| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | ||||||||||||||||||||||||||
2 | Schedule 1: Plant and Mandatory Spare Parts | |||||||||||||||||||||||||
3 | ||||||||||||||||||||||||||
4 | ||||||||||||||||||||||||||
5 | Unit Prices / Rates | Total Prices | ||||||||||||||||||||||||
6 | Supplied Locally | Supplied from outside the Purchaser’s Country | Price | Supplied Locally | Supplied from outside the Purchaser’s Country | Price | ||||||||||||||||||||
7 | Component No. | Component Description | Acronyms | Country of Origin Code | Quantity | [ insert: local currency] | [ insert: local currency] | EUR/USD | [ insert: local currency] | [ insert: local currency] | EUR/USD | |||||||||||||||
8 | Fibre Optic Links (all sub-items including Engineering and Design) | |||||||||||||||||||||||||
9 | 1 | WEST | ||||||||||||||||||||||||
10 | 1.1 | Fibre Optic Link 110 kV , Hincesti - Carpineni | 46.6 km route | |||||||||||||||||||||||
11 | 1.1.1 | OPGW Optical ground wire with 24 fibres according to specification and consideration of shieldwire type including excess lengths and spare loops for downleads to jointing boxes | OPGW | lot | ||||||||||||||||||||||
12 | 1.1.2 | Jointing Boxes, Terminal type including splicing cassettes according to specification, including all fixing to towers, and spare loops to tower structure | JB-TER | lot | ||||||||||||||||||||||
13 | 1.1.3 | Jointing Boxes, Intermediate type including splicing cassettes according to specification, including all fixing to towers and spare loops to tower structure | JB-INT | lot | ||||||||||||||||||||||
14 | 1.1.4 | OPGW Final Tension Sets incl. Armour rods, vibration dampers, earthing connections inclusive all materials for fixing to towers | TN-FIN | lot | ||||||||||||||||||||||
15 | 1.1.5 | OPGW Passing Tension Sets incl. armour rods, vibration dampers, earthing connections inclusive all materials for fixing to towers | TN-PAS | lot | ||||||||||||||||||||||
16 | 1.1.6 | OPGW Joint Tension Sets incl. Armour rods, vibration dampers, earthing connections inclusive all materials for fixing to towers | TN-JNT | lot | ||||||||||||||||||||||
17 | 1.1.7 | OPGW Suspension Sets incl. armour rods, vibration dampers, earthing connection inclusive all materials for fixing to towers | SP-ORD | lot | ||||||||||||||||||||||
18 | 1.1.8 | OPGW Special Suspension Sets incl. armour rods, vibration dampers, earthing connection inclusive all materials for fixing to towers | SP-SPEC | lot | ||||||||||||||||||||||
19 | 1.1.9 | Miscellaneous other items necessary for completion of the OPGW links | MSC | lot | ||||||||||||||||||||||
20 | ||||||||||||||||||||||||||
21 | 1.2 | Fibre Optic Link 110 kV , Carpineni - Cioara | 22.6 km route | |||||||||||||||||||||||
22 | 1.2.1 | OPGW Optical ground wire with 24 fibres according to specification and consideration of shieldwire type including excess lengths and spare loops for downleads to jointing boxes | OPGW | lot | ||||||||||||||||||||||
23 | 1.2.2 | Jointing Boxes, Terminal type including splicing cassettes according to specification, including all fixing to towers, and spare loops to tower structure | JB-TER | lot | ||||||||||||||||||||||
24 | 1.2.3 | Jointing Boxes, Intermediate type including splicing cassettes according to specification, including all fixing to towers and spare loops to tower structure | JB-INT | lot | ||||||||||||||||||||||
25 | 1.2.4 | OPGW Final Tension Sets incl. Armour rods, vibration dampers, earthing connections inclusive all materials for fixing to towers | TN-FIN | lot | ||||||||||||||||||||||
26 | 1.2.5 | OPGW Passing Tension Sets incl. armour rods, vibration dampers, earthing connections inclusive all materials for fixing to towers | TN-PAS | lot | ||||||||||||||||||||||
27 | 1.2.6 | OPGW Joint Tension Sets incl. Armour rods, vibration dampers, earthing connections inclusive all materials for fixing to towers | TN-JNT | lot | ||||||||||||||||||||||
28 | 1.2.7 | OPGW Suspension Sets incl. armour rods, vibration dampers, earthing connection inclusive all materials for fixing to towers | SP-ORD | lot | ||||||||||||||||||||||
29 | 1.2.8 | OPGW Special Suspension Sets incl. armour rods, vibration dampers, earthing connection inclusive all materials for fixing to towers | SP-SPEC | lot | ||||||||||||||||||||||
30 | 1.2.9 | Miscellaneous other items necessary for completion of the OPGW links | MSC | lot | ||||||||||||||||||||||
31 | ||||||||||||||||||||||||||
32 | 1.3 | Fibre Optic Link 110 kV , Cioara - Husi | 18.0 km route | |||||||||||||||||||||||
33 | 1.3.1 | OPGW Optical ground wire with 24 fibres according to specification and consideration of shieldwire type including excess lengths and spare loops for downleads to jointing boxes | OPGW | lot | ||||||||||||||||||||||
34 | 1.3.2 | Jointing Boxes, Terminal type including splicing cassettes according to specification, including all fixing to towers, and spare loops to tower structure | JB-TER | lot | ||||||||||||||||||||||
35 | 1.3.3 | Jointing Boxes, Intermediate type including splicing cassettes according to specification, including all fixing to towers and spare loops to tower structure | JB-INT | lot | ||||||||||||||||||||||
36 | 1.3.4 | OPGW Final Tension Sets incl. Armour rods, vibration dampers, earthing connections inclusive all materials for fixing to towers | TN-FIN | lot | ||||||||||||||||||||||
37 | 1.3.5 | OPGW Passing Tension Sets incl. armour rods, vibration dampers, earthing connections inclusive all materials for fixing to towers | TN-PAS | lot | ||||||||||||||||||||||
38 | 1.3.6 | OPGW Joint Tension Sets incl. Armour rods, vibration dampers, earthing connections inclusive all materials for fixing to towers | TN-JNT | lot | ||||||||||||||||||||||
39 | 1.3.7 | OPGW Suspension Sets incl. armour rods, vibration dampers, earthing connection inclusive all materials for fixing to towers | SP-ORD | lot | ||||||||||||||||||||||
40 | 1.3.8 | OPGW Special Suspension Sets incl. armour rods, vibration dampers, earthing connection inclusive all materials for fixing to towers | SP-SPEC | lot | ||||||||||||||||||||||
41 | 1.3.9 | Miscellaneous other items necessary for completion of the OPGW links | MSC | lot | ||||||||||||||||||||||
42 | ||||||||||||||||||||||||||
43 | 2 | NORTH - WEST | ||||||||||||||||||||||||
44 | 2.1 | Fibre Optic Link 110 kV , Balti - Falesti | 35.25 km route | |||||||||||||||||||||||
45 | 2.1.1 | OPGW Optical ground wire with 24 fibres according to specification and consideration of shieldwire type including excess lengths and spare loops for downleads to jointing boxes | OPGW | lot | ||||||||||||||||||||||
46 | 2.1.2 | Jointing Boxes, Terminal type including splicing cassettes according to specification, including all fixing to towers, and spare loops to tower structure | JB-TER | lot | ||||||||||||||||||||||
47 | 2.1.3 | Jointing Boxes, Intermediate type including splicing cassettes according to specification, including all fixing to towers and spare loops to tower structure | JB-INT | lot | ||||||||||||||||||||||
48 | 2.1.4 | OPGW Final Tension Sets incl. Armour rods, vibration dampers, earthing connections inclusive all materials for fixing to towers | TN-FIN | lot | ||||||||||||||||||||||
49 | 2.1.5 | OPGW Passing Tension Sets incl. armour rods, vibration dampers, earthing connections inclusive all materials for fixing to towers | TN-PAS | lot | ||||||||||||||||||||||
50 | 2.1.6 | OPGW Joint Tension Sets incl. Armour rods, vibration dampers, earthing connections inclusive all materials for fixing to towers | TN-JNT | lot | ||||||||||||||||||||||
51 | 2.1.7 | OPGW Suspension Sets incl. armour rods, vibration dampers, earthing connection inclusive all materials for fixing to towers | SP-ORD | lot | ||||||||||||||||||||||
52 | 2.1.8 | OPGW Special Suspension Sets incl. armour rods, vibration dampers, earthing connection inclusive all materials for fixing to towers | SP-SPEC | lot | ||||||||||||||||||||||
53 | 2.1.9 | Miscellaneous other items necessary for completion of the OPGW links | MSC | lot | ||||||||||||||||||||||
54 | ||||||||||||||||||||||||||
55 | 2.2 | Fibre Optic Link 110 kV , Falesti - Risipeni | 19.10 km route | |||||||||||||||||||||||
56 | 2.2.1 | OPGW Optical ground wire with 24 fibres according to specification and consideration of shieldwire type including excess lengths and spare loops for downleads to jointing boxes | OPGW | lot | ||||||||||||||||||||||
57 | 2.2.2 | Jointing Boxes, Terminal type including splicing cassettes according to specification, including all fixing to towers, and spare loops to tower structure | JB-TER | lot | ||||||||||||||||||||||
58 | 2.2.3 | Jointing Boxes, Intermediate type including splicing cassettes according to specification, including all fixing to towers and spare loops to tower structure | JB-INT | lot | ||||||||||||||||||||||
59 | 2.2.4 | OPGW Final Tension Sets incl. Armour rods, vibration dampers, earthing connections inclusive all materials for fixing to towers | TN-FIN | lot | ||||||||||||||||||||||
60 | 2.2.5 | OPGW Passing Tension Sets incl. armour rods, vibration dampers, earthing connections inclusive all materials for fixing to towers | TN-PAS | lot | ||||||||||||||||||||||
61 | 2.2.6 | OPGW Joint Tension Sets incl. Armour rods, vibration dampers, earthing connections inclusive all materials for fixing to towers | TN-JNT | lot | ||||||||||||||||||||||
62 | 2.2.7 | OPGW Suspension Sets incl. armour rods, vibration dampers, earthing connection inclusive all materials for fixing to towers | SP-ORD | lot | ||||||||||||||||||||||
63 | 2.2.8 | OPGW Special Suspension Sets incl. armour rods, vibration dampers, earthing connection inclusive all materials for fixing to towers | SP-SPEC | lot | ||||||||||||||||||||||
64 | 2.2.9 | Miscellaneous other items necessary for completion of the OPGW links | MSC | lot | ||||||||||||||||||||||
65 | ||||||||||||||||||||||||||
66 | 2.3 | Fibre Optic Link 110 kV , Risipeni - Cioropcani | 9.5 km route | |||||||||||||||||||||||
67 | 2.3.1 | OPGW Optical ground wire with 24 fibres according to specification and consideration of shieldwire type including excess lengths and spare loops for downleads to jointing boxes | OPGW | lot | ||||||||||||||||||||||
68 | 2.3.2 | Jointing Boxes, Terminal type including splicing cassettes according to specification, including all fixing to towers, and spare loops to tower structure | JB-TER | lot | ||||||||||||||||||||||
69 | 2.3.3 | Jointing Boxes, Intermediate type including splicing cassettes according to specification, including all fixing to towers and spare loops to tower structure | JB-INT | lot | ||||||||||||||||||||||
70 | 2.3.4 | OPGW Final Tension Sets incl. Armour rods, vibration dampers, earthing connections inclusive all materials for fixing to towers | TN-FIN | lot | ||||||||||||||||||||||
71 | 2.3.5 | OPGW Passing Tension Sets incl. armour rods, vibration dampers, earthing connections inclusive all materials for fixing to towers | TN-PAS | lot | ||||||||||||||||||||||
72 | 2.3.6 | OPGW Joint Tension Sets incl. Armour rods, vibration dampers, earthing connections inclusive all materials for fixing to towers | TN-JNT | lot | ||||||||||||||||||||||
73 | 2.3.7 | OPGW Suspension Sets incl. armour rods, vibration dampers, earthing connection inclusive all materials for fixing to towers | SP-ORD | lot | ||||||||||||||||||||||
74 | 2.3.8 | OPGW Special Suspension Sets incl. armour rods, vibration dampers, earthing connection inclusive all materials for fixing to towers | SP-SPEC | lot | ||||||||||||||||||||||
75 | 2.3.8 | Miscellaneous other items necessary for completion of the OPGW links | MSC | lot | ||||||||||||||||||||||
76 | ||||||||||||||||||||||||||
77 | 2.4 | Fibre Optic Link 110 kV , Cioropcani - Ungheni | 25.25 km route | |||||||||||||||||||||||
78 | 2.4.1 | OPGW Optical ground wire with 24 fibres according to specification and consideration of shieldwire type including excess lengths and spare loops for downleads to jointing boxes | OPGW | lot | ||||||||||||||||||||||
79 | 2.4.2 | Jointing Boxes, Terminal type including splicing cassettes according to specification, including all fixing to towers, and spare loops to tower structure | JB-TER | lot | ||||||||||||||||||||||
80 | 2.4.3 | Jointing Boxes, Intermediate type including splicing cassettes according to specification, including all fixing to towers and spare loops to tower structure | JB-INT | lot | ||||||||||||||||||||||
81 | 2.4.4 | OPGW Final Tension Sets incl. Armour rods, vibration dampers, earthing connections inclusive all materials for fixing to towers | TN-FIN | lot | ||||||||||||||||||||||
82 | 2.4.5 | OPGW Passing Tension Sets incl. armour rods, vibration dampers, earthing connections inclusive all materials for fixing to towers | TN-PAS | lot | ||||||||||||||||||||||
83 | 2.4.6 | OPGW Joint Tension Sets incl. Armour rods, vibration dampers, earthing connections inclusive all materials for fixing to towers | TN-JNT | lot | ||||||||||||||||||||||
84 | 2.4.7 | OPGW Suspension Sets incl. armour rods, vibration dampers, earthing connection inclusive all materials for fixing to towers | SP-ORD | lot | ||||||||||||||||||||||
85 | 2.4.8 | OPGW Special Suspension Sets incl. armour rods, vibration dampers, earthing connection inclusive all materials for fixing to towers | SP-SPEC | lot | ||||||||||||||||||||||
86 | 2.4.9 | Miscellaneous other items necessary for completion of the OPGW links | MSC | lot | ||||||||||||||||||||||
87 | ||||||||||||||||||||||||||
88 | 2.5 | Fibre Optic Link 110 kV , Ungheni - Tutora | 16.0 km route | |||||||||||||||||||||||
89 | 2.5.1 | OPGW Optical ground wire with 24 fibres according to specification and consideration of shieldwire type including excess lengths and spare loops for downleads to jointing boxes | OPGW | lot | ||||||||||||||||||||||
90 | 2.5.2 | Jointing Boxes, Terminal type including splicing cassettes according to specification, including all fixing to towers, and spare loops to tower structure | JB-TER | lot | ||||||||||||||||||||||
91 | 2.5.3 | Jointing Boxes, Intermediate type including splicing cassettes according to specification, including all fixing to towers and spare loops to tower structure | JB-INT | lot | ||||||||||||||||||||||
92 | 2.5.4 | OPGW Final Tension Sets incl. Armour rods, vibration dampers, earthing connections inclusive all materials for fixing to towers | TN-FIN | lot | ||||||||||||||||||||||
93 | 2.5.5 | OPGW Passing Tension Sets incl. armour rods, vibration dampers, earthing connections inclusive all materials for fixing to towers | TN-PAS | lot | ||||||||||||||||||||||
94 | 2.5.6 | OPGW Joint Tension Sets incl. Armour rods, vibration dampers, earthing connections inclusive all materials for fixing to towers | TN-JNT | lot | ||||||||||||||||||||||
95 | 2.5.7 | OPGW Suspension Sets incl. armour rods, vibration dampers, earthing connection inclusive all materials for fixing to towers | SP-ORD | lot | ||||||||||||||||||||||
96 | 2.5.8 | OPGW Special Suspension Sets incl. armour rods, vibration dampers, earthing connection inclusive all materials for fixing to towers | SP-SPEC | lot | ||||||||||||||||||||||
97 | 2.5.9 | Miscellaneous other items necessary for completion of the OPGW links | MSC | lot | ||||||||||||||||||||||
98 | ||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||
100 | 3 | Fibre Optic Approach Cable | ||||||||||||||||||||||||