This is a static pressure caused by the weight of water solely due to its height above the measurement point.
When water flows fast through a region, the pressure falls below the water vapors pressure causing bubbles to form on this hole openings inside the ballast pipeline. Which of the following is the correct name for the hole openings pointed by the red arrow in the image?
When water flows rapidly through a section as the water level drops, the pressure that causes bubbles to form in an image with a red arrow marked and these bubbles of phenomenon create is called?
What is the most common cause of recurring such vibrations that can damage the pump?
This condition is similar to the formation of small pits on a surface as a consequence of corrosion which is often caused by concavity in a surface (wear and tear).
This phenomenon typically occurs when a valve closes abruptly at the end of a pipeline system, and a pressure surge propagates into the line causing the valve or pump to rupture.
What should an individual's behavior be when opening or closing the valve?
How to prevent a water hammer if a ballast pipeline is in a vacuum condition?
Which of the following procedures is the correct sequence of the ballast water operation before STARTING a pump?
Choose from the following effects of air drawing on the ballast pump? (Select the answers that apply)
Among the following procedures, which are the appropriate steps to avoid water hammer? (Select the answers that apply)
2
102/01/2024 10:41:47Answer Key15 / 15100.00Water head pressureOrificeCavitationCavitationPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
whirlpools and eddies around the suction inlet, presence of pitting, noise and vibration, causing air to enter the pump
Close valves slowly to avoid pressure surge., Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve.
3
105/01/2024 08:29:48
CAPT/ MALAKI, MANOLO P.
6 / 1540Water head pressureValveSaturationCavitationCuttingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
whirlpools and eddies around the suction inlet, presence of pitting, noise and vibration
Close valves slowly to avoid pressure surge., Pay attention to the difference in pressure on both ends of the valve.
4
205/01/2024 08:30:01
CO TORREON, MERLITO G.
9 / 1560Water head pressureOrificeCavitationCavitationPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
causing air to enter the pump
Begin ballast operation with small capacity and at slow speed.
5
305/01/2024 08:31:59MASTER / Suralta, Dino P.4 / 1526.67Water head pressureCasingSaturationContractionPittingWater hammer
It is necessary to open a valve carefully, but without any limitation in the closure of the valve.
Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline
iii, i, ii & iv
presence of pitting, noise and vibration
Begin ballast operation with small capacity and at slow speed.
6
117/01/2024 08:28:34
OIC-NW/ BINAYUG, JOHN EDMAR B.
4 / 1526.67Water head pressureCasingOrificeCavitationPittingAir drawing
It is necessary to open a valve carefully, but without any limitation in the closure of the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
i, ii, iii & iv
causing air to enter the pump, presence of pitting, noise and vibration
Begin ballast operation with small capacity and at slow speed.
7
217/01/2024 08:29:43
3/O CORDER, RONALD JR. C.
6 / 1540Water head pressureCasingContractionOrificePittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
presence of pitting, noise and vibration, as the tank liquid level of the ballast water ascent, causing air to enter the pump, whirlpools and eddies around the suction inlet
Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge., Fill the ballast line with freshwater and confirm positive pressure.
8
317/01/2024 08:35:05Capt. / Castelo, Joie M.9 / 1560Water head pressureOrificeCavitationCavitationPittingWater hammer
It is necessary to open a valve carefully, but without any limitation in the closure of the valve.
Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline
i, ii, iii & iv
causing air to enter the pump, presence of pitting, noise and vibration, whirlpools and eddies around the suction inlet
Begin ballast operation with small capacity and at slow speed.
9
417/01/2024 08:37:41
GUTIERREZ, DAN MARTIN C.
8 / 1553.33Water head pressureContractionCavitationCavitationSoftnessWater hammer
Attention should be paid to opening or closing the valve.
Make it negative pressure by opening a delivery valve of an empty tank
ii, iv, i & iii
presence of pitting, noise and vibration, causing air to enter the pump, whirlpools and eddies around the suction inlet, as the tank liquid level of the ballast water ascent
Begin ballast operation with small capacity and at slow speed., Close valves slowly to avoid pressure surge., Pay attention to the difference in pressure on both ends of the valve.
10
517/01/2024 08:38:02
MASTER/ CARBONILLA, LEO JR. C.
5 / 1533.33Water head pressureValveCavitationContractionPittingWater hammer
Attention should be paid to opening or closing the valve.
Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline
i, ii, iii & iv
whirlpools and eddies around the suction inlet
Begin ballast operation with small capacity and at slow speed.
11
114/02/2024 08:01:52
3/0 GUMAPAL, JAMES ANGELO G.
5 / 1533.33Water hammerValveCavitationContractionPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it negative pressure by opening a delivery valve of an empty tank
iii, i, ii & iv
presence of pitting, noise and vibration, whirlpools and eddies around the suction inlet
Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve.
12
214/02/2024 08:03:10
CM / PATAL, ROMAN JR LONTOC
4 / 1526.67Water hammerCasingContractionCavitationPittingWater hammer
It is necessary to open a valve carefully, but without any limitation in the closure of the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
i, ii, iii & iv
presence of pitting, noise and vibration
Close valves slowly to avoid pressure surge.
13
314/02/2024 08:03:30CAPT./NOBLEZA, NILO A.8 / 1553.33Water head pressureOrificeCavitationContractionPittingHydraulic press
It is necessary to open a valve carefully, but without any limitation in the closure of the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
i, ii, iii & iv
whirlpools and eddies around the suction inlet, presence of pitting, noise and vibration, causing air to enter the pump
Begin ballast operation with small capacity and at slow speed., Close valves slowly to avoid pressure surge.
14
414/02/2024 08:03:52ZAMORA, EDGARDO L.4 / 1526.67Water head pressureCasingSaturationContractionPittingAir drawing
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
i, ii, iii & iv
causing air to enter the pump
Begin ballast operation with small capacity and at slow speed.
15
514/02/2024 08:05:30
C/O// ALISACA, RICHARD F.
6 / 1540Water head pressureContractionCavitationCavitationPittingWater hammer
It is necessary to open a valve carefully, but without any limitation in the closure of the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iv, ii, I & iii
causing air to enter the pump
Begin ballast operation with small capacity and at slow speed.
16
614/02/2024 08:05:37
OIC-NW CADAVONA, NOE JR C.
3 / 1520Water hammerOrificeContractionContractionPittingWater hammer
Taking into account the sudden opening and closing of the valve to compensate for the vessel's delay.
Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline
iv, ii, I & iii
as the tank liquid level of the ballast water ascent
Fill the ballast line with freshwater and confirm positive pressure.
17
714/02/2024 08:07:24
OIC DE GUIA , ALVIN JOHN DELA CRUZ
7 / 1546.67Water head pressureCasingSaturationContractionPittingAir drawing
Attention should be paid to opening or closing the valve.
Immediately open the correct valve to finish the operation instantly
iii, i, ii & iv
as the tank liquid level of the ballast water ascent, presence of pitting, noise and vibration, causing air to enter the pump
Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge.
18
122/02/2024 08:28:18
OIC-NW/ CABAN, JOMAR E.
9 / 1560Water hammerValveCavitationContractionPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
as the tank liquid level of the ballast water ascent, whirlpools and eddies around the suction inlet, causing air to enter the pump
Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge.
19
222/02/2024 08:28:362/O Zamora, Paul D2 / 1513.33Air drawingOrificeSaturationContractionPittingHydraulic press
Simultaneously fully opening and closing the valve so as not to be complicated.
Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline
ii, iv, i & iii
presence of pitting, noise and vibration
Close valves slowly to avoid pressure surge.
20
322/02/2024 08:32:00
OIC-NW / LUMBO, JONARD G.
8 / 1553.33Water head pressureOrificeCavitationOrificePittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
causing air to enter the pump, presence of pitting, noise and vibration
Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge.
21
106/03/2024 08:16:08AB/ Tanalgo, Vergel V.5 / 1533.33Water head pressureOrificeCavitationContractionSmoothnessWater hammer
It is necessary to open a valve carefully, but without any limitation in the closure of the valve.
Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline
iii, i, ii & iv
presence of pitting, noise and vibration, whirlpools and eddies around the suction inlet, causing air to enter the pump, as the tank liquid level of the ballast water ascent
Fill the ballast line with freshwater and confirm positive pressure., Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed., Close valves slowly to avoid pressure surge.
22
206/03/2024 08:19:18
OIC-NW ASENTISTA, ERLEF B.
3 / 1520
Pump head and discharge valve
OrificeSaturationSaturationPittingWater hammer
Simultaneously fully opening and closing the valve so as not to be complicated.
Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline
i, ii, iii & iv
as the tank liquid level of the ballast water ascent
Pay attention to the difference in pressure on both ends of the valve.
23
306/03/2024 08:19:29
ABAPO, CARLO SAMILLANO
5 / 1533.33Water hammerOrificeContractionCavitationPittingWater hammer
It is necessary to open a valve carefully, but without any limitation in the closure of the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
i, ii, iii & iv
presence of pitting, noise and vibration
Begin ballast operation with small capacity and at slow speed.
24
406/03/2024 08:20:28
VELASQUEZ JAN KEVIN O.
4 / 1526.67Water hammerCasingContractionCavitationPittingWater hammer
Attention should be paid to opening or closing the valve.
Immediately open the correct valve to finish the operation instantly
iv, ii, I & iii
causing air to enter the pump
Pay attention to the difference in pressure on both ends of the valve.
25
506/03/2024 08:20:57EDER, ELBERT, J.12 / 1580Water head pressureOrificeCavitationCavitationPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
whirlpools and eddies around the suction inlet, causing air to enter the pump, presence of pitting, noise and vibration
Pay attention to the difference in pressure on both ends of the valve.
26
606/03/2024 08:22:22
TO / ELISAN, JOVEN MARIE S.
9 / 1560Water head pressureCasingContractionCavitationPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
i, ii, iii & iv
whirlpools and eddies around the suction inlet, causing air to enter the pump, presence of pitting, noise and vibration
Begin ballast operation with small capacity and at slow speed., Fill the ballast line with freshwater and confirm positive pressure., Close valves slowly to avoid pressure surge., Pay attention to the difference in pressure on both ends of the valve.
27
706/03/2024 08:23:40
MASTER / ALEGATA / ROCKY Y.
9 / 1560Water head pressureOrificeCavitationCavitationPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
whirlpools and eddies around the suction inlet
Pay attention to the difference in pressure on both ends of the valve.
28
806/03/2024 08:23:56
T/O GUERRERO, KARL JOSEF O.
7 / 1546.67Air drawingOrificeCavitationCavitationSoftnessWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
presence of pitting, noise and vibration
Begin ballast operation with small capacity and at slow speed.
29
906/03/2024 08:25:41
MASTER / VALENCE, GRACIANO JR. O
3 / 1520Water hammerValveSaturationContractionPittingWater hammer
Attention should be paid to opening or closing the valve.
Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline
i, ii, iii & iv
presence of pitting, noise and vibration
Pay attention to the difference in pressure on both ends of the valve.
30
127/03/2024 08:25:40
OIC - NW/ BAUTISTA, RUCKEE BRYE O.
12 / 1580Water head pressureOrificeCavitationCavitationPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
causing air to enter the pump, presence of pitting, noise and vibration
Close valves slowly to avoid pressure surge., Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed.
31
227/03/2024 08:29:46
3OFF / DE LA CRUZ, SHERWIN G.
11 / 1573.33Water head pressureValveContractionCavitationSmoothnessWater hammer
It is necessary to open a valve carefully, but without any limitation in the closure of the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
whirlpools and eddies around the suction inlet, presence of pitting, noise and vibration, causing air to enter the pump
Begin ballast operation with small capacity and at slow speed., Close valves slowly to avoid pressure surge., Pay attention to the difference in pressure on both ends of the valve.
32
327/03/2024 08:34:23
MANGUBAT, ARCHIVAL O.
7 / 1546.67Water head pressureOrificeCavitationContractionPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
i, ii, iii & iv
presence of pitting, noise and vibration
Pay attention to the difference in pressure on both ends of the valve.
33
118/04/2024 08:07:22CO / DELATOR, JOEY J.6 / 1540Water head pressureOrificeOrificeCavitationPittingWater hammer
Attention should be paid to opening or closing the valve.
Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline
i, ii, iii & iv
whirlpools and eddies around the suction inlet, causing air to enter the pump, as the tank liquid level of the ballast water ascent, presence of pitting, noise and vibration
Close valves slowly to avoid pressure surge., Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed., Fill the ballast line with freshwater and confirm positive pressure.
34
218/04/2024 08:08:04
2M BULADACO, FREDERICK D.
7 / 1546.67
Pump head and discharge valve
OrificeSaturationContractionPittingWater hammer
Attention should be paid to opening or closing the valve.
Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline
ii, iv, i & iii
causing air to enter the pump, whirlpools and eddies around the suction inlet, as the tank liquid level of the ballast water ascent, presence of pitting, noise and vibration
Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge.
35
318/04/2024 08:08:41
CM/EUCOGCO,JURADON G.
6 / 1540Water head pressureContractionCavitationCavitationPittingWater hammer
Taking into account the sudden opening and closing of the valve to compensate for the vessel's delay.
Make it positive pressure by slowly opening a suction valve of an empty tank
i, ii, iii & iv
whirlpools and eddies around the suction inlet
Begin ballast operation with small capacity and at slow speed.
36
115/05/2024 08:10:24
MASTER / LIBAO, FRENZ ALLEN P.
15 / 15100Water head pressureOrificeCavitationCavitationPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
causing air to enter the pump, presence of pitting, noise and vibration, whirlpools and eddies around the suction inlet
Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge., Begin ballast operation with small capacity and at slow speed.
37
215/05/2024 08:10:41
AB / DE GUZMAN, JAN JERWIN M.
9 / 1560Water head pressureValveCavitationCavitationSmoothnessWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
ii, iv, i & iii
causing air to enter the pump, presence of pitting, noise and vibration
Close valves slowly to avoid pressure surge., Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed.
38
315/05/2024 08:12:40
CAPT / LAZAGA, JERRICK B.
5 / 1533.33Water head pressureOrificeSaturationContractionPittingWater hammer
Attention should be paid to opening or closing the valve.
Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline
i, ii, iii & iv
causing air to enter the pump
Begin ballast operation with small capacity and at slow speed.
39
415/05/2024 08:14:28
OIC / CARINO,ULYSSES HARO
4 / 1526.67
Pump head and discharge valve
ContractionContractionContractionCuttingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
causing air to enter the pump
Pay attention to the difference in pressure on both ends of the valve.
40
515/05/2024 08:14:37
3/O / Lignig, James Kenneth B.
10 / 1566.67Water head pressureOrificeCavitationOrificePittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iv, ii, I & iii
causing air to enter the pump, as the tank liquid level of the ballast water ascent, presence of pitting, noise and vibration
Begin ballast operation with small capacity and at slow speed., Close valves slowly to avoid pressure surge., Pay attention to the difference in pressure on both ends of the valve.
41
129/05/2024 08:01:46
OIC/ MALLORCA, JULIO JR. L.
5 / 1533.33Water head pressureContractionSaturationCavitationSmoothnessWater hammer
Attention should be paid to opening or closing the valve.
Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline
iii, i, ii & iv
whirlpools and eddies around the suction inlet
Begin ballast operation with small capacity and at slow speed.
42
229/05/2024 08:04:03
OIC-NW/ ALINGASA, JOHN MARK M.
6 / 1540Water head pressureOrificeSaturationContractionPittingImpeller churn
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
whirlpools and eddies around the suction inlet
Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed.
43
329/05/2024 08:14:44
cm / dador, christopher A.
7 / 1546.67Water head pressureCasingCavitationCavitationSmoothnessWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
whirlpools and eddies around the suction inlet
Begin ballast operation with small capacity and at slow speed.
44
119/06/2024 08:00:06
3/O / PIEZAS, RAUL DANIEL C.
1 / 156.67Water hammerValveContractionCavitationCuttingAir drawing
It is necessary to open a valve carefully, but without any limitation in the closure of the valve.
Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline
i, ii, iii & iv
as the tank liquid level of the ballast water ascent
Begin ballast operation with small capacity and at slow speed.
45
219/06/2024 08:00:34
OIC-NW SABATER, PAULO ANGELO A.
11 / 1573.33Water head pressureOrificeCavitationContractionPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
causing air to enter the pump, whirlpools and eddies around the suction inlet, presence of pitting, noise and vibration
Fill the ballast line with freshwater and confirm positive pressure., Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge., Begin ballast operation with small capacity and at slow speed.
46
319/06/2024 08:02:32
OIC-NW/BUTASLAC, ROBBIE KARL M.
7 / 1546.67Water head pressureOrificeCavitationContractionPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
ii, iv, i & iii
whirlpools and eddies around the suction inlet
Close valves slowly to avoid pressure surge.
47
419/06/2024 08:03:59
C/O/LEGARDE,BALTAZAR D.
12 / 1580Water hammerOrificeCavitationCavitationSoftnessWater hammer
Simultaneously fully opening and closing the valve so as not to be complicated.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
whirlpools and eddies around the suction inlet, causing air to enter the pump, presence of pitting, noise and vibration
Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed., Close valves slowly to avoid pressure surge.
48
519/06/2024 08:04:04
OIC/NW / TANUECOZ,RANIEL M.
10 / 1566.67Water head pressureOrificeCavitationSaturationPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iv, ii, I & iii
presence of pitting, noise and vibration
Close valves slowly to avoid pressure surge., Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve.
49
619/06/2024 08:04:08
3/O / VILLANUEVA, MARC N.
6 / 1540Water head pressureOrificeContractionCavitationPittingWater hammer
Attention should be paid to opening or closing the valve.
Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline
i, ii, iii & iv
causing air to enter the pump
Pay attention to the difference in pressure on both ends of the valve.
50
719/06/2024 08:04:17
OIC-NW PETERO, CARL ANGELO J.
4 / 1526.67Water head pressureContractionSaturationCavitationSoftnessWater hammer
Attention should be paid to opening or closing the valve.
Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline
ii, iv, i & iii
as the tank liquid level of the ballast water ascent, causing air to enter the pump
Fill the ballast line with freshwater and confirm positive pressure., Begin ballast operation with small capacity and at slow speed.
51
819/06/2024 08:04:34
OIC APULI JONEL VALENCIA
4 / 1526.67Water hammerOrificeCavitationContractionPittingHydraulic press
It is necessary to open a valve carefully, but without any limitation in the closure of the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
ii, iv, i & iii
whirlpools and eddies around the suction inlet
Begin ballast operation with small capacity and at slow speed.
52
919/06/2024 08:05:12CO SABADO VIRGILIO R.2 / 1513.33Water hammerCasingCavitationCavitationCuttingImpeller churn
Taking into account the sudden opening and closing of the valve to compensate for the vessel's delay.
Immediately open the correct valve to finish the operation instantly
ii, iv, i & iii
as the tank liquid level of the ballast water ascent
Begin ballast operation with small capacity and at slow speed.
53
110/07/2024 08:06:15
OIC-NW / VERMUG, JEFF A.
12 / 1580Water head pressureOrificeCavitationCavitationPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
causing air to enter the pump, whirlpools and eddies around the suction inlet
Close valves slowly to avoid pressure surge., Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve.
54
210/07/2024 08:08:02
JUNIOR OFFICER REYES, CARL ANDREW J.
9 / 1560Water head pressureValveCavitationCavitationSoftnessWater hammer
Attention should be paid to opening or closing the valve.
Make it negative pressure by opening a delivery valve of an empty tank
iii, i, ii & iv
whirlpools and eddies around the suction inlet, causing air to enter the pump, presence of pitting, noise and vibration
Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve., Fill the ballast line with freshwater and confirm positive pressure., Close valves slowly to avoid pressure surge.
55
310/07/2024 08:08:25T/O DE TORRES, LOUIE D.8 / 1553.33Water head pressureOrificeCavitationCavitationPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
i, ii, iii & iv
presence of pitting, noise and vibration, causing air to enter the pump
Fill the ballast line with freshwater and confirm positive pressure., Close valves slowly to avoid pressure surge., Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed.
56
410/07/2024 08:09:40
OIC-NW RAÑULA, JUNEL B.
3 / 1520Water head pressureOrificeOrificeOrificeSmoothnessHydraulic press
Taking into account the sudden opening and closing of the valve to compensate for the vessel's delay.
Immediately open the correct valve to finish the operation instantly
iii, i, ii & iv
presence of pitting, noise and vibration
Begin ballast operation with small capacity and at slow speed.
57
118/07/2024 08:15:17
MASTER / CUBITA, LEO GLENN A.
8 / 1553.33Water head pressureOrificeCavitationCavitationPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
i, ii, iii & iv
whirlpools and eddies around the suction inlet
Begin ballast operation with small capacity and at slow speed.
58
218/07/2024 08:18:05Jumilla, Roderick N.6 / 1540Water hammerOrificeCavitationCavitationSmoothnessWater hammer
Attention should be paid to opening or closing the valve.
Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline
iii, i, ii & iv
causing air to enter the pump, presence of pitting, noise and vibration
Begin ballast operation with small capacity and at slow speed.
59
318/07/2024 08:28:42
MASTER, FLAMINIA, EVERETTE P.
5 / 1533.33Water head pressureOrificeCavitationContractionPittingWater hammer
Taking into account the sudden opening and closing of the valve to compensate for the vessel's delay.
Make it negative pressure by opening a delivery valve of an empty tank
i, ii, iii & iv
as the tank liquid level of the ballast water ascent
Close valves slowly to avoid pressure surge.
60
102/08/2024 08:10:36
0IC-NW/KALLOS,CLARK MARVIN C.
4 / 1526.67Water hammerOrificeContractionCavitationSmoothnessAir drawing
It is necessary to open a valve carefully, but without any limitation in the closure of the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
whirlpools and eddies around the suction inlet
Begin ballast operation with small capacity and at slow speed.
61
202/08/2024 08:10:59
OIC/MONTEBON, MARK LINCOLN O.
7 / 1546.67Water head pressureValveCavitationCavitationPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iv, ii, I & iii
whirlpools and eddies around the suction inlet, causing air to enter the pump
Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed.
62
302/08/2024 08:12:353/O / BORDEYOS, RYAN T.8 / 1553.33Water head pressureOrificeCavitationContractionPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
causing air to enter the pump, whirlpools and eddies around the suction inlet
Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed.
63
402/08/2024 08:12:46
OIC APULI JONEL VALENCIA
9 / 1560Water head pressureOrificeCavitationCavitationPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
whirlpools and eddies around the suction inlet, as the tank liquid level of the ballast water ascent, presence of pitting, noise and vibration
Close valves slowly to avoid pressure surge., Begin ballast operation with small capacity and at slow speed.
64
502/08/2024 08:13:09
APP. OFF./ BARDIES, JASHEM A.
10 / 1566.67Water head pressureOrificeCavitationSaturationPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iv, ii, I & iii
whirlpools and eddies around the suction inlet, presence of pitting, noise and vibration, causing air to enter the pump
Close valves slowly to avoid pressure surge., Fill the ballast line with freshwater and confirm positive pressure., Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve.
65
602/08/2024 08:14:59
3/O CARREON, CRISOSTOMO C.
2 / 1513.33Water hammerCasingSaturationSaturationPittingAir drawing
It is necessary to open a valve carefully, but without any limitation in the closure of the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
ii, iv, i & iii
whirlpools and eddies around the suction inlet
Pay attention to the difference in pressure on both ends of the valve.
66
702/08/2024 08:15:13
MSTR / BALAJADIA, RUBIGEN B.
6 / 1540Water head pressureOrificeSaturationCavitationPittingAir drawing
Attention should be paid to opening or closing the valve.
Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline
iii, i, ii & iv
whirlpools and eddies around the suction inlet
Fill the ballast line with freshwater and confirm positive pressure.
67
105/08/2024 08:32:14
C/OFF PEOLLO, JOHN HOLDEN G.
7 / 1546.67Water head pressureOrificeCavitationCavitationPittingWater hammer
Attention should be paid to opening or closing the valve.
Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline
i, ii, iii & iv
presence of pitting, noise and vibration
Close valves slowly to avoid pressure surge.
68
116/08/2024 08:31:56
MASTER/MAGSIPOC, RUBEN III C.
3 / 1520Water hammerCasingCavitationSaturationPittingWater hammer
It is necessary to open a valve carefully, but without any limitation in the closure of the valve.
Immediately open the correct valve to finish the operation instantly
ii, iv, i & iii
causing air to enter the pump
Close valves slowly to avoid pressure surge.
69
216/08/2024 08:33:01Capt. Francisco, Dennis F.9 / 1560Water head pressureOrificeCavitationCavitationPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
presence of pitting, noise and vibration, whirlpools and eddies around the suction inlet
Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve.
70
316/08/2024 08:36:54
OIC GAVINO, MANUEL GERARD V.
12 / 1580Water head pressureValveCavitationContractionPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it negative pressure by opening a delivery valve of an empty tank
iii, i, ii & iv
causing air to enter the pump, presence of pitting, noise and vibration, whirlpools and eddies around the suction inlet
Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge.
71
416/08/2024 08:39:18
OIC-NW GEPULLANO,JOE DENNIS C.
3 / 1520Water head pressureCasingContractionContractionPittingHydraulic press
It is necessary to open a valve carefully, but without any limitation in the closure of the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
i, ii, iii & iv
presence of pitting, noise and vibration, whirlpools and eddies around the suction inlet, causing air to enter the pump, as the tank liquid level of the ballast water ascent
Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge.
72
129/08/2024 09:08:13
3/O FUERTES, PHILIP JOHN C.
10 / 1566.67Water head pressureOrificeCavitationContractionPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iv, ii, I & iii
presence of pitting, noise and vibration, causing air to enter the pump, as the tank liquid level of the ballast water ascent
Close valves slowly to avoid pressure surge., Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed.
73
229/08/2024 09:32:20
CAPT. RAMON B. REMALDORA JR.
9 / 1560Air drawingOrificeCavitationCavitationPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it negative pressure by opening a delivery valve of an empty tank
iv, ii, I & iii
presence of pitting, noise and vibration, as the tank liquid level of the ballast water ascent, causing air to enter the pump
Begin ballast operation with small capacity and at slow speed., Close valves slowly to avoid pressure surge., Pay attention to the difference in pressure on both ends of the valve.
74
113/09/2024 08:43:40
OIC-NW BELARMINO, RHYAN KLYDE B
5 / 1533.33Water hammerOrificeOrificeCavitationPittingAir drawing
Attention should be paid to opening or closing the valve.
Make it negative pressure by opening a delivery valve of an empty tank
iii, i, ii & iv
whirlpools and eddies around the suction inlet, presence of pitting, noise and vibration
Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge.
75
213/09/2024 08:44:29
OIC-NW Vergonia, Bryle Lawrence D.
4 / 1526.67Water head pressureCasingSaturationContractionSmoothnessWater hammer
Attention should be paid to opening or closing the valve.
Make it negative pressure by opening a delivery valve of an empty tank
iii, i, ii & iv
whirlpools and eddies around the suction inlet, presence of pitting, noise and vibration
Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve.
76
313/09/2024 08:44:36
3/O NIANGO, MARK ANGELO A.
5 / 1533.33Air drawingContractionContractionOrificePittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
presence of pitting, noise and vibration, as the tank liquid level of the ballast water ascent, whirlpools and eddies around the suction inlet, causing air to enter the pump
Begin ballast operation with small capacity and at slow speed., Fill the ballast line with freshwater and confirm positive pressure., Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge.
77
413/09/2024 08:46:08
C/OFF Manso, Jose Ben Glicerio B.
5 / 1533.33
Pump head and discharge valve
ContractionSaturationCavitationPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iv, ii, I & iii
presence of pitting, noise and vibration
Begin ballast operation with small capacity and at slow speed.
78
513/09/2024 08:46:13
OIC/ GALLANO PATRICK C
5 / 1533.33Water head pressureContractionSaturationContractionPittingWater hammer
Attention should be paid to opening or closing the valve.
Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline
iii, i, ii & iv
causing air to enter the pump
Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed.
79
613/09/2024 08:47:33
Chief Officer Garcines, Leodel B.
6 / 1540Water hammerOrificeSaturationContractionPittingHydraulic press
Attention should be paid to opening or closing the valve.
Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline
iv, ii, I & iii
presence of pitting, noise and vibration, causing air to enter the pump
Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge.
80
120/09/2024 08:37:38
OIC / RABAYA, NEIL JOHN B.
4 / 1526.67Water hammerContractionContractionContractionPittingHydraulic press
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
causing air to enter the pump
Begin ballast operation with small capacity and at slow speed.
81
220/09/2024 08:40:31
OIC / Tagailo, Brent Dariel E.
7 / 1546.67Water head pressureCasingSaturationContractionPittingWater hammer
It is necessary to open a valve carefully, but without any limitation in the closure of the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iv, ii, I & iii
presence of pitting, noise and vibration, whirlpools and eddies around the suction inlet
Begin ballast operation with small capacity and at slow speed., Close valves slowly to avoid pressure surge., Pay attention to the difference in pressure on both ends of the valve.
82
320/09/2024 08:45:51
3/O / Timog, Christopher D.
11 / 1573.33Water head pressureCasingContractionContractionPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
ii, iv, i & iii
presence of pitting, noise and vibration, whirlpools and eddies around the suction inlet, causing air to enter the pump
Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed., Close valves slowly to avoid pressure surge.
83
109/10/2024 08:13:07
OIC AMBA, JON VON STEPH A.
9 / 1560Water head pressureOrificeSaturationCavitationCuttingWater hammer
Attention should be paid to opening or closing the valve.
Make it negative pressure by opening a delivery valve of an empty tank
iii, i, ii & iv
presence of pitting, noise and vibration, whirlpools and eddies around the suction inlet
Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed., Close valves slowly to avoid pressure surge.
84
209/10/2024 08:14:26
OIC-NW ADAME, NIÑO JOSEPH L.
8 / 1553.33Water head pressureOrificeCavitationContractionPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
whirlpools and eddies around the suction inlet, presence of pitting, noise and vibration, as the tank liquid level of the ballast water ascent, causing air to enter the pump
Close valves slowly to avoid pressure surge., Fill the ballast line with freshwater and confirm positive pressure., Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve.
85
309/10/2024 08:16:02
MASTER/ FARILLON, RANDY N.
15 / 15100Water head pressureOrificeCavitationCavitationPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
causing air to enter the pump, presence of pitting, noise and vibration, whirlpools and eddies around the suction inlet
Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge., Begin ballast operation with small capacity and at slow speed.
86
409/10/2024 10:08:06
MASTER/ Baylas, Ronaldo B.
7 / 1546.67Water head pressureCasingCavitationCavitationPittingWater hammer
Attention should be paid to opening or closing the valve.
Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline
iii, i, ii & iv
whirlpools and eddies around the suction inlet
Close valves slowly to avoid pressure surge.
87
123/10/2024 08:19:41
OIC/NW/ Atibagos, Mark Louie D.
4 / 1526.67Water hammerOrificeSaturationContractionPittingHydraulic press
It is necessary to open a valve carefully, but without any limitation in the closure of the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
presence of pitting, noise and vibration
Close valves slowly to avoid pressure surge.
88
223/10/2024 08:26:23OIC TENA,ELJAN M.11 / 1573.33Water head pressureContractionCavitationContractionCuttingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iv, ii, I & iii
causing air to enter the pump, presence of pitting, noise and vibration, whirlpools and eddies around the suction inlet
Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge., Begin ballast operation with small capacity and at slow speed.
89
323/10/2024 08:27:27
GUTIERREZ, LINDON JAY P.
13 / 1586.67Air drawingOrificeCavitationContractionPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
whirlpools and eddies around the suction inlet, causing air to enter the pump, presence of pitting, noise and vibration
Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge.
90
423/10/2024 08:38:27LOPEZ, LOUIE D.5 / 1533.33Water hammerValveCavitationSaturationPittingWater hammer
Attention should be paid to opening or closing the valve.
Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline
iii, i, ii & iv
presence of pitting, noise and vibration
Pay attention to the difference in pressure on both ends of the valve.
91
108/11/2024 08:36:55
OIC-NW/ ALICAME, HOMER A.
4 / 1526.67
Pump head and discharge valve
ContractionContractionContractionPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
i, ii, iii & iv
presence of pitting, noise and vibration
Begin ballast operation with small capacity and at slow speed.
92
208/11/2024 08:38:45
OIC/JARANILLA, JOHN DALE L.
3 / 1520Water hammerContractionCavitationContractionCuttingAir drawing
Attention should be paid to opening or closing the valve.
Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline
iii, i, ii & iv
whirlpools and eddies around the suction inlet, as the tank liquid level of the ballast water ascent, causing air to enter the pump, presence of pitting, noise and vibration
Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed., Close valves slowly to avoid pressure surge., Fill the ballast line with freshwater and confirm positive pressure.
93
122/11/2024 08:11:402/Off Alonsabe, Melvin D.5 / 1533.33Water head pressureContractionCavitationContractionPittingWater hammer
Attention should be paid to opening or closing the valve.
Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline
i, ii, iii & iv
presence of pitting, noise and vibration, whirlpools and eddies around the suction inlet
Begin ballast operation with small capacity and at slow speed., Close valves slowly to avoid pressure surge., Pay attention to the difference in pressure on both ends of the valve., Fill the ballast line with freshwater and confirm positive pressure.
94
222/11/2024 08:11:42
AB / BAWIC, KEVIN JOHN C.
4 / 1526.67Water head pressureContractionOrificeCavitationSoftnessAir drawing
Attention should be paid to opening or closing the valve.
Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline
iii, i, ii & iv
as the tank liquid level of the ballast water ascent
Pay attention to the difference in pressure on both ends of the valve.
95
322/11/2024 08:12:41
OIC-NW / Gargoles, Kurtken A.
4 / 1526.67Water head pressureValveCavitationSaturationSmoothnessWater hammer
Taking into account the sudden opening and closing of the valve to compensate for the vessel's delay.
Make it positive pressure by slowly opening a suction valve of an empty tank
iv, ii, I & iii
as the tank liquid level of the ballast water ascent, causing air to enter the pump, whirlpools and eddies around the suction inlet, presence of pitting, noise and vibration
Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge., Begin ballast operation with small capacity and at slow speed., Fill the ballast line with freshwater and confirm positive pressure.
96
422/11/2024 08:14:39
LANZADERAS, ROMMEL L.
2 / 1513.33
Pump head and discharge valve
ValveCavitationOrificeSmoothnessWater hammer
It is necessary to open a valve carefully, but without any limitation in the closure of the valve.
Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline
iv, ii, I & iii
presence of pitting, noise and vibration
Fill the ballast line with freshwater and confirm positive pressure.
97
522/11/2024 08:17:05C/O / Gellang, Rhapy A.6 / 1540Water hammerContractionCavitationContractionPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
whirlpools and eddies around the suction inlet
Pay attention to the difference in pressure on both ends of the valve.
98
622/11/2024 08:18:42
3O/ ASILUM CHARLES LOUISE T.
5 / 1533.33Water head pressureContractionOrificeCavitationSmoothnessWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
ii, iv, i & iii
whirlpools and eddies around the suction inlet, as the tank liquid level of the ballast water ascent
Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed.
99
722/11/2024 08:18:55OIC/NW / Suico, Carlo G.10 / 1566.67Water head pressureOrificeOrificeOrificePittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
whirlpools and eddies around the suction inlet, causing air to enter the pump, presence of pitting, noise and vibration
Pay attention to the difference in pressure on both ends of the valve.
100
822/11/2024 08:20:06OIC-NW/Canaria, Jerald F.8 / 1553.33Water head pressureOrificeCavitationContractionPittingWater hammer
Attention should be paid to opening or closing the valve.
Make it positive pressure by slowly opening a suction valve of an empty tank
iii, i, ii & iv
causing air to enter the pump
Pay attention to the difference in pressure on both ends of the valve.