1kV;Opstig | Meter | Prysmian Cable Indonesia | PRY | 864 | 26-Jan-26 | Datang | 0 | 864 | ||||||||||||||||||||||||
94 | |||||||||||||||||||||||||||||||||||
95 | |||||||||||||||||||||||||||||||||||
96 | |||||||||||||||||||||||||||||||||||
97 | SISA MATERIAL DILUAR 18 DESA ABT (RENCANA APLN) | SATUAN | JUMLAH | ||||||||||||||||||||||||||||||||
98 | |||||||||||||||||||||||||||||||||||
99 | CABLE PWR;NFA2X-T;3X70+1X70;0.6/1kV;OH | METER | 76600 | ||||||||||||||||||||||||||||||||
100 | CABLE PWR;NYY;1X70mm2;0.6/1kV;Opstig | METER | 3240 |