ABCDEFGHIJKLMNOPQRSTUVWXYZAAABACADAEAF
1
Tracking sheet - emergency response to acute crises
2
Response
3
Coordination Hub
GovernorateDistrictSub-districtMain disaster
Date of disaster
Criticality
BHA stop-order
Affected (ind.)
TriggerStatusStart dateEnd datePartnerPipelineRNAWASH NFIsSanit.WaterExplanation and recommended presenceDate openLast updated on
4
Sa'adaAL-JawfAl-humidatNoman HilanHigh deprivation>3monthsPriority 34,000LikelyNoPlanned
people in that area depend on water sources, which is drought now, and they need to rehab one water project and connection to their area
5
AdenHadramoutSayounConflict<3monthsPriority 1No372Yes - confirmedNoWater office (GARWSP impacted looted)
6
AdenLahjTubanAWD Cholera<3monthsPriority 1No195Yes - confirmedNo
Sudden and current increase of cases in the past 4 weeks (23 case confirmed and 152suspected)
7
AdenAbyanZinjibarAWD Cholera<3monthsPriority 1No153Yes - confirmedNo
Sudden and current increase of cases in the past 4 weeks (22 case confirmed and 152suspected)
8
At Turba & WCTaiz
Taiz city districts
main districts (Al-mudhafar, Salah, Al-Qahirah )
Multiple>3monthsPriority 1Yes182,000Yes - confirmedYes - started
SI ,SCI , HDP, BDF , Altwassol .
NoYesYes
critical Taizz City is currently facing a critical water crisis affecting the majority of the population across its three main districts, as well as several rural areas, including two villages in and Al-Kalaiba area in Al-Ma’afer District. Emergency water trucking to ensure immediate access to safe drinking water .

Fuel support to sustain the operation of existing water systems is very critical needs .

Quick rehabilitation of damaged water infrastructure

3/1/2026
9
At Turba & WCAl HudaydahAlwaziayhAlmashwilah High deprivation<3monthsPriority 1Yes2,400Yes - confirmedYes - startedPUI , IRC YesYesYesYesYES
The water shortage occurred due to the failure of the main well three months ago. In response to the WASH Cluster alert, PUI immediately started water trucking to support the affected communities. IRC also supported the affected families through hygiene kit (HK) distributions. Currently, partners are working on the rehabilitation of water sources; however, these interventions will only partially address the needs. We have recommended rehabilitating the old damaged borehole, but this requires a high-level technical assessment. At present, none of the partners have the required technical capacity or budget to undertake this work or to drill a new well.
3/1/2026
10
At Turba & WCTaizAlmoka AlzhariHigh deprivation<3monthsPriority 3Yes2,450Yes - confirmedNo1/1/202630/3/206PUre HandsNoYesNOYESYES
Windstorm damages Jawfain Al Awmar water project solar pumping system . This gap have been already cvred and Pure Hands orginzation responed to WASH cluster alerts and covred the needs in the area . this alert will be closed .
1,Dec ,202510 March 2026
11
At Turba & WCTaiz
Ash Shamayatayn
AlturbaDisplacement>3monthsPriority 3Yes665Yes - confirmedNoYesYesYesYesYes
we observed a significant accumulation of solid waste affecting 95 IDP families at Al Kadarah IDP site. While your ongoing project in Al Turbah supports IDPs and the most vulnerable communities, it is important to address the accumulated waste through a one-time safe disposal in parallel to prevent further public health risks. the upadted on this that we worked with two parters BCFHD and GWQ to realcocated soem resources that can ocver this gap .
3/10/2026
12
At Turba & WCTaizJabal Habashy
Al-Mulaiki and Mushrifah
Displacement<3monthsPriority 3Yes205Yes - confirmedYes - plannedNMO PlannedNoYesYesYes
There is a significant water shortage in this area, particularly affecting the IDP sites. Around 164 households do not have safe access to water. As the WASH Cluster, we requested the CCCM Cluster and the CCCM partner to prioritize these WASH needs, as no WASH partners are currently available in this area. Therefore, CCCM funding was considered the last available resource to cover these life-saving needs. We have already endorsed their plan, and implementation will start as soon as possible
10 March 2026
13
At Turba & WCTaizAlmaferAlkalaibah High deprivation<3monthsPriority 1Yes6,400Yes - confirmedNoNoPlannedNOYESYES
water shortage to cover the dialysis center’s needs still a gap only Pur hands are intrested to drail a new well in the ara but not confirmed yet
1,Dec ,20253/10/2026
14
At Turba & WCTaizAl Mudhaffarall the sub dsitrctsAWD Cholera<3monthsPriority 1Yes230Yes - confirmedNo
Al-Mudaffar district is considered the most affected district by cholera cases. CARE currently has available funding to respond to any reported cholera cases
10 March 2026
15
At Turba & WCTaizMaqbanah
Ja'aoud area - Al-Qahifah Sub-district
<3monthsPriority 3Yes805Yes - confirmedNo
GWQ, OXFAM
NoYesYES YesYes
Oxfam is currently working on the water connections and GWQ has supported the construction of latrines. However, these families still need to be covered through the distribution of hygiene kits (HKs).
1 March 2026
16
At Turba & WCAl HudaydahAlkhwkah
Al-Jashah Camp
Jahbar Camp
Al-Jashah Village
Old Al-Wa‘rah Camp
New Al-Wa‘rah Camp
Ma’wa Rahmah Residential City
Basmat Amal Residential City
Ata’a Camp
Al-Alili Camp
High deprivation<3monthsPriority 1Yes29400Yes - confirmedNoACFNoPlannedNO yes
Emergency fecal sludge management FSM: desludging of approximately 818 m³ of wastewater, safe transport to a designated disposal site (4 km east of Al-Khokha), construction of temporary lined reception ponds, and chlorination to mitigate public health and environmental risks in targeted IDP camps.
implementation period: 10 days
3/10/2026
17
Ma'ribAl JawfKhab Wa ShaafHigh deprivation<3monthsPriority 1No340Yes - confirmedNoNoYesYesYesAWD/Cholera, new IDPs
18
Ma'ribMa'ribMa'rib Al WadiDisplacement<3monthsPriority 1Yes500Yes - confirmedNoYesNoYesYesYes
Strong wind - 1 week before / rapid phase covered - exit plan still needed
19
Ma'ribMa'ribMa'rib CityDisplacement<3monthsPriority 1Yes301Yes - confirmedNoYesNoYesYesYes
Under eviction threat (under relocation) / rapid phase covered - still need exit plan
20
Ma'ribMaribMar'ib CityOther<3monthsPriority 1YeshighNoNoYesYesYesUnder eviction threat (under relocation)
21
IbbTaizMaqbanaMultiple<3monthsPriority 110,000LikelyNo
22
IbbAd DaliAl HushaAWD Cholera<3monthsPriority 13,500Yes - confirmedNo
23
Sana'aDhamarWusab AssafilWusab AssafilHigh deprivation>1yearPriority 1Yes18,000Yes - confirmedNoAWD/Cholera, Malnutrition, IDPs
24
Sana'aSanaaBani AlharethBani AlharethNutrition & WASH>1yearPriority 1No38,500LikelyNo
High need to implement sanitation system to reduce AWD/Malnutrtion cases
25
Sana'aAmranAlQaflah
Qaflat Athar, IDPs sites and HC around
Displacement>3monthsPriority 1Yes9,800Yes - confirmedNoNo access to water at IDPs sites and HC around
26
IbbIbbAd Dhihar
One Mal camp, Behind El Fakhama Hotel, Al saaluh Alkbraa Camp
Flood<3monthsPriority 11,491Yes - confirmedNoYes
No access to safe and affordable water, damaged sanitation facilities, high need for a rapid response including the distribution of WASH NFIs, hygiene promotion and cleaning campaign.
27
IbbIbbAl MashannahAlahj campFlood<3monthsPriority 2595Yes - confirmedNoYes
No access to safe and affordable water, damaged sanitation facilities, high need for a rapid response including the distribution of WASH NFIs, hygiene promotion and cleaning campaign.
28
IbbIbbDhi As Sufal
Al Tomouh Site-Al Balk camp-Ghazy camp-Al Gadyaa C camp
Flood<3monthsPriority 3854Yes - confirmedNoYes
No access to safe and affordable water, damaged sanitation facilities, high need for a rapid response including the distribution of WASH NFIs, hygiene promotion and cleaning campaign.
29
Sana'aIbbAl-NadirahMadar water projectFlood<3monthsPriority 16,300
The need for protection works for the well's pumping room and solar power system
30
Sana'aIbbAl-NadirahAlmiftah AlalaFlood<3monthsPriority 17,500
The need for protection works for the pump room, the well site, and the pumping line.
31
Sana'aIbbAlsaddahDar SaeedFlood<3monthsPriority 11,300
The two sources and the need for protection works for the source and the pipes connecting the spring to the reservoir
32
Sana'aIbbDhi As SufalAlmaayenFlood<3monthsPriority 14,200
The need for protection works for the well's pumping room and solar power system
33
Sana'aIbbAl-NadirahZamehFlood<3monthsPriority 15,400
The need for protection works for the well's pumping room and solar power system
34
Sana'aAlmahwitAr RujumAljaradiFlood<3monthsPriority 14,500
35
Sana'aAlmahwitHufashAd DhariFlood<3monthsPriority 25,309
36
Sana'aAlmahwitHufashAs Safqain * (2WS)Flood<3monthsPriority 126,400
37
Sana'aAlmahwitMalhanQiblat Malhan (4 WS)Flood<3monthsPriority 124,271The branch received information from the directorate regarding the needs, but was unable to assess the damage on the ground because the roads were still blocked and work was underway to reopen them by the relevant authorities. Water filters, water tanks, and chlorine were distributed to 383 displaced families in Al-Khabt Directorate through the emergency unit.
38
Sana'aAlmahwitMalhanHamdan (2 WS)Flood<3monthsPriority 17,952
39
Sana'aAlmahwitMalhanHebat and AlamariyahFlood<3monthsPriority 23,500
40
Sana'aAlmahwitJabal AlmahwitQadhahFlood<3monthsPriority 21,800
The need to build a support structure to protect the system
41
Sana'aHajjahSharisArriqaFlood<3monthsPriority 27,000The need to rehabilitate the system
42
Sana'aHajjahAslam AlyamanAlmashouhaFlood<3monthsPriority 22,500
The need to remove the backfill debris from the well, construct a protective wall for the project components, and repair the protective fence that was washed away with the backfilling of the washed-away parts of the site.
43
Sana'aHajjah
Ash Shaghadirah
As SawlemahFlood<3monthsPriority 13,000
Implementation of gabion protection walls, replacement of the pumping unit around the well, and replacement of submersible pipes in the well lost due to flooding.
44
Sana'aHajjah
Ash Shaghadirah
Almazawetah (2 WS)Flood<3monthsPriority 19,000
The need to replace and connect pipes that were swept away by the floods
45
Sana'aAl HudaydahAl MaraweahAsh ShuraaFlood<3monthsPriority 12,180
Breaking down the bases and panels of the solar system - the need for system rehabilitation
46
Sana'aAl HudaydahAs SukhnahAlramyah (Almesbar)Flood<3monthsPriority 16,000
Water network swept away - the need to replace the water network that was swept away by the floods
47
Sana'aAl HudaydahAs SukhnahArredFlood<3monthsPriority 12,500
Part of the network was washed away - there is a need to replace the water network that was swept away by the floods.
48
Sana'aAl HudaydahAl MaraweahAd Dounm (2WS)Flood<3monthsPriority 26,000
The solar panels are broken - the damaged system needs rehabilitation.
49
Sana'aAl HudaydahBoraa
Alkhuzaei (Harr Ash Shmmah)
Flood<3monthsPriority 12,300
The solar panels are broken - the damaged system needs rehabilitation.
50
Sana'aAl HudaydahAlqanawisAlkhalil Ash SharqiFlood<3monthsPriority 11,800Floodwaters entering the well
51
Sana'aAl HudaydahAlqanawisAd DawoodyahFlood<3monthsPriority 23,200
Water network swept away and damaged - the need to replace the network that was swept away by the floods
52
Sana'aAl HudaydahAz ZuhrahAlqamanahFlood<3monthsPriority 14,500
System erosion - the need for relocation or protection work for the solar energy system
53
Sana'aAl HudaydahBait AlfaqeehAd DamahiyahFlood<3monthsPriority 13,670
System erosion - the need for relocation or protection work for the solar energy system
54
Sana'aTaizMaqbanahAd DarahFlood<3monthsPriority 13,250
Damage to the pumping line + damage to the water lines + erosion of (2) cables + partial burial of the well and control room
55
Sana'aMultipleMultipleMultipleFlood<3monthsPriority 1
Maintenance of water and sewage networks in some affected cities
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100