ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
2
3
30 Year Maintenance Matrix
4
School:
John Brown Elementary 1962
5
Acres 31.627
6
ReplacePaintingADAPlaygroundData/PhoneShort RangeLong Range
7
RoofCarpet/TileExterior/InteriorMechanicalImprovementsSafetySafety/SecurityNeedsNeeds
8
2005
9
2006
10
2007
11
2008
12
2009
13
2010
14
20112
15
2012Classroom's/office doneNew structure installed
16
2013
17
2014Some interiorNew structure installed
18
2015
19
2016Led lighting upgrade
20
2017Some interior
21
2018Refer to roof matrixSwingset replacedWindow safety film installed. Beacons installed.
22
2019Refer to roof matrixSome interiorBeacons installed
23
20203/4 of the water valves replacedTwo new play pieces added
24
2021Refer to roof matrixSome interiorRemainder of water valves replacedSome sidwalk beveling done
25
2022 Refer to roof matrix4
26
2023Large tile floor sections completed per insuranceSidewalk section at library entrance replaced
27
2024Perimeter fencing upgraded to 6ft. Additional electronic access points needed.
28
2025Sidewalks/curbing need replacedPlay structure replacement as needed
29
2026Phase one carpetBackup power supply needed battery/generator
30
2027New gym unit needed,parking lot striping and seal needed. New bleachers needed,various play structures need replaced. Exterior renovation to include windows,doors,siding, and paint. IT based clock upgrade needed.
31
2028 Fire panel replacementImproved site drainage needed
32
2029Gutters replaced/additional gutters neededPreventative tree removal
33
2030Updated Landscaping
34
2031Additional playground drainage needed.
35
2032Additional storage needed
36
2033Interior renovation needed to include mechanical,electrical,flooring,plumbing,hvac controls. ADA updatesExterior/Interior new key codes needed
37
2034Gym flooring replaced with carpet/wood/rubber.Parkng lot needs replaced
38
39
(1)Per roofing matrix
40
(2)
If inspection shows need, carpeted areas will be re-carpeted
41
(3)
Playground will be reviewed for potential equipment replacement
42
(4)
Replace phone system with Voice over IP system
43
44
45
OTHER:
46
Interior painting performed every year as needed.
47
Heating system maintenance performed annually as needed. Equipment replacement will occur as required.
48
Parking lot and sidewalks reviewed annually and repaired as necessary
49
Building inspection reports are reviewed and items dealt with prior to beginning of next school year
50
Routine maintenance (lights, locks, ceiling tiles, etc.) are taken care of as needed
51
Fire alarm & sprinkler systems are inspected annually as required and any concerns dealt with as necessary
52
Future technology needs will be evaluated and plans developed as needed
53
Radon testing is performed in various buildings each year and mitigation is performed where needed.
54
55
Sidewalk sq ft = 6,154.69 sq ftParking lot sq ft = 33,906.95 sq ft
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100