| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | AA | AB | AC | AD | AE | AF | AG | AH | AI | AJ | AK | AL | AM | AN | ||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
6 | Program/Project Title | Implementing Agency | Implementation Schedule | Sector | Fund Source | Funding Agency | Total Program/ Project Cost (PHP) | Financial Status (in PHP exact figures) | Physical Accomplishment | Employment Generated | Remarks | ||||||||||||||||||||||||||||||
7 | Start Date (mm-dd-yyyy) | End Date (mm-dd-yyyy) | Appropriations | Allotment | Obligations | Disbursements | Funding Support (%) | Fund Utilization (%) | Target OWPA to date (%) | Actual OWPA to date (%) | Slippage (%) | M | F | ||||||||||||||||||||||||||||
8 | A. OFFICIAL DEVELOPMENT ASSISTANCE (ODA)-FUNDED PROGRAMS/ PROJECTS | ||||||||||||||||||||||||||||||||||||||||
9 | 1 | Philippine Rural Development Project (PRDP) Scale Up | DA RFO 2 | Official Development Assistance (ODA) - LOAN | WORLD BANK, DA, P/MLGU | 1,392,407,299.08 | 1,528,210,000.00 | 1,393,084,134.89 | 1,358,080,764.53 | 499,382,835.77 | 91.16 | 35.85 | 44.88 | 39.83 | -5.05 | 566 | 26 | ||||||||||||||||||||||||
10 | a) Rehabilitation/Construction of Nanauatan-Lattut Farm-to-Market Road | DA RFO 2 | 11-27-24 | 12-12-26 | Economic Services | Official Development Assistance (ODA) - LOAN | WORLD BANK, DA, P/MLGU | 252,919,097.84 | 257,921,000.00 | 252,919,097.84 | 252,919,097.83 | 105,275,868.05 | 98.06 | 41.62 | 57.39 | 42.43 | -14.96 | 80 | - | Severe delays occurred due to insufficient manpower and frequent equipment breakdowns. Operations were further delayed due to: 1) heavy rains, and 2) unpaid progress billing for 54 calendar days due to the absence of the MLGU Rizal Treasurer. Despite weekly meetings, a required catch-up plan, a May 4, 2026 final warning, and an approved work suspension, the contractor did not comply. The project was terminated on June 6, 2026. | |||||||||||||||||||||
11 | b) Rehabilitation of Poblacion-Labang Farm to Market Road | DA RFO 2 | 10-18-25 | 06-11-26 | Economic Services | Official Development Assistance (ODA) - LOAN | WORLD BANK, DA, P/MLGU | 78,147,352.79 | 88,709,000.00 | 78,147,352.79 | 78,147,352.79 | 47,363,229.83 | 88.09 | 60.61 | 69.49 | 64.53 | -4.96 | 34 | 3 | Insufficient manpower and equipment delayed stone masonry and grouted riprap works, while bad weather prompted a Work Suspension Order. The Municipal Project Management and Implementing Unit (MPMIU) subsequently directed the contractor to deploy adequate resources immediately upon work resumption to prevent further negative slippage. | |||||||||||||||||||||
12 | c) Rehabilitation of Bugallon Proper-Villa Carmen-San Antonio Farm to Market Road (FMR) | DA RFO 2 | 01-25-25 | 07-06-26 | Economic Services | Official Development Assistance (ODA) - LOAN | WORLD BANK, DA, P/MLGU | 117,612,650.00 | 144,310,000.00 | 117,612,650.00 | 117,612,650.00 | 70,967,924.90 | 81.50 | 60.34 | 90.35 | 81.32 | -9.03 | 91 | 1 | The delay was due to late manpower and equipment deployment. Following a joint National Project Coordination Office (NPCO) Regional Infrastructure Engineer (RIE) and Regional Project Coordination Office 02 (RPCO 02) inspection, the PRDP team directed the contractor to submit a catch-up plan by June 15, 2026, for the remaining two-month period. Contractor was reminded that unfinished works past the contract expiry date will incur liquidated damages. | |||||||||||||||||||||
13 | d) Rehabilitation of Sta. Lucia - Sta. Catalina Farm to Market Road with Bridge | DA RFO 2 | 11-22-24 | 04-24-26 | Economic Services | Official Development Assistance (ODA) - LOAN | WORLD BANK, DA, P/MLGU | 183,831,191.67 | 204,279,000.00 | 183,831,191.68 | 183,831,191.68 | 164,502,312.18 | 89.99 | 89.49 | 99.29 | 95.63 | -3.66 | 60 | 1 | Delayed reinforcing steel and structural concrete works caused negative slippage. During a coordination meeting with the MLGU Resident Engineer, the contractor was directed to expedite all delayed activities. | |||||||||||||||||||||
14 | e) Rehabilitation of Rizal- Abra Farm to Market Road | DA RFO 2 | 11-27-24 | 10-08-25 | Economic Services | Official Development Assistance (ODA) - LOAN | WORLD BANK, DA, P/MLGU | 75,890,644.53 | 77,450,000.00 | 75,890,644.53 | 75,890,644.52 | 73,430,325.51 | 97.99 | 96.76 | 100 | 100 | 0.00 | 58 | - | Project completed as of Q1. The subproject was declared completed on January 26, 2026. A final joint inspection was conducted on January 28, 2026. | |||||||||||||||||||||
15 | f) Rehabilitation of Sinsayon-Cabulay Farm to Market Road | DA RFO 2 | 11-27-25 | 06-19-27 | Economic Services | Official Development Assistance (ODA) - LOAN | WORLD BANK, DA, P/MLGU | 131,821,270.93 | 133,827,000.00 | 131,821,270.93 | 131,821,270.93 | 25,981,860.95 | 98.50 | 19.71 | 19.73 | 16.08 | -3.65 | 90 | 0 | Despite positive monthly progress, overall slippage remains negative due to earlier delays in manpower and equipment deployment. | |||||||||||||||||||||
16 | g) Rehabilitation/Improvement of Union-Barcolan Farm to Market Road | DA RFO 2 | 06-25-25 | 04-10-26 | Economic Services | Official Development Assistance (ODA) - LOAN | WORLD BANK, DA, P/MLGU | 14,323,164.20 | 15,000,000.00 | 15,000,000.00 | 14,323,164.20 | 2,171,368.62 | 100.00 | 14.48 | 61.41 | 58.33 | -3.08 | 46 | 19 | By maintaining adequate materials, manpower, and extended work hours during favorable weather, the contractor accelerated PCCP works. Weekly coordination meetings and site instructions by RPCO 02 and LGU representatives led to an augmented workforce, reducing negative slippage. | |||||||||||||||||||||
17 | h) Rehabilitation/Improvement of M.H. Del Pilar - Salvacion Farm to Market Road | DA RFO 2 | 02-04-26 | 10-21-27 | Economic Services | Official Development Assistance (ODA) - LOAN | WORLD BANK, DA, P/MLGU | 215,332,127.14 | 262,700,000.00 | 215,332,127.14 | 197,739,414.42 | 9,689,945.73 | 81.97 | 4.50 | 11.28 | 8.93 | -2.35 | 41 | 2 | Slow progress on grouted riprap and structure excavation caused negative slippage. To resolve this, weekly coordination meetings was held with the MLGU Resident Engineer and contractor staff, who were instructed to expedite works to recover the schedule. | |||||||||||||||||||||
18 | j) Rehabilitation of Oscariz-Burgos-Purok Ni Bulan-Pabil FMR | DA RFO 2 | 05-07-26 | 03-30-28 | Economic Services | Official Development Assistance (ODA) - LOAN | WORLD BANK, DA, P/MLGU | 188,367,999.98 | 199,754,000.00 | 188,367,999.98 | 188,367,999.98 | - | 94.30 | - | 0.81 | 0.37 | -0.44 | 66 | 0 | Because key personnel were not deployed onsite, the contractor plans to replace the Project Manager, Project Engineer, and Materials Engineer II, requiring immediate submission of their bio-data for evaluation. RPCO 02 directed the MPMIU to issue an official reminder letter regarding deployment. | |||||||||||||||||||||
19 | k) Upgrading of Agusi Farm-to-Market Road | DA RFO 2 | 06-04-26 | 06-29-27 | Economic Services | Official Development Assistance (ODA) - LOAN | WORLD BANK, DA, P/MLGU | 134,161,800.00 | 144,260,000.00 | 134,161,800.00 | 117,427,978.18 | - | 93.00 | - | 0.10 | - | -0.10 | 0 | 0 | No significant accomplishment was recorded during this reporting period because the contractor had only recently mobilized its resources. The contractor was directed to immediately deploy equipment and manpower to prevent negative slippage. | |||||||||||||||||||||
20 | 2 | Second Additional Financing for the Philippine Rural Development Project (AF-2) | DA RFO 2 | - | - | Economic Services | Official Development Assistance (ODA) | - | 0.00 | - | - | - | - | - | - | - | - | 0.00 | 0 | 0 | Projects under AF-2 completed. No additional funding received under AF-2 | ||||||||||||||||||||
21 | 3 | Adapting Philippine Agriculture to Climate Change | DA RFO 2 | - | - | Economic Services | Official Development Assistance (ODA) | - | - | - | - | - | - | - | - | - | - | - | - | - | No funds downloaded for project implementation in the region as of the reporting period. | ||||||||||||||||||||
22 | 4 | Rebuilding agricultural livelihoods affected by multiple cyclones in Cagayan Province | FAO | No submission during the reporting period | |||||||||||||||||||||||||||||||||||||
23 | 5 | Water District Development Sector Project (WDDSP) - Design, Supply, Construction, Installation, Testing and Commissioning of Caggay Surface Water Treatment Plant | Metro Tuguegarao Water District | 01-31-23 01-31-23 | 05-19-25 02-21-26 | Economic Services | Official Development Assistance (ODA) - LOAN | Asian Development Bank (ADB) through Local Water Utilities Administration (LWUA) | 320,000,000.00 | 332,216,181.30 | 332,216,181.30 | 223,050,271.12 | 197,188,348.49 | 100.00 | 59.36 | 59.51 | 58.01 | -1.50 | 30 | 2 | Total Time Extension = 490 days (1) Suspension No. 1 = 48 days from October 21 to December 9, 2024 due to continuous rains and flooding that rendered the site inaccessible for construction activities. (2) Extension No. 1 = 30 days, to account for weather-related disruptions—such as rains, typhoons, and flooding—experienced between April 1, 2024, and December 15, 2024. The suspension period was not included in the approved time extension. (3) Suspension No. 2 = 120 days due to delays in the processing of Progress Billing Nos. 3 and 4. (4) Extension No. 2= 69 days to account for weather-related disruptions—such as rains, typhoons, and flooding—experienced between December 20, 2024, and August 31, 2025. (5) Suspension No. 3 = 33 to account for weather-related disruptions—such as rains, typhoons, and flooding—experienced between September 1, and October 31, 2025. (6) Project Variation No. 1 = 90 days (7) Project Variation No. 2 = 100 days | ||||||||||||||||||||
24 | 6 | Supporting Innovation in the Philippine Technical and Vocational Education and Training System (SIPTVETS) Project | TESDA RO2 | 10/03/2025 | 01/09/2026 | General Public Services | Others | Asian Development Bank (ADB) | 163,047,336.22 | 163,047,336.22 | 163,047,336.22 | 163,047,336.22 | 70,632,106.05 | 100.00 | 43.32 | 82.93 | 43.32 | -39.61 | 44 | 6 | Limited availability of materials; Locally hired workers did not initially possess NC II certification upon employment resulting in Delays in meeting the required percentage of NC II-certified skilled workers." | ||||||||||||||||||||
25 | 7 | Philippine Digital Infrastructure Project (PDIP) National Broadband Project | DICT RO2 | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | - | Awaiting actual downloading of funds from the Project Management Team - Central Office (the realization of project implementation in the region is based on the prioritization). As to the RNIP, the next downloading of fund for the Establishment of New GovNet in Region 2 is 2027. | ||||||||||||||||||||
26 | 8 | Philippines Health System Resilience Project (HSRP) | DOH | No data | No data | Social Service | Official Development Assistance (ODA) - Health System Resillience Project (World Bank Funded) | World Bank | 0.00 | - | - | - | - | - | - | - | - | 0.00 | No data | No data | No funding received yet, awaiting approval of the Approved Project Cost for the eight proposed projects | ||||||||||||||||||||
27 | 9 | Health System Enhancement to Address and Limit (HEAL) COVID-19 | DOH | No data | No data | Social Service | No data | No data | 0.00 | - | - | - | - | - | - | - | - | 0.00 | No data | No data | No project implemented or reported by DOH- CVCHD | ||||||||||||||||||||
28 | 10 | Disaster Risk Reduction Enhancement at the Local Level Technical Assistance Program | DILG | No data | No data | Social Service | No data | No data | No project implemented or reported by DILG | ||||||||||||||||||||||||||||||||
29 | 11 | Rural Agro-Enterprise Partnership for Inclusive Development and Growth Project (RAPID Growth) | DTI | The RAPID Growth Project is not being implemented in the region according to DTI2 per letter dated May 7, 2026. | |||||||||||||||||||||||||||||||||||||
30 | B. PUBLIC PRIVATE PARTNERSHIP (PPP) FUNDED PROJECTS | ||||||||||||||||||||||||||||||||||||||||
31 | 1 | Baggao Water Supply Project | MLGU Baggao/ ME Sicat Construction, Inc. | General Public Services | Public-Private Partnership (PPP) | According to LGU Baggao, drilling is ongoing to determine sites for groundwater extraction due to inadequate data from previous identified sites. | |||||||||||||||||||||||||||||||||||
32 | C. LOCALLY-FUNDED PROGRAMS AND PROJECTS | ||||||||||||||||||||||||||||||||||||||||
33 | a. Agricultural Development Programs and Projects | ||||||||||||||||||||||||||||||||||||||||
34 | 1 | Tumauini River Multi-Purpose Project (TRMP) | NIA | 06-01-18 | 12-31-26 | Economic Services | Locally Funded Project - | NIA | 2,777,795,045.16 | 2,777,795,045.16 | 781,237,838.76 | 733,869,730.18 | 728,181,705.22 | 28.12 | 93.21 | 29.94 | 26.19 | -3.75 | 721 | 22 | All contracts for calendar years 2018 to 2024 have been completed. For calendar year 2025, there are three active contracts: one has been completed, one is ongoing, and one is currently suspended due to typhoons and heavy rainfall. | ||||||||||||||||||||
35 | 2 | Calapangan Small Reservoir Irrigation Project (CSRIP) | NIA | 05-08-23 | 12-31-26 | Economic Services | Locally Funded Project - | NIA | 1,060,000,000.00 | 1,060,000,000.00 | 1,055,558,000.00 | 1,000,234,015.92 | 471,901,229.06 | 99.58 | 44.71 | 52.37 | 54.57 | 2.20 | 232 | 16 | For CY 2026, the total program allocation amounts to PhP210,000,000.00, distributed as follows: Regional Office: PhP 122,034,207.68 Central Office: PhP 87,965,792.32 One (1) contract commenced, specifically the Construction of Access Road and Ancillary Structures Leading to the Dam Site and Project Facilities. The Construction of the Calapangan Small Reservoir Irrigation Project and its Appurtenant Structures is ongoing, with a total contract amount of PhP 738,453,619.84 and an original contract duration of 1,225 calendar days, of which PhP 87,965,792.32 is allocated under CY 2026. The Construction of Irrigation Facilities (Main Canal, Laterals A & B, Sublaterals A-1, A-2, and B-1), including the Supply, Delivery, and Installation of Steel Gates for Headgates, just started on June 24, 2026. However, its implementation is being funded from the CY 2025 program allocation; consequently, no funds were allocated under CY 2026 for the contract. | ||||||||||||||||||||
36 | 3 | Balasig Small Reservoir Irrigation Project (BSRIP) FY 2023- 50M FY 2024- 5M FY 2025- 0 | NIA | 05-03-23 | 12-31-26 | Economic Services | Locally Funded Project - | NIA | 50,000,000.00 | 55,000,000.00 | 55,000,000.00 | 55,000,000.00 | 54,673,244.56 | 100.00 | 99.41 | 98.81 | 100 | 1.19 | 31 | 1 | Early completion of the following output Indicators: - PCCP - 0.07km - Access Road Structures- 1 unit - Gabion Slope Protection - 56 metres | ||||||||||||||||||||
37 | 4 | Lusod Intergrated National Irrigation Project (LINIP) FY 2023- 50M FY 2024- 100M FY 2025- 200M FY 2026- 100M | NIA | 04-07-23 | 12-31-26 | Economic Services | Locally Funded Project - | NIA | 450,000,000.00 | 450,000,000.00 | 447,779,000.00 | 380,368,091.94 | 249,628,413.52 | 99.51 | 55.75 | 74.78 | 74.40 | -0.38 | 210 | 5 | Two (2) new contracts are currently ongoing Protection works- 735m Canal Structure- 3 units Project Facilities- 1 unit | ||||||||||||||||||||
38 | b. Infrastructure Development Programs/ Projects | ||||||||||||||||||||||||||||||||||||||||
39 | 1 | CEZA Port Development | |||||||||||||||||||||||||||||||||||||||
40 | a) Retroffing and Rehabilitation Works at Port Irene | CEZA | 09-01-20 | 09-30-26 | Economic | Corporate Fund | CEZA | 400,000,000.00 | 400,000,000.00 | 400,000,000.00 | 395,313,171.02 | 395,313,171.02 | 100.00 | 98.83 | 100.00 | 98.91 | -1.09 | - | - | ||||||||||||||||||||||
41 | b) Construction of Data Center / Upgrade of Telecomunication Facility | CEZA | 12-1-2024 | 10-30-26 | Economic | GAA | CEZA | 150,000,000.00 | 150,000,000.00 | 150,000,000.00 | 98,214,411.56 | 98,214,411.56 | 100.00 | 65.48 | 70.62 | 65.96 | -4.66 | 54 | 6 | ||||||||||||||||||||||
42 | c) Repair, Rehabilitation and Maintenance of the Breakwater at Cagayan Economic Zone - Phase I | CEZA | 6-1-2025 | 07-30-26 | Economic | GAA | CEZA | 156,492,000.00 | 156,492,000.00 | 156,492,000.00 | 156,338,780.95 | 156,338,780.95 | 100.00 | 99.90 | 96.36 | 100.00 | 3.64 | 17 | 1 | Phase 1 was completed on June 30, 2026 | |||||||||||||||||||||
43 | d) Dredging and Reclamation at Port Irene | ||||||||||||||||||||||||||||||||||||||||
44 | d.1) Dredging and Reclamation Project, Phase 2 | CEZA | 09-01-24 | 09-30-2026 | Economic | GAA | CEZA | 228,844,000.00 | 228,844,000.00 | 228,844,000.00 | 220,132,752.23 | 220,132,752.23 | 100.00 | 96.19 | 91.78 | 96.36 | 4.58 | 17 | 2 | Phase 1 was completed on March 31, 2024 | |||||||||||||||||||||
45 | d.2) Dredging and Reclamation at Port Irene (Phase III & IV) | CEZA | 9-1-2025 | 11-30-2026 | Economic | GAA | CEZA | 743,508,000.00 | 743,508,000.00 | 743,508,000.00 | 181,062,560.67 | 181,062,560.67 | 100.00 | 24.35 | 16.77 | 24.36 | 7.59 | 17 | 1 | ||||||||||||||||||||||
46 | 2 | Amulung Bridge and Approaches | DPWH | 03-12-24 | 06-13-25 | Economic Services | Locally Funded Project | DPWH RO2 | 140,904,816.34 | 151,000,000.00 | 151,000,000.00 | 140,904,816.34 | 21,135,722.45 | 100.00 | 14.00 | 100 | 90.84 | -9.16 | 33 | 5 | Completion of the remaining works is delayed, pending the approval of Variation Order No. 01. | ||||||||||||||||||||
47 | 3 | Bambang By-Pass Road, Nueva Vizcaya (FY 2025) | DPWH | 02-27-25 | 09-24-25 | Economic Services | Locally Funded Project | DPWH RO2 | 93,333,935.49 | 100,000,000.00 | 100,000,000.00 | 93,333,935.49 | 18,527,077.50 | 100.00 | 18.53 | 100.00 | 75.06 | -24.94 | 0 | - | The project has been suspended since January 2, 2026, due to RROW issues. | ||||||||||||||||||||
48 | 4 | Tuguegarao West Diversion Road (Jct. Carig-Linao-Atulayan-Bagay-Buntun) Package 1, Cagayan (FY 2024) | DPWH | 08-01-24 | 03-29-25 | Economic Services | Locally Funded Project | DPWH RO2 | 149,423,431.36 | 155,000,000.00 | 155,000,000.00 | 149,423,086.13 | 128,634,328.97 | 100.00 | 82.99 | 100.00 | 100.00 | 0.00 | 40 | 5 | Completed as of November 17, 2025. | ||||||||||||||||||||
49 | 5 | Tuguegarao-Enrile Bridge and Approaches Construction of Bypass and Diversion Roads Tuguegarao- Enrile Diversion Road (Including Tuguegarao-Enrile Bridge and Approaches), Phase 1 | DPWH RO2 | 09-20-2023 | 11-23-2024 | Economic Services | Locally Funded Project | DPWH R02 | 186,874,492.51 | 200,000,000.00 | 200,000,000.00 | 186,766,374.69 | 138,863,808.84 | 100.00 | 69.43 | 100.00 | 100.00 | 0.00 | no data | no data | Completed as of July 15, 2025 | ||||||||||||||||||||
50 | Phase 3 | DPWH RO2 | 04-11-2024 | 04-10-2025 | Economic Services | Locally Funded Project | DPWH R02 | 237,863,500.75 | 280,000,000.00 | 280,000,000.00 | 237,863,500.75 | 101,067,999.34 | 100.00 | 36.10 | 100.00 | 80.14 | -19.86 | 0.00 | 0.00 | The project is delayed due to site inaccessibility. Contract Time Extension No. 2, which corresponds to the approved Work Suspension Order No. 2, is currently being processed. If approved, the revised expiry date will be August 8, 2026. | |||||||||||||||||||||
51 | Flood Control Projects | ||||||||||||||||||||||||||||||||||||||||
52 | 6 | Abulug Flood Control Projects Construction of Canayun Flood Control Structure along Abulug-Apayao River, Barangay Canayun, Abulug, Cagayan | DPWH Cagayan 2nd DEO | 02-21-25 | 10-19-25 | General Public Services | Locally Funded Project - Flood Mitigation Facility | DPWH-CSDEO | 96,350,935.37 | 100,000,000.00 | 96,500,000.00 | 96,350,935.37 | 96,350,935.37 | 96.50 | 99.85 | 100 | 100.00 | 0.00 | no data | no data | Completed as of July 25, 2025. | ||||||||||||||||||||
53 | 7 | Construction of Dugo Flood Control along Abulug River, Package 2, Barangay Dugo, Abulug, Cagayan | DPWH Cagayan 2nd DEO | 03-07-25 | 11-2-25 | General Public Services | Locally Funded Project - Flood Mitigation Facility | DPWH-CSDEO | 96,349,581.49 | 100,000,000.00 | 96,500,000.00 | 96,349,581.49 | 86,716,921.64 | 96.50 | 89.86 | 100 | 100.00 | 0.00 | - | - | Completed as of June 1, 2026. | ||||||||||||||||||||
54 | 8 | Construction of Dugo Flood Control Structure along Abulug River, Barangay Dugo, Abulug, Cagayan | DPWH Cagayan 2nd DEO | 03-07-25 | 11-2-25 | General Public Services | Locally Funded Project - Flood Mitigation Facility | DPWH-CSDEO | 96,349,144.71 | 100,000,000.00 | 96,500,000.00 | 96,349,144.71 | 86,715,434.46 | 96.50 | 89.86 | 100 | 100.00 | 0.00 | - | - | Completed as of June 1, 2026. | ||||||||||||||||||||
55 | 9 | Construction of Libertad Flood Control along Abulug-Apayao River, Package 2, Barangay Libertad, Abulug, Cagayan | DPWH Cagayan 2nd DEO | 02-27-25 | 10-25-25 | General Public Services | Locally Funded Project - Flood Mitigation Facility | DPWH-CSDEO | 96,349,531.70 | 100,000,000.00 | 96,500,000.00 | 96,349,531.70 | 86,714,578.53 | 96.50 | 89.86 | 100 | 100.00 | 0.00 | no data | no data | Completed as of July 15, 2025. | ||||||||||||||||||||
56 | 10 | Construction of Libertad Flood Control Structure along Abulug-Apayao River, Package 1, Barangay Libertad, Abulug, Cagayan | DPWH Cagayan 2nd DEO | 02-21-25 | 10-19-25 | General Public Services | Locally Funded Project - Flood Mitigation Facility | DPWH-CSDEO | 96,349,818.22 | 100,000,000.00 | 96,500,000.00 | 96,349,818.22 | 96,349,818.22 | 96.50 | 99.84 | 100 | 100.00 | 0.00 | no data | no data | Completed as of July 15, 2025. | ||||||||||||||||||||
57 | 11 | Construction of Santo Tomas Flood Control along Abulug-Apayao River, Package 2, Barangay Sto. Tomas, Abulug, Cagayan | DPWH Cagayan 2nd DEO | 02-21-25 | 10-19-25 | General Public Services | Locally Funded Project - Flood Mitigation Facility | DPWH-CSDEO | 95,535,102.35 | 100,000,000.00 | 96,500,000.00 | 95,535,102.35 | 77,383,432.91 | 96.50 | 80.19 | 100 | 100.00 | 0.00 | no data | no data | Completed as of November 28, 2025. | ||||||||||||||||||||
58 | 12 | Construction of Bank Protection Structure along Guiddam River, Guiddam, Abulug,Cagayan | DPWH Cagayan 2nd DEO | 04-11-25 | 9-27-25 | General Public Services | Locally Funded Project - Flood Mitigation Facility | DPWH-CSDEO | 16,688,705.75 | 17,652,000.00 | 17,034,180.00 | 16,688,705.75 | 15,186,723.95 | 96.50 | 89.15 | 100 | 100.00 | 0.00 | no data | no data | Completed as of July 15, 2025. | ||||||||||||||||||||
59 | 13 | Construction of Canayun Flood Control along Abulug-Apayao River, Package 2, Barangay Canayun, Abulug, Cagayan | DPWH Cagayan 2nd DEO | 02-21-25 | 10-19-25 | General Public Services | Locally Funded Project - Flood Mitigation Facility | DPWH-CSDEO | 96,395,395.99 | 100,000,000.00 | 96,500,000.00 | 96,395,395.99 | 77,136,039.10 | 96.50 | 79.93 | 100 | 100.00 | 0.00 | - | - | Completed as of May 15, 2026. | ||||||||||||||||||||
60 | 14 | Construction of Abulug River Revetment 9 along Abulug River, Dugo, Abulug, Cagayan | DPWH Cagayan 2nd DEO | 06-11-25 | 2-6-26 | General Public Services | Locally Funded Project - Flood Mitigation Facility | DPWH-CSDEO | 96,299,249.05 | 100,000,000.00 | 96,500,000.00 | 96,299,249.05 | 86,669,324.15 | 96.50 | 89.81 | 100 | 100.00 | 0.00 | no data | no data | Completed as of January 31, 2026. | ||||||||||||||||||||
61 | 15 | Construction of Alannay Flood Control Structure along Zinundungan River, Lasam, Cagayan | DPWH Cagayan 2nd DEO | 03-07-25 | 9-16-25 | General Public Services | Locally Funded Project - Flood Mitigation Facility | DPWH-CSDEO | 48,935,000.01 | 50,000,000.00 | 49,000,000.00 | 48,935,000.01 | 21,657,949.42 | 98.00 | 44.20 | 100 | 100.00 | 0.00 | - | - | Completed as of May 15, 2026. | ||||||||||||||||||||
62 | 16 | Construction of Malinta Flood Control Structure along Zinundungan River, Barangay Malinta, Lasam, Cagayan | DPWH Cagayan 2nd DEO | 02-28-25 | 9-9-25 | General Public Services | Locally Funded Project - Flood Mitigation Facility | DPWH-CSDEO | 48,973,756.01 | 50,000,000.00 | 49,000,000.00 | 48,973,756.01 | 39,758,876.39 | 98.00 | 81.14 | 100 | 100.00 | 0.00 | no data | no data | Completed as of October 15, 2025. | ||||||||||||||||||||
63 | 17 | Construction of Flood Control Structure along Cagayan River, Package 2, Barangay Aggunetan, Lasam, Cagayan | DPWH Cagayan 2nd DEO | 02-21-25 | 10-19-25 | General Public Services | Locally Funded Project - Flood Mitigation Facility | DPWH-CSDEO | 96,264,699.87 | 100,000,000.00 | 96,500,000.00 | 96,264,699.87 | 86,638,229.88 | 96.50 | 89.78 | 100 | 100.00 | 0.00 | no data | no data | Completed as of March 31, 2026. | ||||||||||||||||||||
64 | 18 | Construction of Sanchez Mira Flood Control Structure along Sanchez Mira River, Package 1, Sanchez Mira, Cagayan | DPWH Cagayan 2nd DEO | 02-21-25 | 9-26-25 | General Public Services | Locally Funded Project - Flood Mitigation Facility | DPWH-CSDEO | 71,997,432.14 | 75,000,000.00 | 72,375,000.00 | 71,997,432.14 | 58,320,432.07 | 96.50 | 80.58 | 100 | 100.00 | 0.00 | no data | no data | Completed as of September 26, 2025. | ||||||||||||||||||||
65 | 19 | Construction of Sicatna River Control along Chico River, Package 1, Barangay Sicatna, Piat, Cagayan | DPWH Cagayan 2nd DEO | 02-21-25 | 9-28-25 | General Public Services | Locally Funded Project - Flood Mitigation Facility | DPWH-CSDEO | 72,274,996.96 | 75,000,000.00 | 72,375,000.00 | 72,274,996.96 | 59,551,588.43 | 96.50 | 82.28 | 100 | 100.00 | 0.00 | no data | no data | Completed as of March 31, 2026. | ||||||||||||||||||||
66 | 20 | Construction of Tuguegarao Circumferential Dike Road, Tuguegarao City, Cagayan - Package 4 (FY2024) | DPWH RO2 | 03-12-24 | 6-23-25 | Economic Services | LFP | DPWH RO2 | 183,025,826.31 | 200,000,000.00 | 200,000,000.00 | 183,025,826.31 | 173,876,124.46 | 100.00 | 86.94 | 100 | 100.00 | 0.00 | no data | no data | Completed as of September 02, 2025. | ||||||||||||||||||||
67 | Phase 3(FY 2025) | DPWH RO2 | 03-17-25 | 9-23-25 | Economic Services | LFP | DPWH RO2 | 77,098,486.61 | 80,000,000.00 | 80,000,000.00 | 77,098,486.61 | 11,564,772.99 | 100.00 | 14.46 | 100 | 48.13 | -51.87 | no data | no data | The project has been suspended since January 27, 2026, due to plan revisions. • Reason for plan revision: The realignment that occurred during the previous phase was not reflected in the 2025 Detailed Engineering Design (DED). Additionally, the site lacks a drainage outlet; therefore, a drainage pipe is proposed to provide an exit for the water. | |||||||||||||||||||||
68 | 21 | Health Facilities Enhancement Program (HFEP, FY 2022-2026) | |||||||||||||||||||||||||||||||||||||||
69 | a) HFEP 2022 | LGU/ CVCHD | 2022 | 2026 | Social services | Locally Funded Project | DOH-CVCHD | 5,000,000.00 | 5,000,000.00 | 5,000,000.00 | 5,000,000.00 | 3,476,751.73 | 100.00 | 69.54 | 80.00 | 80.00 | 0.00 | no data | no data | As of this reporting period, of the 59 projects under the HFEP 2022, 58 were already completed. One project (Completion of Sto Tomas Super Health Center) is currently at 80 percent completion rate. | |||||||||||||||||||||
70 | b) HFEP 2023 | LGU/ CVCHD | 2023 | 2026 | Social services | Locally Funded Project | DOH-CVCHD | 56,000,000.00 | 56,000,000.00 | 56,000,000.00 | 56,000,000.00 | 10,200,000.00 | 100.00 | 18.21 | 75.89 | 75.89 | 0.00 | no data | no data | As of this reporting period, of the 110 projects under the HFEP 2023, 107 were already completed. Two (Nagtipunan and Quirino Provincial Medical Center) are ongoing while funding for one project (Diura BHS) was reverted to the National Treasury. | |||||||||||||||||||||
71 | c) HFEP 2024 | LGU/ CVCHD | 2024 | 2026 | Social services | Locally Funded Project | DOH-CVCHD | 73,390,000.00 | 73,500,000.00 | 73,305,000.00 | 71,684,085.85 | 35,912,862.88 | 99.73 | 48.99 | 37.21 | 37.21 | 0.00 | no data | no data | As of this reporting period, of the 75 projects under the HFEP 2024, 28 were already completed, 47 are ongoing. Out of the 47 ongoing projects, three are substantially completed and awaiting final billing. | |||||||||||||||||||||
72 | c) HFEP 2025 | LGU/ CVCHD | 2025 | 2026 | Social services | Locally Funded Project | DOH-CVCHD | 11,238,044.41 | 15,000,000.00 | 14,700,000.00 | 11,238,020.14 | 1,343,198.70 | 98.00 | - | 96.22 | 93.12 | 3.10 | no data | no data | As of this reporting period, of the 4 projects under the HFEP 2025, 3 are ongoing and 1 project (Completion/Upgrading/Repair of Burgos Rural Health Unit) is already completed | |||||||||||||||||||||
73 | 22 | DOT-DPWH Convergence Program (2024-2025) | DPWH | 2-15-2023 | 12-05-2024 | Economic Services | Locally Funded Project | DPWH RO2 | 401,141,500.58 | 370,000,000.00 | 362,635,000.00 | 354,635,924.42 | 170,315,979.34 | 98.01 | 46.97 | 64.86 | 54.97 | - 9.89 | 69 | 1 | |||||||||||||||||||||
74 | 23 | Construction/ Improvement of Access Roads Leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT) | DPWH | 02-15-2023 | 02-06-2025 | Economic Services | Locally Funded Project | DPWH RO2 | 249,624,806.56 | 238,370,000.00 | 234,142,600.00 | 230,024,935.96 | 87,728,002.09 | 98.23 | 37.47 | 91.29 | 82.32 | -8.97 | 121 | 9 | |||||||||||||||||||||
75 | 24 | Alicia-Angadanan-San Guillermo-Cauayan City-Naguilian Alternate Route, San Guillermo Package 1, Isabela (P00801533LZ) | DPWH RO2 | 03-31-25 | 11-26-25 | Economic Services | LFP | DPWH RO2 | 115,523,684.02 | 122,900,000.00 | 122,900,000.00 | 115,523,684.02 | 46,229,704.82 | 100.00 | 37.62 | 100.00 | 80.69 | -19.31 | - | - | The project has been suspended since May 5, 2026, due to an obstruction at the project site. | ||||||||||||||||||||
76 | 25 | Aritao-Quirino Road - Package 1, Quirino Aglipay, Quirino (P00914998LZ-CW1) | DPWH RO2 | 03-17-25 | 9-20-25 | Economic Services | LFP | DPWH RO2 | 72,304,702.69 | 75,000,000.00 | 75,000,000.00 | 72,304,702.69 | 43,968,468.31 | 100.00 | 58.62 | 100.00 | 100.00 | 0.00 | - | - | Completed on November 29, 2025 | ||||||||||||||||||||
77 | 26 | Aritao-Quirino Road, Nueva Vizcaya (Phase II) | DPWH RO2 | 03-17-25 | 9-23-25 | Economic Services | Locally Funded Project | DPWH RO2 | 76,019,992.24 | 78,881,000.00 | 78,881,000.00 | 76,019,992.24 | 26,614,034.71 | 100.00 | 33.74 | 89.86 | 79.42 | -10.44 | - | - | The negative slippage is attributed to Proposed Variation Order No. 1 (Plan Revision). Reason for revision: Solid rock was noted in intermittent sections from Sta. 4+120.00 to Sta. 4+520.00. | ||||||||||||||||||||
78 | Cagayan Bridge Projects for Economic Development | ||||||||||||||||||||||||||||||||||||||||
79 | 27 | Tuguegarao - Solana Bridge and Approaches, Package 1, 2025 | DPWH | 04-10-25 | 03-05-26 06-19-26 | General Public Services | Locally Funded Project | DPWH RO2 | 141,706,353.54 | 150,000,000.00 | 150,000,000.00 | 141,706,353.54 | 21,255,953.03 | 100.00 | 14.17 | 100.00 | 50.90 | -49.10 | 0 | - | The project is delayed due to unfavorable weather conditions. Contract Time Extension No. 8 is currently being processed; if approved, the revised expiry date would be July 23, 2026 | ||||||||||||||||||||
80 | Package 2, FY 2025 | DPWH | 04-10-25 | 03-05-26 06-19-26 | General Public Services | Locally Funded Project | DPWH RO2 | 141,706,325.34 | 150,000,000.00 | 150,000,000.00 | 141,706,325.34 | 21,255,948.80 | 100.00 | 14.17 | 100.00 | 49.75 | -50.25 | 0 | - | The project is delayed due to unfavorable weather conditions. Contract Time Extension No. 8 is currently being processed; if approved, the revised expiry date would be July 23, 2026 | |||||||||||||||||||||
81 | Package 2, FY 2024 | DPWH | 04-11-24 | 04-10-25 03-25-26 | General Public Services | Locally Funded Project | DPWH RO2 | 269,862,556.29 | 280,000,000.00 | 280,000,000.00 | 269,862,556.29 | 143,760,067.04 | 100.00 | 51.34 | 100 | 100.00 | 0.00 | 0 | - | The project was completed on May 30, 2026. | |||||||||||||||||||||
82 | 28 | Pinacanauan Bridge 2 Package 2, FY 2023 | DPWH RO2 | 05-25-23 | 11-18-24 | Economic Services | Locally Funded Project | DPWH RO2 | 285,919,061.33 | 300,000,000.00 | 300,000,000.00 | 285,919,061.33 | 214,872,200.26 | 100.00 | 71.62 | 100 | 78.28 | -21.72 | The project is recommended for termination. Onsite works have been stopped.Termination documents have been processed and are awaiting formal approval. | ||||||||||||||||||||||
83 | Package 2, FY 2024 | DPWH RO2 | 04-11-2024 | 04-10-2025 | Economic Services | Locally Funded Project | DPWH RO2 | 264,489,713.09 | 280,000,000.00 | 280,000,000.00 | 264,489,713.09 | 70,205,648.58 | 100.00 | 25.07 | 100 | 63.54 | -36.46 | The project has been suspended since March 16, 2026, while awaiting the completion and construction of other prerequisite phases. | |||||||||||||||||||||||
84 | FY 2025 | DPWH RO2 | 04-10-2025 | 03-04-2026 | General Public Services | Locally Funded Project | DPWH RO2 | 139,598,578.83 | 150,000,000.00 | 150,000,000.00 | 139,598,578.83 | 20,939,786.82 | 100.00 | 13.96 | 81.61 | 57.83 | -23.78 | The project is delayed due to unfavorable weather conditions. Variation Order No. 1, due to a revision of plan, is being processed. | |||||||||||||||||||||||
85 | Package 2, FY 2025 | DPWH RO2 | 12-05-2025 | 04-24-2027 | Economic Services | Locally Funded Project - | DPWH RO3 | 264,010,208.54 | 300,000,000.00 | 300,000,000.00 | 264,010,208.54 | - | 100.00 | - | 34.65 | - | -34.65 | The project has been suspended since February 12, 2026, while awaiting the completion and construction of other prerequisite phases. | |||||||||||||||||||||||
86 | 29 | Alcala Bridge Construction of Bypass and Diversion Roads – Alcala- Santo Niño-Lasam Road, Package 1 (FY2023) | DPWH RO2 | 09-21-2023 | 05-27-2024 03-03-26 | Economic Services | Locally Funded Project | DPWH RO2 | 66,811,501.27 | 75,000,000.00 | 75,000,000.00 | 66,783,471.73 | 59,822,424.71 | 100.00 | 79.76 | 100.00 | 96.85 | -3.15 | no data | no data | |||||||||||||||||||||
87 | Package 2, FY 2023 | DPWH RO2 | 09-27-2023 | 10-03-2024 | Economic Services | Locally Funded Project | DPWH RO2 | 113,275,546.20 | 120,000,000.00 | 120,000,000.00 | 113,275,546.20 | 27,324,587.86 | 100.00 | 22.77 | 99.00 | 38.47 | -60.53 | no data | no data | The project is delayed due to unfavorable weather conditions. | |||||||||||||||||||||
88 | Package 1, FY 2024 | DPWH RO2 | 03-12-2024 | 11-19-2025 | Economic Services | Locally Funded Project | DPWH-RO2 | 192,891,064.09 | 200,000,000.00 | 200,000,000.00 | 192,896,059.00 | 45,228,359.73 | 100.00 | 22.61 | 100.00 | 39.72 | -60.28 | - | - | The project is delayed due to unfavorable weather conditions. Contract Time Extension No. 14 is being processed; if approved, the revised expiry date will be July 2, 2026. A Work Suspension Order was also issued due to a revision of the plan caused by an unforeseen obstruction (a wooden log) underneath Pier 3. | |||||||||||||||||||||
89 | Package 2, FY 2024 | DPWH RO2 | 02-14-2025 | 09-28-2025 | Economic Services | Locally Funded Project | DPWH RO2 | 28,850,109.37 | 30,000,000.00 | 30,000,000.00 | 28,850,109.37 | 4,327,516.41 | 100.00 | 14.43 | 100.00 | 4.88 | -95.12 | 0.00 | - | The project has been suspended since March 3, 2025, pending the completion of its prerequisite phases | |||||||||||||||||||||
90 | Construction of Bypass and Diversion Roads – Alcala- Santo Niño-Lasam Road, Package 1 (25B00041) | DPWH RO2 | 04-03-25 | 02-07-26 | Economic Services | Locally Funded Project | DPWH RO2 | 70,203,914.50 | 75,000,000.00 | 75,000,000.00 | 70,203,914.50 | 10,530,587.18 | 100.00 | 14.04 | 100.00 | 0.15 | -99.85 | - | - | The project has been suspended since April 18, 2025, pending the completion of other prerequisite phases. | |||||||||||||||||||||
91 | Daang Maharlika Improvement: Bridges | ||||||||||||||||||||||||||||||||||||||||
92 | 30 | Replacement of Permanent Weak Bridge - Minanga Br. (B01129LZ) along Maharlika Highway Tumauini, Isabela (FY2025) | DPWH RO2 | 03-07-25 | 06-27-26 | Economic Services | LFP | DPWH RO2 | 241,150,001.36 | 250,000,000.00 | 250,000,000.00 | 241,150,001.36 | 36,172,500.20 | 100.00 | 14.47 | 76.83 | 18.62 | -58.21 | - | - | The project is delayed due to the mechanical breakdown of the drilling equipment, which resulted in minimal accomplishment. | ||||||||||||||||||||
93 | 31 | Widening of Permanent Bridges - Malalam Br. (B01121LZ) Along Maharlika Highway Ilagan City, Isabela (FY2025) | DPWH RO2 | 03-17-25 | 05-10-26 | Economic Services | LFP | DPWH RO2 | 253,509,603.37 | 271,409,000.00 | 271,409,000.00 | 253,509,603.37 | 104,001,207.20 | 100.00 | 38.32 | 95.64 | 90.93 | -4.71 | - | - | |||||||||||||||||||||
94 | 32 | Widening of Permanent Bridges - Namuac Br. (B04427LZ) along Manila North Rd, Sanchez Mira, Cagayan | DPWH RO2 | 03-17-25 | 01-12-26 | Economic Services | LFP | DPWH-RO2 | 114,892,835.42 | 120,000,000.00 | 120,000,000.00 | 114,892,835.42 | 17,233,925.31 | 100.00 | 14.36 | 95.77 | 65.64 | -30.13 | - | - | The project is delayed due to unfavorable weather conditions. | ||||||||||||||||||||
95 | 33 | Widening of Permanent Bridges - Bangan Br.2 (B04426LZ) Along Manila North Rd located at Sanchez Mira, Cagayan | DPWH RO2 | 06-23-25 | 12-25-25 | Economic Services | LFP | DPWH-RO2 | 14,202,665.39 | 15,000,000.00 | 15,000,000.00 | 14,202,665.39 | 0.00 | 100.00 | 0.00 | 100.00 | 70.58 | -29.42 | no data | no data | The project has been suspended since April 1, 2026, due to plan revision. | ||||||||||||||||||||
96 | 34 | Widening of Permanent Bridges - Lucban br. (b04771lz) along Manila North Road | DPWH RO2 | 03-17-25 | 05-02-26 | General Public Services | LFP | DPWH-RO2 | 160,696,842.22 | 167,705,000.00 | 167,705,000.00 | 160,696,842.22 | 24,104,526.33 | 100.00 | 14.37 | 62.53 | 60.71 | -1.82 | - | - | The project is delayed due to unfavorable weather conditions. | ||||||||||||||||||||
97 | 35 | Replacement of Permanent Weak Bridges: Nagantatapian Bridge (B01094LZ) along Maharlika Highway (Cagayan Valley Rd) (Phase II) | DPWH RO2 | 03-07-25 | 09-15-25 | General Public Services | LFP | DPWH-RO2 | 14,370,965.98 | 15,000,000.00 | 15,000,000.00 | 14,370,965.98 | 2,156,245.49 | 100.00 | 14.37 | 100.00 | 88.80 | -11.20 | no data | no data | The project has been suspended since March 04, 2026, due to plan revision. | ||||||||||||||||||||
98 | 36 | Widening Of Permanent Bridges Caroronan Br. (B04773LZ) Along Manila North Rd. Aparri, Cagayan | DPWH RO2 | 06-23-25 | 01-24-26 | Economic Services | LFP | DPWH-R02 | 22,069,473.46 | 25,000,000.00 | 25,000,000.00 | 22,069,473.46 | 0.00 | 100.00 | 0.00 | 100.00 | 0.53 | -99.47 | no data | no data | The project has been suspended since July 16, 2025, due to obstructions (houses and a utility pole). | ||||||||||||||||||||
99 | 37 | Widening of Permanent Bridges - Pattung Br. (B04774LZ) along Manila North Rd Aparri, Cagayan | DPWH RO2 | 07-11-25 | 02-11-26 | Economic Services | LFP | DPWH-RO2 | 22,926,914.74 | 25,000,000.00 | 25,000,000.00 | 22,926,914.74 | 3,439,037.21 | 100.00 | 13.76 | 100.00 | 2.11 | -97.89 | no data | no data | The project has been suspended since August 27, 2025, due to obstructions (houses and utility posts). | ||||||||||||||||||||
100 | 38 | Construction of New Bridges - Claveria Viaduct along Maharlika North Rd | DPWH RO2 | 03-07-25 | 05-28-26 | Economic Services | LFP | DPWH-R02 | 282,757,606.91 | 300,000,000.00 | 300,000,000.00 | 282,757,606.91 | 0.00 | 100.00 | 0.00 | 100.00 | 64.59 | -35.41 | - | - | The project has been suspended since December 9, 2025, due to plan revision. | ||||||||||||||||||||
101 | 39 | Replacement of Permanent Weak Bridge Maluyo Br. 3 (B02009LZ) along Bangag - Magapit Road, Allacapan, Cagayan | DPWH RO2 | 03-17-25 | 10-28-25 | Economic Services | LFP | DPWH-RO2 | 45,856,603.98 | 48,000,000.00 | 48,000,000.00 | 45,856,603.98 | 22,920,213.94 | 100.00 | 47.75 | 100.00 | 72.00 | -28.00 | no data | no data | The project has been suspended since February 13, 2026, due to plan revisions. | ||||||||||||||||||||
102 | 40 | Rehabilitation/Major Repair of Permanent Bridges - Balasig Br. (B01134LZ) along Maharlika Highway | DPWH RO2 | 06-23-25 06-23-25 | 09-13-25 10-26-25 | Economic Services | LFP | DPWH-R02 | 5,615,721.00 | 6,000,000.00 | 6,000,000.00 | 5,615,721.00 | 0.00 | 100.00 | 0.00 | 100.00 | 100.00 | 0.00 | no data | no data | Completed as of February 19, 2026. | ||||||||||||||||||||
103 | 41 | Widening of Permanent Bridges, Guising Br. (B01092LZ) Along Maharlika Highway (Cagayan Valley Rd.) | DPWH RO2 | 07-10-25 | 05-09-26 | Economic Services | LFP | DPWH-R02 | 67,485,460.79 | 72,096,000.00 | 72,096,000.00 | 67,485,460.79 | 10,122,819.12 | 100.00 | 14.04 | 100.00 | 0.38 | -99.62 | - | - | The project has been suspended since July 29, 2025, due to obstructions (utility poles). | ||||||||||||||||||||
104 | Daang Maharlika Improvement: Roads | ||||||||||||||||||||||||||||||||||||||||
105 | 42 | Design and Build (DB) Construction of Missing Link/New Roads: Manila North Road (Jct. Bangag – Paruddun Section) – Jct. Cagayan Valley Road (Camalaniugan) Cagayan Province | DPWH RO2 | 05-10-20 | 02-24-26 | Economic Services | LFP | DPWH RO2 | 2,028,562,304.91 | 2,436,960,000.00 | 2,147,656,000.00 | 2,095,872,721.28 | 1,991,081,620.93 | 100.00 | 81.70 | 100.00 | 99.95 | -0.05 | no data | no data | |||||||||||||||||||||