Office of the Executive Vice-President
2
Risks, Risk Level and Mitigation Level
3
For the FY 2021
4
5
OFFICERISKSRISK AREABASELINE RATINGRisk LevelMitigation LevelSeptember 30, 2021Risk LevelMitigation Level31-Dec-21Risk LevelMitigation LevelREMARKSPHOTOS
6
Likelihood
Impact
RPN
Likelihood
Impact
RPN
Likelihood
ImpactRPN
7
Information and Communications Technology Office (ICTO)IT Services Management: Long queue of client requests during student enrollment and adjustment period caused by limited number of frontline personnel (During COVID-19 Pandemic - surge of client requests received thru emails)OPERATIONAL5420ExtremePresident4312SubstantialCollege Dean/Director4312SubstantialCollege Dean/Director
8
Weak University IT Security caused by lack of Information Security (Access Control, Data Privacy, and User Input Validation) resulting in unauthorized infiltration/access to data and systems

Insufficient IT Infrastructure Management caused by lack of ICT Infrastructure and Corrective Maintenance. This may result to a weak data and voice transmission, and less capability to current and near-future network, data and voice technologies
OPERATIONAL5525ExtremePresident4416HighSector VP4416HighSector VP
9
No Internet connection caused by failure of external Internet Service Provider resulting in low office/worker productivityOPERATIONAL31236ExtremePresident248MediumDepartment/Unit111LowProcess Owner
10
Slow or no Internet/network access caused by lack of industry-standard network cabling or limited Internet bandwidth. This may result in low office/worker productivityOPERATIONAL236MediumDepartment/Unit5420ExtremePresident111LowProcess Owner
11
Installed non license software to PUP computers devices cause by unplanned procurement. This may result in legal implications.OPERATIONAL3412SubstantialCollege Dean/Director3412SubstantialCollege Dean/Director224LowProcess Owner
12
Information Systems that are vulnerable to attacks caused by lack of application security and debugging. This may result in data leakage and defective systemOPERATIONAL5420ExtremePresident4416HighSector VP339MediumDepartment/Unit
13
Data leakage of personal information (student, faculty, employee, other sensitive information) caused by hacking of University Information Systems and Online Services. This may result in negative reputation to the University and possible regulatory sanction by the NPC, DICT, and NBIOPERATIONAL4520ExtremePresident4520ExtremePresident3412SubstantialCollege Dean/Director
14
Inspection Management Office (IMO)Delay in the inspection due to non-compliance by the supplier on the delivery and documentary requirements as stipulated in the contract leading to pending insuance of Inspection Report. OPERATIONAL3412SubstantialCollege Dean/Director339MediumDepartment/Unit236MediumDepartment/Unit
15
Difficulty in scouting job-relevant training /seminar due limited information/promotion from training providers which will lead to budget under utilization.OPERATIONAL3412SubstantialCollege Dean/Director236MediumDepartment/Unit236MediumDepartment/Unit
16
Overworked of employees due to understaffed which will lead to decreased of productivity and efficiency. OPERATIONAL5420ExtremePresident3412SubstantialCollege Dean/Director3412SubstantialCollege Dean/Director
17
Unconducive working station due to limited working space leading to non-compliance in the Occupational Safety and Health Standard. OPERATIONAL5525ExtremePresident3515HighSector VP339MediumDepartment/Unit
18
Internal Audit Office (IAO)Lack of manpower (Overutilized / Overworked manpower due to failure of hiring personnel to complete the office roster resulting in multi-tasking and cross-tasking of the units)OPERATIONAL4416HighSector VP4416HighSector VP4312SubstantialCollege Dean/Director
19
Lack of sprinkler system and fire exit doors (Uncontrollable fire incident due to lack of fire alarm & sprinkler system resulting to damage in properties, documents, and injuries to personnel) OPERATIONAL3515HighSector VP3515HighSector VP4312SubstantialCollege Dean/Director
20
Business process discontinuity due to sickness caused by virus infection obtained through face to face transactions leading to discontented clients and bottleneck in the system.OPERATIONAL5525ExtremePresident111LowProcess Owner4312SubstantialCollege Dean/Director
21
Data or process security breach due to failure to de-activate or terminate system access of employees who have been separated from a position, unit or department, or the University which will lead to leakage of sensitive and confidential information.OPERATIONAL5525ExtremePresident4416HighSector VP4312SubstantialCollege Dean/Director
22
Hazards endangering reporting personnel on-site due to Emerging Infectious Diseases which will lead to prolonged sick leaves.OPERATIONAL5525ExtremePresident339MediumDepartment/Unit4312SubstantialCollege Dean/Director
23
Unable to travel to/from office from/to residence due to impassable, flooded roads hindering personnel from reporting to work or going home from work.OPERATIONAL4520ExtremePresident4416HighSector VP4312SubstantialCollege Dean/Director
24
Destruction of electronic equipment and records/documents due to high flood water levels inside office resulting to significantly lower productivity of the unit.OPERATIONAL5525ExtremePresident4416HighSector VP4312SubstantialCollege Dean/Director
25
Non-Compliance to COA and PGIAM Post-Audit Requirements of the Operations and Management Processes of Offices and Colleges within the University in Main Campus, Branches and Campuses.COMPLIANCE5525ExtremePresident4416HighSector VP4312SubstantialCollege Dean/Director
26
Univesity Printing Press (UPP)Fire due to the presence of high tension wire on site and improper installation of some electrical wirings that may result to lost of propertyOPERATIONAL3515HighSector VP3515HighSector VP3515HighSector VP
27
Theft and pilferage due to open access of ground that may result to lootingOPERATIONAL3412SubstantialCollege Dean/Director3412SubstantialCollege Dean/Director3412SubstantialCollege Dean/Director
28
Accident that may be caused by the slippery floor of UPP Building during rainy season due to the inadequately covered terraceOPERATIONAL236MediumDepartment/Unit236MediumDepartment/Unit236MediumDepartment/Unit
29
Disaster Resilience Institute (DRI)Failure to submit agency mandatory reports or requirements within the prescribed period due to lack of manpower, which may prompt sanctionsCOMPLIANCE4416HighSector VP111LowProcess Owner133LowProcess Owner
30
Lack of exit doors and signages that violate the PH fire Code. We also have reversed direction of exit doors.COMPLIANCE4416HighSector VP224LowProcess Owner224LowProcess Owner
31
Untimely release of funds for IEC materials due to red-tape, which may lead to delay of fabrication of expected outputsCOMPLIANCE248MediumDepartment/Unit212LowProcess Owner212LowProcess Owner
32
Delay in the procurement of equipment which will be used for projects, campaigns, and daily work. This may result to failure to effectively anticipate, to repond to, and to recover from potential natural or man-made emergencies. COMPLIANCE4520ExtremePresident339MediumDepartment/Unit339MediumDepartment/Unit
33
Uncertainty in the approval of the budget requested due to no previous allocation for: the Occupational & Healthy Workplace Program, DRC Capability Building, DRRM and Disaster Resilience Leadership Program, Program,Disaster Risk Reduction and Management (DRRM) Institutional and Promotional Academic Development Program, DRRM and Gender Leadership, Gender and Disaster Twinning Program, Disaster Risk Reduction and Management (DRRM) Institutional and Promotional Academic, Development Program, and Disaster Prevention and Mitigation Research. FINANCIAL4520ExtremePresident339MediumDepartment/Unit339MediumDepartment/Unit
34
Tampered or damaged Official Receipts caused by erroneous printing which cannot be reimbursed or liquidatedFINANCIAL248MediumDepartment/Unit111LowProcess Owner111LowProcess Owner
35
One internet lan/source at the officeOPERATIONAL4312SubstantialCollege Dean/Director111LowProcess Owner111LowProcess Owner
36
Lack of Chief for Disaster Training, Education and Public Awareness UnitOPERATIONAL5525ExtremePresident111LowProcess Owner111LowProcess Owner
37
Lack of DRI Administrative StaffOPERATIONAL5420ExtremePresident111LowProcess Owner111LowProcess Owner
38
Unavailable of External or Outsourced Trainer/Speaker/s on DRRMOPERATIONAL339MediumDepartment/Unit224LowProcess Owner224LowProcess Owner
39
No to low mobile signal at the officeOPERATIONAL4520ExtremePresident339MediumDepartment/Unit339MediumDepartment/Unit
40
Safety and security of officials during field workOPERATIONAL339MediumDepartment/Unit212LowProcess Owner339MediumDepartment/Unit
41
Limited technical resources at the officeOPERATIONAL4312SubstantialCollege Dean/Director339MediumDepartment/Unit224LowProcess Owner
42
Low research prouctivity due to the weak manpower complementOPERATIONAL428MediumDepartment/Unit224LowProcess Owner224LowProcess Owner
43
Multi-tasking due to the lack of administrative staffOPERATIONAL4416HighSector VP236MediumDepartment/Unit236MediumDepartment/Unit
44
Lack of sprinkler system, signages, and fire exitsOPERATIONAL4416HighSector VP339MediumDepartment/Unit339MediumDepartment/Unit
45
Lack of first aid kit and toolsOPERATIONAL4416HighSector VP339MediumDepartment/Unit339MediumDepartment/Unit
46
Delay in bringing a patient to the nearest hospitalOPERATIONAL4416HighSector VP339MediumDepartment/Unit339MediumDepartment/Unit
47
No dedicated service verhicle that may endanger officals' health and safetyOPERATIONAL4416HighSector VP339MediumDepartment/Unit339MediumDepartment/Unit
48
Limitation in getting production and/or publishing houses for the development of IEC materialsSTRATEGIC313LowProcess Owner313LowProcess Owner313LowProcess Owner
49
Late announcement of capacity building activities or meetingsSTRATEGIC4312SubstantialCollege Dean/Director224LowProcess Owner224LowProcess Owner
50
Forgery of documents, approvals, etc.REPUTATIONAL144LowProcess Owner111LowProcess Owner144LowProcess Owner
51
Institute of Data and Statistical Analysis (IDSA)Unable to gather online data in remote areas, particularly in Branches/Satellite Campuses outside Metro Manila, due to poor internet connectivity resulting in erroneous statistical report and analysis of data.OPERATIONAL5420ExtremePresident5420ExtremePresident5315HighSector VP
52
Unable to gather online data in remote areas, particularly in Branches/Satellite Campuses outside Metro Manila, due to possible power outage resulting in erroneous statistical report and analysis of data.OPERATIONAL5420ExtremePresident5420ExtremePresident5315HighSector VP
53
Limited time in assessing the client because of unconducive (small scale) working area, resulting to long queue and ineffective interaction with clients.OPERATIONAL5315HighSector VP5420ExtremePresident5315HighSector VP
54
Unable to communicate with internal/external clients thru online platforms due to poor to fair internet connectivity in the office resulting to a delayed processing of internal/external clients' requests.OPERATIONAL5315HighSector VP5315HighSector VP5315HighSector VP
55
Lack of standard turnaround time in processing the Summary of Statistical Results by a Statistical Adviser to be submitted to their respective Statistical Advisee (Client) resulting in the delay of drafting the Client's final thesis paper.OPERATIONAL5315HighSector VP5315HighSector VP5315HighSector VP
56
Limited number of Statistical Advisers with specialization which fit the Client's thesis topic (specialization) resulting to more Clients assigned to these Statistical Advisers than the others.OPERATIONAL5315HighSector VP5315HighSector VP5315HighSector VP
57
Incomplete Evaluation of a Faculty in the Online Faculty Evaluation Survey due to Missing Supervisor (Dean/Director/Chairperson/Academic Head) Evaluation which results to a delayed processing of Overall Rating (Supervisor Evaluation plus Student Evaluation) of a Faculty.OPERATIONAL5315HighSector VP5315HighSector VP5315HighSector VP
58
Narrow office space for movement and no available Fire Exit which results in high risk to IDSA Personnel during emergency situations.OPERATIONAL5420ExtremePresident5420ExtremePresident5420ExtremePresident
59
Office of the International Affairs (OIA)Number of Enrolled Foreign Students: Decrease in the number of foreign student enrollees due to the memorandum issued by CHED in connection with the COVID-19 pandemicCOMPLIANCE339MediumDepartment/Unit224LowProcess Owner224LowProcess Owner
60
University Academic Calendar: Missed opportunities for program mobility secondary to mismatch in academic calendar.OPERATIONAL339MediumDepartment/Unit224LowProcess Owner224LowProcess Owner
61
Partnership Agreement: Missed opportunities / benefits for internationalization due to inactive MOUOPERATIONAL339MediumDepartment/Unit224LowProcess Owner111LowProcess Owner
62
Internet Connectivity: Poor internet connectivity in the office which disrupts holding of internationalization-related events and activities.OPERATIONAL5315HighSector VP224LowProcess Owner224LowProcess Owner
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100