| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | No. | Timestamp | RANK / Surname, First Name M.I. | Score | Grade | This is a static pressure caused by the weight of water solely due to its height above the measurement point. | When water flows fast through a region, the pressure falls below the water vapors pressure causing bubbles to form on this hole openings inside the ballast pipeline. Which of the following is the correct name for the hole openings pointed by the red arrow in the image? | When water flows rapidly through a section as the water level drops, the pressure that causes bubbles to form in an image with a red arrow marked and these bubbles of phenomenon create is called? | What is the most common cause of recurring such vibrations that can damage the pump? | This condition is similar to the formation of small pits on a surface as a consequence of corrosion which is often caused by concavity in a surface (wear and tear). | This phenomenon typically occurs when a valve closes abruptly at the end of a pipeline system, and a pressure surge propagates into the line causing the valve or pump to rupture. | What should an individual's behavior be when opening or closing the valve? | How to prevent a water hammer if a ballast pipeline is in a vacuum condition? | Which of the following procedures is the correct sequence of the ballast water operation before STARTING a pump? | Choose from the following effects of air drawing on the ballast pump? (Select the answers that apply) | Among the following procedures, which are the appropriate steps to avoid water hammer? (Select the answers that apply) | ||||||
2 | 1 | 02/01/2024 10:41:47 | Answer Key | 15 / 15 | 100.00 | Water head pressure | Orifice | Cavitation | Cavitation | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | whirlpools and eddies around the suction inlet, presence of pitting, noise and vibration, causing air to enter the pump | Close valves slowly to avoid pressure surge., Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve. | ||||||
3 | 1 | 05/01/2024 08:29:48 | CAPT/ MALAKI, MANOLO P. | 6 / 15 | 40 | Water head pressure | Valve | Saturation | Cavitation | Cutting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | whirlpools and eddies around the suction inlet, presence of pitting, noise and vibration | Close valves slowly to avoid pressure surge., Pay attention to the difference in pressure on both ends of the valve. | ||||||
4 | 2 | 05/01/2024 08:30:01 | CO TORREON, MERLITO G. | 9 / 15 | 60 | Water head pressure | Orifice | Cavitation | Cavitation | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | causing air to enter the pump | Begin ballast operation with small capacity and at slow speed. | ||||||
5 | 3 | 05/01/2024 08:31:59 | MASTER / Suralta, Dino P. | 4 / 15 | 26.67 | Water head pressure | Casing | Saturation | Contraction | Pitting | Water hammer | It is necessary to open a valve carefully, but without any limitation in the closure of the valve. | Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline | iii, i, ii & iv | presence of pitting, noise and vibration | Begin ballast operation with small capacity and at slow speed. | ||||||
6 | 1 | 17/01/2024 08:28:34 | OIC-NW/ BINAYUG, JOHN EDMAR B. | 4 / 15 | 26.67 | Water head pressure | Casing | Orifice | Cavitation | Pitting | Air drawing | It is necessary to open a valve carefully, but without any limitation in the closure of the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | i, ii, iii & iv | causing air to enter the pump, presence of pitting, noise and vibration | Begin ballast operation with small capacity and at slow speed. | ||||||
7 | 2 | 17/01/2024 08:29:43 | 3/O CORDER, RONALD JR. C. | 6 / 15 | 40 | Water head pressure | Casing | Contraction | Orifice | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | presence of pitting, noise and vibration, as the tank liquid level of the ballast water ascent, causing air to enter the pump, whirlpools and eddies around the suction inlet | Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge., Fill the ballast line with freshwater and confirm positive pressure. | ||||||
8 | 3 | 17/01/2024 08:35:05 | Capt. / Castelo, Joie M. | 9 / 15 | 60 | Water head pressure | Orifice | Cavitation | Cavitation | Pitting | Water hammer | It is necessary to open a valve carefully, but without any limitation in the closure of the valve. | Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline | i, ii, iii & iv | causing air to enter the pump, presence of pitting, noise and vibration, whirlpools and eddies around the suction inlet | Begin ballast operation with small capacity and at slow speed. | ||||||
9 | 4 | 17/01/2024 08:37:41 | GUTIERREZ, DAN MARTIN C. | 8 / 15 | 53.33 | Water head pressure | Contraction | Cavitation | Cavitation | Softness | Water hammer | Attention should be paid to opening or closing the valve. | Make it negative pressure by opening a delivery valve of an empty tank | ii, iv, i & iii | presence of pitting, noise and vibration, causing air to enter the pump, whirlpools and eddies around the suction inlet, as the tank liquid level of the ballast water ascent | Begin ballast operation with small capacity and at slow speed., Close valves slowly to avoid pressure surge., Pay attention to the difference in pressure on both ends of the valve. | ||||||
10 | 5 | 17/01/2024 08:38:02 | MASTER/ CARBONILLA, LEO JR. C. | 5 / 15 | 33.33 | Water head pressure | Valve | Cavitation | Contraction | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline | i, ii, iii & iv | whirlpools and eddies around the suction inlet | Begin ballast operation with small capacity and at slow speed. | ||||||
11 | 1 | 14/02/2024 08:01:52 | 3/0 GUMAPAL, JAMES ANGELO G. | 5 / 15 | 33.33 | Water hammer | Valve | Cavitation | Contraction | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it negative pressure by opening a delivery valve of an empty tank | iii, i, ii & iv | presence of pitting, noise and vibration, whirlpools and eddies around the suction inlet | Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve. | ||||||
12 | 2 | 14/02/2024 08:03:10 | CM / PATAL, ROMAN JR LONTOC | 4 / 15 | 26.67 | Water hammer | Casing | Contraction | Cavitation | Pitting | Water hammer | It is necessary to open a valve carefully, but without any limitation in the closure of the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | i, ii, iii & iv | presence of pitting, noise and vibration | Close valves slowly to avoid pressure surge. | ||||||
13 | 3 | 14/02/2024 08:03:30 | CAPT./NOBLEZA, NILO A. | 8 / 15 | 53.33 | Water head pressure | Orifice | Cavitation | Contraction | Pitting | Hydraulic press | It is necessary to open a valve carefully, but without any limitation in the closure of the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | i, ii, iii & iv | whirlpools and eddies around the suction inlet, presence of pitting, noise and vibration, causing air to enter the pump | Begin ballast operation with small capacity and at slow speed., Close valves slowly to avoid pressure surge. | ||||||
14 | 4 | 14/02/2024 08:03:52 | ZAMORA, EDGARDO L. | 4 / 15 | 26.67 | Water head pressure | Casing | Saturation | Contraction | Pitting | Air drawing | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | i, ii, iii & iv | causing air to enter the pump | Begin ballast operation with small capacity and at slow speed. | ||||||
15 | 5 | 14/02/2024 08:05:30 | C/O// ALISACA, RICHARD F. | 6 / 15 | 40 | Water head pressure | Contraction | Cavitation | Cavitation | Pitting | Water hammer | It is necessary to open a valve carefully, but without any limitation in the closure of the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iv, ii, I & iii | causing air to enter the pump | Begin ballast operation with small capacity and at slow speed. | ||||||
16 | 6 | 14/02/2024 08:05:37 | OIC-NW CADAVONA, NOE JR C. | 3 / 15 | 20 | Water hammer | Orifice | Contraction | Contraction | Pitting | Water hammer | Taking into account the sudden opening and closing of the valve to compensate for the vessel's delay. | Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline | iv, ii, I & iii | as the tank liquid level of the ballast water ascent | Fill the ballast line with freshwater and confirm positive pressure. | ||||||
17 | 7 | 14/02/2024 08:07:24 | OIC DE GUIA , ALVIN JOHN DELA CRUZ | 7 / 15 | 46.67 | Water head pressure | Casing | Saturation | Contraction | Pitting | Air drawing | Attention should be paid to opening or closing the valve. | Immediately open the correct valve to finish the operation instantly | iii, i, ii & iv | as the tank liquid level of the ballast water ascent, presence of pitting, noise and vibration, causing air to enter the pump | Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge. | ||||||
18 | 1 | 22/02/2024 08:28:18 | OIC-NW/ CABAN, JOMAR E. | 9 / 15 | 60 | Water hammer | Valve | Cavitation | Contraction | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | as the tank liquid level of the ballast water ascent, whirlpools and eddies around the suction inlet, causing air to enter the pump | Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge. | ||||||
19 | 2 | 22/02/2024 08:28:36 | 2/O Zamora, Paul D | 2 / 15 | 13.33 | Air drawing | Orifice | Saturation | Contraction | Pitting | Hydraulic press | Simultaneously fully opening and closing the valve so as not to be complicated. | Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline | ii, iv, i & iii | presence of pitting, noise and vibration | Close valves slowly to avoid pressure surge. | ||||||
20 | 3 | 22/02/2024 08:32:00 | OIC-NW / LUMBO, JONARD G. | 8 / 15 | 53.33 | Water head pressure | Orifice | Cavitation | Orifice | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | causing air to enter the pump, presence of pitting, noise and vibration | Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge. | ||||||
21 | 1 | 06/03/2024 08:16:08 | AB/ Tanalgo, Vergel V. | 5 / 15 | 33.33 | Water head pressure | Orifice | Cavitation | Contraction | Smoothness | Water hammer | It is necessary to open a valve carefully, but without any limitation in the closure of the valve. | Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline | iii, i, ii & iv | presence of pitting, noise and vibration, whirlpools and eddies around the suction inlet, causing air to enter the pump, as the tank liquid level of the ballast water ascent | Fill the ballast line with freshwater and confirm positive pressure., Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed., Close valves slowly to avoid pressure surge. | ||||||
22 | 2 | 06/03/2024 08:19:18 | OIC-NW ASENTISTA, ERLEF B. | 3 / 15 | 20 | Pump head and discharge valve | Orifice | Saturation | Saturation | Pitting | Water hammer | Simultaneously fully opening and closing the valve so as not to be complicated. | Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline | i, ii, iii & iv | as the tank liquid level of the ballast water ascent | Pay attention to the difference in pressure on both ends of the valve. | ||||||
23 | 3 | 06/03/2024 08:19:29 | ABAPO, CARLO SAMILLANO | 5 / 15 | 33.33 | Water hammer | Orifice | Contraction | Cavitation | Pitting | Water hammer | It is necessary to open a valve carefully, but without any limitation in the closure of the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | i, ii, iii & iv | presence of pitting, noise and vibration | Begin ballast operation with small capacity and at slow speed. | ||||||
24 | 4 | 06/03/2024 08:20:28 | VELASQUEZ JAN KEVIN O. | 4 / 15 | 26.67 | Water hammer | Casing | Contraction | Cavitation | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Immediately open the correct valve to finish the operation instantly | iv, ii, I & iii | causing air to enter the pump | Pay attention to the difference in pressure on both ends of the valve. | ||||||
25 | 5 | 06/03/2024 08:20:57 | EDER, ELBERT, J. | 12 / 15 | 80 | Water head pressure | Orifice | Cavitation | Cavitation | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | whirlpools and eddies around the suction inlet, causing air to enter the pump, presence of pitting, noise and vibration | Pay attention to the difference in pressure on both ends of the valve. | ||||||
26 | 6 | 06/03/2024 08:22:22 | TO / ELISAN, JOVEN MARIE S. | 9 / 15 | 60 | Water head pressure | Casing | Contraction | Cavitation | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | i, ii, iii & iv | whirlpools and eddies around the suction inlet, causing air to enter the pump, presence of pitting, noise and vibration | Begin ballast operation with small capacity and at slow speed., Fill the ballast line with freshwater and confirm positive pressure., Close valves slowly to avoid pressure surge., Pay attention to the difference in pressure on both ends of the valve. | ||||||
27 | 7 | 06/03/2024 08:23:40 | MASTER / ALEGATA / ROCKY Y. | 9 / 15 | 60 | Water head pressure | Orifice | Cavitation | Cavitation | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | whirlpools and eddies around the suction inlet | Pay attention to the difference in pressure on both ends of the valve. | ||||||
28 | 8 | 06/03/2024 08:23:56 | T/O GUERRERO, KARL JOSEF O. | 7 / 15 | 46.67 | Air drawing | Orifice | Cavitation | Cavitation | Softness | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | presence of pitting, noise and vibration | Begin ballast operation with small capacity and at slow speed. | ||||||
29 | 9 | 06/03/2024 08:25:41 | MASTER / VALENCE, GRACIANO JR. O | 3 / 15 | 20 | Water hammer | Valve | Saturation | Contraction | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline | i, ii, iii & iv | presence of pitting, noise and vibration | Pay attention to the difference in pressure on both ends of the valve. | ||||||
30 | 1 | 27/03/2024 08:25:40 | OIC - NW/ BAUTISTA, RUCKEE BRYE O. | 12 / 15 | 80 | Water head pressure | Orifice | Cavitation | Cavitation | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | causing air to enter the pump, presence of pitting, noise and vibration | Close valves slowly to avoid pressure surge., Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed. | ||||||
31 | 2 | 27/03/2024 08:29:46 | 3OFF / DE LA CRUZ, SHERWIN G. | 11 / 15 | 73.33 | Water head pressure | Valve | Contraction | Cavitation | Smoothness | Water hammer | It is necessary to open a valve carefully, but without any limitation in the closure of the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | whirlpools and eddies around the suction inlet, presence of pitting, noise and vibration, causing air to enter the pump | Begin ballast operation with small capacity and at slow speed., Close valves slowly to avoid pressure surge., Pay attention to the difference in pressure on both ends of the valve. | ||||||
32 | 3 | 27/03/2024 08:34:23 | MANGUBAT, ARCHIVAL O. | 7 / 15 | 46.67 | Water head pressure | Orifice | Cavitation | Contraction | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | i, ii, iii & iv | presence of pitting, noise and vibration | Pay attention to the difference in pressure on both ends of the valve. | ||||||
33 | 1 | 18/04/2024 08:07:22 | CO / DELATOR, JOEY J. | 6 / 15 | 40 | Water head pressure | Orifice | Orifice | Cavitation | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline | i, ii, iii & iv | whirlpools and eddies around the suction inlet, causing air to enter the pump, as the tank liquid level of the ballast water ascent, presence of pitting, noise and vibration | Close valves slowly to avoid pressure surge., Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed., Fill the ballast line with freshwater and confirm positive pressure. | ||||||
34 | 2 | 18/04/2024 08:08:04 | 2M BULADACO, FREDERICK D. | 7 / 15 | 46.67 | Pump head and discharge valve | Orifice | Saturation | Contraction | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline | ii, iv, i & iii | causing air to enter the pump, whirlpools and eddies around the suction inlet, as the tank liquid level of the ballast water ascent, presence of pitting, noise and vibration | Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge. | ||||||
35 | 3 | 18/04/2024 08:08:41 | CM/EUCOGCO,JURADON G. | 6 / 15 | 40 | Water head pressure | Contraction | Cavitation | Cavitation | Pitting | Water hammer | Taking into account the sudden opening and closing of the valve to compensate for the vessel's delay. | Make it positive pressure by slowly opening a suction valve of an empty tank | i, ii, iii & iv | whirlpools and eddies around the suction inlet | Begin ballast operation with small capacity and at slow speed. | ||||||
36 | 1 | 15/05/2024 08:10:24 | MASTER / LIBAO, FRENZ ALLEN P. | 15 / 15 | 100 | Water head pressure | Orifice | Cavitation | Cavitation | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | causing air to enter the pump, presence of pitting, noise and vibration, whirlpools and eddies around the suction inlet | Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge., Begin ballast operation with small capacity and at slow speed. | ||||||
37 | 2 | 15/05/2024 08:10:41 | AB / DE GUZMAN, JAN JERWIN M. | 9 / 15 | 60 | Water head pressure | Valve | Cavitation | Cavitation | Smoothness | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | ii, iv, i & iii | causing air to enter the pump, presence of pitting, noise and vibration | Close valves slowly to avoid pressure surge., Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed. | ||||||
38 | 3 | 15/05/2024 08:12:40 | CAPT / LAZAGA, JERRICK B. | 5 / 15 | 33.33 | Water head pressure | Orifice | Saturation | Contraction | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline | i, ii, iii & iv | causing air to enter the pump | Begin ballast operation with small capacity and at slow speed. | ||||||
39 | 4 | 15/05/2024 08:14:28 | OIC / CARINO,ULYSSES HARO | 4 / 15 | 26.67 | Pump head and discharge valve | Contraction | Contraction | Contraction | Cutting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | causing air to enter the pump | Pay attention to the difference in pressure on both ends of the valve. | ||||||
40 | 5 | 15/05/2024 08:14:37 | 3/O / Lignig, James Kenneth B. | 10 / 15 | 66.67 | Water head pressure | Orifice | Cavitation | Orifice | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iv, ii, I & iii | causing air to enter the pump, as the tank liquid level of the ballast water ascent, presence of pitting, noise and vibration | Begin ballast operation with small capacity and at slow speed., Close valves slowly to avoid pressure surge., Pay attention to the difference in pressure on both ends of the valve. | ||||||
41 | 1 | 29/05/2024 08:01:46 | OIC/ MALLORCA, JULIO JR. L. | 5 / 15 | 33.33 | Water head pressure | Contraction | Saturation | Cavitation | Smoothness | Water hammer | Attention should be paid to opening or closing the valve. | Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline | iii, i, ii & iv | whirlpools and eddies around the suction inlet | Begin ballast operation with small capacity and at slow speed. | ||||||
42 | 2 | 29/05/2024 08:04:03 | OIC-NW/ ALINGASA, JOHN MARK M. | 6 / 15 | 40 | Water head pressure | Orifice | Saturation | Contraction | Pitting | Impeller churn | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | whirlpools and eddies around the suction inlet | Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed. | ||||||
43 | 3 | 29/05/2024 08:14:44 | cm / dador, christopher A. | 7 / 15 | 46.67 | Water head pressure | Casing | Cavitation | Cavitation | Smoothness | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | whirlpools and eddies around the suction inlet | Begin ballast operation with small capacity and at slow speed. | ||||||
44 | 1 | 19/06/2024 08:00:06 | 3/O / PIEZAS, RAUL DANIEL C. | 1 / 15 | 6.67 | Water hammer | Valve | Contraction | Cavitation | Cutting | Air drawing | It is necessary to open a valve carefully, but without any limitation in the closure of the valve. | Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline | i, ii, iii & iv | as the tank liquid level of the ballast water ascent | Begin ballast operation with small capacity and at slow speed. | ||||||
45 | 2 | 19/06/2024 08:00:34 | OIC-NW SABATER, PAULO ANGELO A. | 11 / 15 | 73.33 | Water head pressure | Orifice | Cavitation | Contraction | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | causing air to enter the pump, whirlpools and eddies around the suction inlet, presence of pitting, noise and vibration | Fill the ballast line with freshwater and confirm positive pressure., Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge., Begin ballast operation with small capacity and at slow speed. | ||||||
46 | 3 | 19/06/2024 08:02:32 | OIC-NW/BUTASLAC, ROBBIE KARL M. | 7 / 15 | 46.67 | Water head pressure | Orifice | Cavitation | Contraction | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | ii, iv, i & iii | whirlpools and eddies around the suction inlet | Close valves slowly to avoid pressure surge. | ||||||
47 | 4 | 19/06/2024 08:03:59 | C/O/LEGARDE,BALTAZAR D. | 12 / 15 | 80 | Water hammer | Orifice | Cavitation | Cavitation | Softness | Water hammer | Simultaneously fully opening and closing the valve so as not to be complicated. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | whirlpools and eddies around the suction inlet, causing air to enter the pump, presence of pitting, noise and vibration | Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed., Close valves slowly to avoid pressure surge. | ||||||
48 | 5 | 19/06/2024 08:04:04 | OIC/NW / TANUECOZ,RANIEL M. | 10 / 15 | 66.67 | Water head pressure | Orifice | Cavitation | Saturation | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iv, ii, I & iii | presence of pitting, noise and vibration | Close valves slowly to avoid pressure surge., Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve. | ||||||
49 | 6 | 19/06/2024 08:04:08 | 3/O / VILLANUEVA, MARC N. | 6 / 15 | 40 | Water head pressure | Orifice | Contraction | Cavitation | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline | i, ii, iii & iv | causing air to enter the pump | Pay attention to the difference in pressure on both ends of the valve. | ||||||
50 | 7 | 19/06/2024 08:04:17 | OIC-NW PETERO, CARL ANGELO J. | 4 / 15 | 26.67 | Water head pressure | Contraction | Saturation | Cavitation | Softness | Water hammer | Attention should be paid to opening or closing the valve. | Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline | ii, iv, i & iii | as the tank liquid level of the ballast water ascent, causing air to enter the pump | Fill the ballast line with freshwater and confirm positive pressure., Begin ballast operation with small capacity and at slow speed. | ||||||
51 | 8 | 19/06/2024 08:04:34 | OIC APULI JONEL VALENCIA | 4 / 15 | 26.67 | Water hammer | Orifice | Cavitation | Contraction | Pitting | Hydraulic press | It is necessary to open a valve carefully, but without any limitation in the closure of the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | ii, iv, i & iii | whirlpools and eddies around the suction inlet | Begin ballast operation with small capacity and at slow speed. | ||||||
52 | 9 | 19/06/2024 08:05:12 | CO SABADO VIRGILIO R. | 2 / 15 | 13.33 | Water hammer | Casing | Cavitation | Cavitation | Cutting | Impeller churn | Taking into account the sudden opening and closing of the valve to compensate for the vessel's delay. | Immediately open the correct valve to finish the operation instantly | ii, iv, i & iii | as the tank liquid level of the ballast water ascent | Begin ballast operation with small capacity and at slow speed. | ||||||
53 | 1 | 10/07/2024 08:06:15 | OIC-NW / VERMUG, JEFF A. | 12 / 15 | 80 | Water head pressure | Orifice | Cavitation | Cavitation | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | causing air to enter the pump, whirlpools and eddies around the suction inlet | Close valves slowly to avoid pressure surge., Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve. | ||||||
54 | 2 | 10/07/2024 08:08:02 | JUNIOR OFFICER REYES, CARL ANDREW J. | 9 / 15 | 60 | Water head pressure | Valve | Cavitation | Cavitation | Softness | Water hammer | Attention should be paid to opening or closing the valve. | Make it negative pressure by opening a delivery valve of an empty tank | iii, i, ii & iv | whirlpools and eddies around the suction inlet, causing air to enter the pump, presence of pitting, noise and vibration | Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve., Fill the ballast line with freshwater and confirm positive pressure., Close valves slowly to avoid pressure surge. | ||||||
55 | 3 | 10/07/2024 08:08:25 | T/O DE TORRES, LOUIE D. | 8 / 15 | 53.33 | Water head pressure | Orifice | Cavitation | Cavitation | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | i, ii, iii & iv | presence of pitting, noise and vibration, causing air to enter the pump | Fill the ballast line with freshwater and confirm positive pressure., Close valves slowly to avoid pressure surge., Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed. | ||||||
56 | 4 | 10/07/2024 08:09:40 | OIC-NW RAÑULA, JUNEL B. | 3 / 15 | 20 | Water head pressure | Orifice | Orifice | Orifice | Smoothness | Hydraulic press | Taking into account the sudden opening and closing of the valve to compensate for the vessel's delay. | Immediately open the correct valve to finish the operation instantly | iii, i, ii & iv | presence of pitting, noise and vibration | Begin ballast operation with small capacity and at slow speed. | ||||||
57 | 1 | 18/07/2024 08:15:17 | MASTER / CUBITA, LEO GLENN A. | 8 / 15 | 53.33 | Water head pressure | Orifice | Cavitation | Cavitation | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | i, ii, iii & iv | whirlpools and eddies around the suction inlet | Begin ballast operation with small capacity and at slow speed. | ||||||
58 | 2 | 18/07/2024 08:18:05 | Jumilla, Roderick N. | 6 / 15 | 40 | Water hammer | Orifice | Cavitation | Cavitation | Smoothness | Water hammer | Attention should be paid to opening or closing the valve. | Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline | iii, i, ii & iv | causing air to enter the pump, presence of pitting, noise and vibration | Begin ballast operation with small capacity and at slow speed. | ||||||
59 | 3 | 18/07/2024 08:28:42 | MASTER, FLAMINIA, EVERETTE P. | 5 / 15 | 33.33 | Water head pressure | Orifice | Cavitation | Contraction | Pitting | Water hammer | Taking into account the sudden opening and closing of the valve to compensate for the vessel's delay. | Make it negative pressure by opening a delivery valve of an empty tank | i, ii, iii & iv | as the tank liquid level of the ballast water ascent | Close valves slowly to avoid pressure surge. | ||||||
60 | 1 | 02/08/2024 08:10:36 | 0IC-NW/KALLOS,CLARK MARVIN C. | 4 / 15 | 26.67 | Water hammer | Orifice | Contraction | Cavitation | Smoothness | Air drawing | It is necessary to open a valve carefully, but without any limitation in the closure of the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | whirlpools and eddies around the suction inlet | Begin ballast operation with small capacity and at slow speed. | ||||||
61 | 2 | 02/08/2024 08:10:59 | OIC/MONTEBON, MARK LINCOLN O. | 7 / 15 | 46.67 | Water head pressure | Valve | Cavitation | Cavitation | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iv, ii, I & iii | whirlpools and eddies around the suction inlet, causing air to enter the pump | Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed. | ||||||
62 | 3 | 02/08/2024 08:12:35 | 3/O / BORDEYOS, RYAN T. | 8 / 15 | 53.33 | Water head pressure | Orifice | Cavitation | Contraction | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | causing air to enter the pump, whirlpools and eddies around the suction inlet | Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed. | ||||||
63 | 4 | 02/08/2024 08:12:46 | OIC APULI JONEL VALENCIA | 9 / 15 | 60 | Water head pressure | Orifice | Cavitation | Cavitation | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | whirlpools and eddies around the suction inlet, as the tank liquid level of the ballast water ascent, presence of pitting, noise and vibration | Close valves slowly to avoid pressure surge., Begin ballast operation with small capacity and at slow speed. | ||||||
64 | 5 | 02/08/2024 08:13:09 | APP. OFF./ BARDIES, JASHEM A. | 10 / 15 | 66.67 | Water head pressure | Orifice | Cavitation | Saturation | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iv, ii, I & iii | whirlpools and eddies around the suction inlet, presence of pitting, noise and vibration, causing air to enter the pump | Close valves slowly to avoid pressure surge., Fill the ballast line with freshwater and confirm positive pressure., Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve. | ||||||
65 | 6 | 02/08/2024 08:14:59 | 3/O CARREON, CRISOSTOMO C. | 2 / 15 | 13.33 | Water hammer | Casing | Saturation | Saturation | Pitting | Air drawing | It is necessary to open a valve carefully, but without any limitation in the closure of the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | ii, iv, i & iii | whirlpools and eddies around the suction inlet | Pay attention to the difference in pressure on both ends of the valve. | ||||||
66 | 7 | 02/08/2024 08:15:13 | MSTR / BALAJADIA, RUBIGEN B. | 6 / 15 | 40 | Water head pressure | Orifice | Saturation | Cavitation | Pitting | Air drawing | Attention should be paid to opening or closing the valve. | Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline | iii, i, ii & iv | whirlpools and eddies around the suction inlet | Fill the ballast line with freshwater and confirm positive pressure. | ||||||
67 | 1 | 05/08/2024 08:32:14 | C/OFF PEOLLO, JOHN HOLDEN G. | 7 / 15 | 46.67 | Water head pressure | Orifice | Cavitation | Cavitation | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline | i, ii, iii & iv | presence of pitting, noise and vibration | Close valves slowly to avoid pressure surge. | ||||||
68 | 1 | 16/08/2024 08:31:56 | MASTER/MAGSIPOC, RUBEN III C. | 3 / 15 | 20 | Water hammer | Casing | Cavitation | Saturation | Pitting | Water hammer | It is necessary to open a valve carefully, but without any limitation in the closure of the valve. | Immediately open the correct valve to finish the operation instantly | ii, iv, i & iii | causing air to enter the pump | Close valves slowly to avoid pressure surge. | ||||||
69 | 2 | 16/08/2024 08:33:01 | Capt. Francisco, Dennis F. | 9 / 15 | 60 | Water head pressure | Orifice | Cavitation | Cavitation | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | presence of pitting, noise and vibration, whirlpools and eddies around the suction inlet | Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve. | ||||||
70 | 3 | 16/08/2024 08:36:54 | OIC GAVINO, MANUEL GERARD V. | 12 / 15 | 80 | Water head pressure | Valve | Cavitation | Contraction | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it negative pressure by opening a delivery valve of an empty tank | iii, i, ii & iv | causing air to enter the pump, presence of pitting, noise and vibration, whirlpools and eddies around the suction inlet | Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge. | ||||||
71 | 4 | 16/08/2024 08:39:18 | OIC-NW GEPULLANO,JOE DENNIS C. | 3 / 15 | 20 | Water head pressure | Casing | Contraction | Contraction | Pitting | Hydraulic press | It is necessary to open a valve carefully, but without any limitation in the closure of the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | i, ii, iii & iv | presence of pitting, noise and vibration, whirlpools and eddies around the suction inlet, causing air to enter the pump, as the tank liquid level of the ballast water ascent | Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge. | ||||||
72 | 1 | 29/08/2024 09:08:13 | 3/O FUERTES, PHILIP JOHN C. | 10 / 15 | 66.67 | Water head pressure | Orifice | Cavitation | Contraction | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iv, ii, I & iii | presence of pitting, noise and vibration, causing air to enter the pump, as the tank liquid level of the ballast water ascent | Close valves slowly to avoid pressure surge., Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed. | ||||||
73 | 2 | 29/08/2024 09:32:20 | CAPT. RAMON B. REMALDORA JR. | 9 / 15 | 60 | Air drawing | Orifice | Cavitation | Cavitation | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it negative pressure by opening a delivery valve of an empty tank | iv, ii, I & iii | presence of pitting, noise and vibration, as the tank liquid level of the ballast water ascent, causing air to enter the pump | Begin ballast operation with small capacity and at slow speed., Close valves slowly to avoid pressure surge., Pay attention to the difference in pressure on both ends of the valve. | ||||||
74 | 1 | 13/09/2024 08:43:40 | OIC-NW BELARMINO, RHYAN KLYDE B | 5 / 15 | 33.33 | Water hammer | Orifice | Orifice | Cavitation | Pitting | Air drawing | Attention should be paid to opening or closing the valve. | Make it negative pressure by opening a delivery valve of an empty tank | iii, i, ii & iv | whirlpools and eddies around the suction inlet, presence of pitting, noise and vibration | Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge. | ||||||
75 | 2 | 13/09/2024 08:44:29 | OIC-NW Vergonia, Bryle Lawrence D. | 4 / 15 | 26.67 | Water head pressure | Casing | Saturation | Contraction | Smoothness | Water hammer | Attention should be paid to opening or closing the valve. | Make it negative pressure by opening a delivery valve of an empty tank | iii, i, ii & iv | whirlpools and eddies around the suction inlet, presence of pitting, noise and vibration | Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve. | ||||||
76 | 3 | 13/09/2024 08:44:36 | 3/O NIANGO, MARK ANGELO A. | 5 / 15 | 33.33 | Air drawing | Contraction | Contraction | Orifice | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | presence of pitting, noise and vibration, as the tank liquid level of the ballast water ascent, whirlpools and eddies around the suction inlet, causing air to enter the pump | Begin ballast operation with small capacity and at slow speed., Fill the ballast line with freshwater and confirm positive pressure., Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge. | ||||||
77 | 4 | 13/09/2024 08:46:08 | C/OFF Manso, Jose Ben Glicerio B. | 5 / 15 | 33.33 | Pump head and discharge valve | Contraction | Saturation | Cavitation | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iv, ii, I & iii | presence of pitting, noise and vibration | Begin ballast operation with small capacity and at slow speed. | ||||||
78 | 5 | 13/09/2024 08:46:13 | OIC/ GALLANO PATRICK C | 5 / 15 | 33.33 | Water head pressure | Contraction | Saturation | Contraction | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline | iii, i, ii & iv | causing air to enter the pump | Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed. | ||||||
79 | 6 | 13/09/2024 08:47:33 | Chief Officer Garcines, Leodel B. | 6 / 15 | 40 | Water hammer | Orifice | Saturation | Contraction | Pitting | Hydraulic press | Attention should be paid to opening or closing the valve. | Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline | iv, ii, I & iii | presence of pitting, noise and vibration, causing air to enter the pump | Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge. | ||||||
80 | 1 | 20/09/2024 08:37:38 | OIC / RABAYA, NEIL JOHN B. | 4 / 15 | 26.67 | Water hammer | Contraction | Contraction | Contraction | Pitting | Hydraulic press | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | causing air to enter the pump | Begin ballast operation with small capacity and at slow speed. | ||||||
81 | 2 | 20/09/2024 08:40:31 | OIC / Tagailo, Brent Dariel E. | 7 / 15 | 46.67 | Water head pressure | Casing | Saturation | Contraction | Pitting | Water hammer | It is necessary to open a valve carefully, but without any limitation in the closure of the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iv, ii, I & iii | presence of pitting, noise and vibration, whirlpools and eddies around the suction inlet | Begin ballast operation with small capacity and at slow speed., Close valves slowly to avoid pressure surge., Pay attention to the difference in pressure on both ends of the valve. | ||||||
82 | 3 | 20/09/2024 08:45:51 | 3/O / Timog, Christopher D. | 11 / 15 | 73.33 | Water head pressure | Casing | Contraction | Contraction | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | ii, iv, i & iii | presence of pitting, noise and vibration, whirlpools and eddies around the suction inlet, causing air to enter the pump | Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed., Close valves slowly to avoid pressure surge. | ||||||
83 | 1 | 09/10/2024 08:13:07 | OIC AMBA, JON VON STEPH A. | 9 / 15 | 60 | Water head pressure | Orifice | Saturation | Cavitation | Cutting | Water hammer | Attention should be paid to opening or closing the valve. | Make it negative pressure by opening a delivery valve of an empty tank | iii, i, ii & iv | presence of pitting, noise and vibration, whirlpools and eddies around the suction inlet | Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed., Close valves slowly to avoid pressure surge. | ||||||
84 | 2 | 09/10/2024 08:14:26 | OIC-NW ADAME, NIÑO JOSEPH L. | 8 / 15 | 53.33 | Water head pressure | Orifice | Cavitation | Contraction | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | whirlpools and eddies around the suction inlet, presence of pitting, noise and vibration, as the tank liquid level of the ballast water ascent, causing air to enter the pump | Close valves slowly to avoid pressure surge., Fill the ballast line with freshwater and confirm positive pressure., Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve. | ||||||
85 | 3 | 09/10/2024 08:16:02 | MASTER/ FARILLON, RANDY N. | 15 / 15 | 100 | Water head pressure | Orifice | Cavitation | Cavitation | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | causing air to enter the pump, presence of pitting, noise and vibration, whirlpools and eddies around the suction inlet | Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge., Begin ballast operation with small capacity and at slow speed. | ||||||
86 | 4 | 09/10/2024 10:08:06 | MASTER/ Baylas, Ronaldo B. | 7 / 15 | 46.67 | Water head pressure | Casing | Cavitation | Cavitation | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline | iii, i, ii & iv | whirlpools and eddies around the suction inlet | Close valves slowly to avoid pressure surge. | ||||||
87 | 1 | 23/10/2024 08:19:41 | OIC/NW/ Atibagos, Mark Louie D. | 4 / 15 | 26.67 | Water hammer | Orifice | Saturation | Contraction | Pitting | Hydraulic press | It is necessary to open a valve carefully, but without any limitation in the closure of the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | presence of pitting, noise and vibration | Close valves slowly to avoid pressure surge. | ||||||
88 | 2 | 23/10/2024 08:26:23 | OIC TENA,ELJAN M. | 11 / 15 | 73.33 | Water head pressure | Contraction | Cavitation | Contraction | Cutting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iv, ii, I & iii | causing air to enter the pump, presence of pitting, noise and vibration, whirlpools and eddies around the suction inlet | Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge., Begin ballast operation with small capacity and at slow speed. | ||||||
89 | 3 | 23/10/2024 08:27:27 | GUTIERREZ, LINDON JAY P. | 13 / 15 | 86.67 | Air drawing | Orifice | Cavitation | Contraction | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | whirlpools and eddies around the suction inlet, causing air to enter the pump, presence of pitting, noise and vibration | Begin ballast operation with small capacity and at slow speed., Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge. | ||||||
90 | 4 | 23/10/2024 08:38:27 | LOPEZ, LOUIE D. | 5 / 15 | 33.33 | Water hammer | Valve | Cavitation | Saturation | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline | iii, i, ii & iv | presence of pitting, noise and vibration | Pay attention to the difference in pressure on both ends of the valve. | ||||||
91 | 1 | 08/11/2024 08:36:55 | OIC-NW/ ALICAME, HOMER A. | 4 / 15 | 26.67 | Pump head and discharge valve | Contraction | Contraction | Contraction | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | i, ii, iii & iv | presence of pitting, noise and vibration | Begin ballast operation with small capacity and at slow speed. | ||||||
92 | 2 | 08/11/2024 08:38:45 | OIC/JARANILLA, JOHN DALE L. | 3 / 15 | 20 | Water hammer | Contraction | Cavitation | Contraction | Cutting | Air drawing | Attention should be paid to opening or closing the valve. | Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline | iii, i, ii & iv | whirlpools and eddies around the suction inlet, as the tank liquid level of the ballast water ascent, causing air to enter the pump, presence of pitting, noise and vibration | Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed., Close valves slowly to avoid pressure surge., Fill the ballast line with freshwater and confirm positive pressure. | ||||||
93 | 1 | 22/11/2024 08:11:40 | 2/Off Alonsabe, Melvin D. | 5 / 15 | 33.33 | Water head pressure | Contraction | Cavitation | Contraction | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline | i, ii, iii & iv | presence of pitting, noise and vibration, whirlpools and eddies around the suction inlet | Begin ballast operation with small capacity and at slow speed., Close valves slowly to avoid pressure surge., Pay attention to the difference in pressure on both ends of the valve., Fill the ballast line with freshwater and confirm positive pressure. | ||||||
94 | 2 | 22/11/2024 08:11:42 | AB / BAWIC, KEVIN JOHN C. | 4 / 15 | 26.67 | Water head pressure | Contraction | Orifice | Cavitation | Softness | Air drawing | Attention should be paid to opening or closing the valve. | Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline | iii, i, ii & iv | as the tank liquid level of the ballast water ascent | Pay attention to the difference in pressure on both ends of the valve. | ||||||
95 | 3 | 22/11/2024 08:12:41 | OIC-NW / Gargoles, Kurtken A. | 4 / 15 | 26.67 | Water head pressure | Valve | Cavitation | Saturation | Smoothness | Water hammer | Taking into account the sudden opening and closing of the valve to compensate for the vessel's delay. | Make it positive pressure by slowly opening a suction valve of an empty tank | iv, ii, I & iii | as the tank liquid level of the ballast water ascent, causing air to enter the pump, whirlpools and eddies around the suction inlet, presence of pitting, noise and vibration | Pay attention to the difference in pressure on both ends of the valve., Close valves slowly to avoid pressure surge., Begin ballast operation with small capacity and at slow speed., Fill the ballast line with freshwater and confirm positive pressure. | ||||||
96 | 4 | 22/11/2024 08:14:39 | LANZADERAS, ROMMEL L. | 2 / 15 | 13.33 | Pump head and discharge valve | Valve | Cavitation | Orifice | Smoothness | Water hammer | It is necessary to open a valve carefully, but without any limitation in the closure of the valve. | Carefully choose a full ballast tank to eliminate the vacuum by filling the pipeline | iv, ii, I & iii | presence of pitting, noise and vibration | Fill the ballast line with freshwater and confirm positive pressure. | ||||||
97 | 5 | 22/11/2024 08:17:05 | C/O / Gellang, Rhapy A. | 6 / 15 | 40 | Water hammer | Contraction | Cavitation | Contraction | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | whirlpools and eddies around the suction inlet | Pay attention to the difference in pressure on both ends of the valve. | ||||||
98 | 6 | 22/11/2024 08:18:42 | 3O/ ASILUM CHARLES LOUISE T. | 5 / 15 | 33.33 | Water head pressure | Contraction | Orifice | Cavitation | Smoothness | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | ii, iv, i & iii | whirlpools and eddies around the suction inlet, as the tank liquid level of the ballast water ascent | Pay attention to the difference in pressure on both ends of the valve., Begin ballast operation with small capacity and at slow speed. | ||||||
99 | 7 | 22/11/2024 08:18:55 | OIC/NW / Suico, Carlo G. | 10 / 15 | 66.67 | Water head pressure | Orifice | Orifice | Orifice | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | whirlpools and eddies around the suction inlet, causing air to enter the pump, presence of pitting, noise and vibration | Pay attention to the difference in pressure on both ends of the valve. | ||||||
100 | 8 | 22/11/2024 08:20:06 | OIC-NW/Canaria, Jerald F. | 8 / 15 | 53.33 | Water head pressure | Orifice | Cavitation | Contraction | Pitting | Water hammer | Attention should be paid to opening or closing the valve. | Make it positive pressure by slowly opening a suction valve of an empty tank | iii, i, ii & iv | causing air to enter the pump | Pay attention to the difference in pressure on both ends of the valve. |