ABCDEFGHIJKLMNOPQRSTUVW
1
Checklist for Contribution of a SPECIFICATION (Rev A, Dec 2016)DateNotes
Who added the notes
2
CONTRIBUTION NAMEBarreleye 1.0 Draft SpecificationPROJECT:SERVERS13-Jan-17Created ChecklistM. Schill
3
CONTRIBUTING MEMBER/COMPANYRackspaceTYPE:SPECIFICATION
4
ADDRESSCATEGORY:<select one>
5
CITY, STATE ZIPLicense:OCPHL-P
6
COMPANY CONTACT:
7
Contact Email: CURRENT STATUS:NOT COMPLETE
8
9
LICENSE & MEMBERSHIP REQUIREMENTLINK TO FILESFoundation ApprovalIC/PL Approval
10
REQUIREDThe Submitter must be a Member of OCP in good standing and has executed the Contributor License Agreement and the Copyright License AgreementRackspace's OCP membership is current through 2-September-2017. - M. Schill
11
PROJECT REVIEW- Submitted has demonstrated ALL of the following: Action RequiredFoundation ApprovalIC/PL Approval
12
REQUIREDThe project lead has reviewed the specification and sufficient review(s) with the projectPL recommends specification is ready for consideration by the IC
13
REQUIREDa) There must be contributor(s) that will submit a Product and ORDERABLE SKU that will meet all criteria in the specification.Submitter has identifies a contributor that will submit a product or orderable SKU.
14
REQUIREDb) That product in (a) above, which adheres to the Specification, shall be capable of meeting at least THREE tenets on the OCP Principles list.Submitter identifies the Accepted Design and provides evidence to foundation
15
REQUIREDc) That Product and it's ORDERABLE SKU(s) in (a) must be contributed as either OCP Inspired™ or OCP Accepted™ , 2) will be available within a reasonable timeframe after release of the specification, and 3) will be available for purchase by any member company.Submitter provides evidence BELOW that product will meet 3 of the tenets.
16
REQUIREDd) The Foundation’s Incubation committee has voted to accept the Specification and all submission checklists, licenses, and membership requirements have been met.
17
CONFORMS TO OCP PRINCIPALS (MUST MEET MINIMUM of THREE CRITERIA). The contributor shall provide engineering evidence that the product meets the tenets and the specification criteria.Action RequiredFoundation ApprovalIC/PL Approval
18
NOT ASSESSED1. Efficiency – A key OCP tenant is efficient design. Aspects that can be considered include (but aren’t limited to) power delivery and conversion, thermal efficiency, platform performance (per-W for example), reducing overall infrastructure costs, reducing code weight, reducing latencies and more.Submitter provides evidence to foundation
19
NOT ASSESSED2. Scale – OCP contributions must be scale-out ready. This means that the technology is designed with the right supporting features to allow for its maintenance in large scale deployments. This includes physical maintenance, remote management, upgradability, error reporting and appropriate documentation. Management tools should strive to adhere to the guideline provided by the OCP Hardware Management Project. Documentation should enable adopters towards a successful deployment, providing guidance on equipment installation, turn on and configuration, as well as physical and remote service.Submitter provides evidence to foundation
20
NOT ASSESSED3. Openness – OCP encourages as much open source contribution as possible, but understands that in certain cases 100% open source contriution may not be possible. Whether fully open source or not, a contribution should strive to comply with a set of already existing open interfaces, at the very least provide one. Providing a solution compatible with already existing OCP contributions is one way to implement existing (open) interfaces.Submitter provides evidence to foundation
21
NOT ASSESSED4. Impact – New OCP contributions must create meaningful positive impact within the OCP ecosystem. This can be attained by introducing efficiency gains, introducing new technologies and products that are valuable for scale out computing, creating a multiplier effect by building on top of already existing OCP solutions, and enabling a more robust supply chain by contributing alternative compatible solutions.Submitter provides evidence to foundation
22
COMPATIBILITY & INTEROPERABILITY INFORMATIONLINK TO FILESFoundation ApprovalIC/PL Approval
23
OPTIONALFile name of uploaded fileLink to additional Supporting Files
24
OPTIONALFile name of uploaded fileLink to additional Supporting Files
25
OPTIONALFile name of uploaded fileLink to additional Supporting Files
26
OPTIONALFile name of uploaded fileLink to additional Supporting Files
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100