| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | you need the event done: | Quality | Materials required total steps | Scheme plans required total steps | ||||||||||||||||||||||
2 | 3 times for the XM8 | 3 times for the F4F Phantom | And once each for the rest | Total 8 times | substandard | 138 | 42 | I'm always going with | ||||||||||||||||||
3 | but since it's capped, you can only get enough materials for 4 assemblings, so you can't get both top vehicles | balanced | 114 | 66 | detailed | |||||||||||||||||||||
4 | 26 Rounds x 30 minutes = 780 minutes per Minotaur assemble - that's 13 hours... of game time lol | detailed | 90 | 90 | since scheme plans are dropping more than materials, at least for me | |||||||||||||||||||||
5 | ||||||||||||||||||||||||||
6 | Steps | Hull and Running Gear | Engine and Transmission | Turrent and Armament | Steps | Hull and Running Gear | Engine and Transmission | Turrent and Armament | ||||||||||||||||||
7 | 1 | Armored capsule (scheme) | Accumulator battery (scheme) | Cannon breech (scheme) | 5 | Left caterpillar tread (scheme) | Full cell control unit (scheme) | 30mm cannon (scheme) | ||||||||||||||||||
8 | Required | 3x Part of Scheme (detailed) | 3x Part of Scheme (detailed) | 3x Part of Scheme (detailed) | Required | 4x Part of Scheme (detailed) | 5x Part of Scheme (detailed) | 4x Part of Scheme (detailed) | ||||||||||||||||||
9 | Armored capsule | Accumulator battery | Cannon breech | Left caterpillar tread | Full cell control unit | 30mm cannon | 22x non-ferrous | |||||||||||||||||||
10 | Required | 2x Steel | 2x Non-ferrous metals | 2x Composite materials | Required | 3x Steel | 2x Non-ferrous metals | 1x Steel | 24x high-tech | |||||||||||||||||
11 | 1x Composite materials | 2x High-tech components | 1x Non-ferrous metals | 22x composite | ||||||||||||||||||||||
12 | 2x High-tech components | 1x Composite materials | 22x steel | |||||||||||||||||||||||
13 | 1x High-tech components | |||||||||||||||||||||||||
14 | 2 | Armored hull (scheme) | Traction motor (scheme) | Gun barrel (scheme) | ||||||||||||||||||||||
15 | Required | 4x Part of Scheme (detailed) | 4x Part of Scheme (detailed) | 3x Part of Scheme (detailed) | 6 | Right caterpillar tread (scheme) | Traction motor control unit (scheme) | Vertical aiming drive (Scheme) | ||||||||||||||||||
16 | Armored hull | Traction motor | Gun barrel | Required | 4x Part of Scheme (detailed) | 5x Part of Scheme (detailed) | 3x Part of Scheme (detailed) | |||||||||||||||||||
17 | Required | 4x Steel | 2x Steel | 1x Non-ferrous metals | Right caterpillar tread | Traction motor control unit | Vertical aiming drive | spare materials saved by detailed schemes is random - this is why there might be inconsistencies between your own requirements and everyone elses you will even have those discrepancies every time you are doing the steps all over again | ||||||||||||||||||
18 | 3x Composite materials | 1x Non-ferrous metals | 1x Steel | Required | 2x Steel | 2x Non-ferrous metals | 1x Steel | |||||||||||||||||||
19 | 1x Composite materials | 1x Composite materials | 2x High-tech components | 1x Composite materials | ||||||||||||||||||||||
20 | 1x High-tech components | |||||||||||||||||||||||||
21 | ||||||||||||||||||||||||||
22 | 3 | Radio comm. station (scheme) | Fuel cell (scheme) | Turret (scheme) | 7 | Suspension (scheme) | Fuel supply system (scheme) | Turret traversing mechanism (scheme) | ||||||||||||||||||
23 | Required | 4x Part of Scheme (detailed) | 4x Part of Scheme (detailed) | 4x Part of Scheme (detailed) | Required | 4x Part of Scheme (detailed) | 4x Part of Scheme (detailed) | 3x Part of Scheme (detailed) | ||||||||||||||||||
24 | Radio communication station | Fuel cell | Turret | Suspension | Fuel supply system | Turret traversing mechanism | ||||||||||||||||||||
25 | Required | 1x Non-ferrous metals | 2x Non-ferrous metals | 1x Steel | Required | 1x Steel | 1x Steel | 1x Steel | ||||||||||||||||||
26 | 1x Composite materials | 1x Composite materials | 3x Composite materials | 1x Composite materials | 1x Non-ferrous metals | 1x Composite materials | ||||||||||||||||||||
27 | 2x High-tech components | 4x High-tech components | 2x Non-ferrous metals | 2x High-tech components | ||||||||||||||||||||||
28 | ||||||||||||||||||||||||||
29 | 4 | Fire-fighting equipment (scheme) | Cooling system (scheme) | Automatic Loader (scheme) | 8 | On-board computer (scheme) | Fuel tanks (scheme) | Optical devices (scheme) | ||||||||||||||||||
30 | Required | 3x Part of Scheme (detailed) | 3x Part of Scheme (detailed) | 4x Part of Scheme (detailed) | Required | 5x Part of Scheme (detailed) | 4x Part of Scheme (detailed) | 3x Part of Scheme (detailed) | ||||||||||||||||||
31 | Fire-fighting equipment | Cooling system | Automatic Loader | On-board computer | Fuel tanks | Optical devices | ||||||||||||||||||||
32 | Required | 2x Non-ferrous metals | 1x Steel | 1x Steel | Required | 2x Non-ferrous metals | 1x Non-ferrous metals | 1x Composite materials | ||||||||||||||||||
33 | 1x Composite materials | 2x Non-ferrous metals | 1x Composite materials | 1x Composite materials | 1x High-tech components | |||||||||||||||||||||
34 | 1x Composite materials | 5x High-tech components | 1x High-tech components | |||||||||||||||||||||||
35 | 1x High-tech components | |||||||||||||||||||||||||
36 | ||||||||||||||||||||||||||
37 | ||||||||||||||||||||||||||
38 | ||||||||||||||||||||||||||
39 | ||||||||||||||||||||||||||
40 | ||||||||||||||||||||||||||
41 | ||||||||||||||||||||||||||
42 | ||||||||||||||||||||||||||
43 | ||||||||||||||||||||||||||
44 | ||||||||||||||||||||||||||
45 | ||||||||||||||||||||||||||
46 | ||||||||||||||||||||||||||
47 | ||||||||||||||||||||||||||
48 | ||||||||||||||||||||||||||
49 | ||||||||||||||||||||||||||
50 | ||||||||||||||||||||||||||
51 | ||||||||||||||||||||||||||
52 | ||||||||||||||||||||||||||
53 | ||||||||||||||||||||||||||
54 | ||||||||||||||||||||||||||
55 | ||||||||||||||||||||||||||
56 | ||||||||||||||||||||||||||
57 | ||||||||||||||||||||||||||
58 | ||||||||||||||||||||||||||
59 | ||||||||||||||||||||||||||
60 | ||||||||||||||||||||||||||
61 | ||||||||||||||||||||||||||
62 | ||||||||||||||||||||||||||
63 | ||||||||||||||||||||||||||
64 | ||||||||||||||||||||||||||
65 | ||||||||||||||||||||||||||
66 | ||||||||||||||||||||||||||
67 | ||||||||||||||||||||||||||
68 | ||||||||||||||||||||||||||
69 | ||||||||||||||||||||||||||
70 | ||||||||||||||||||||||||||
71 | ||||||||||||||||||||||||||
72 | ||||||||||||||||||||||||||
73 | ||||||||||||||||||||||||||
74 | ||||||||||||||||||||||||||
75 | ||||||||||||||||||||||||||
76 | ||||||||||||||||||||||||||
77 | ||||||||||||||||||||||||||
78 | ||||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||
100 | ||||||||||||||||||||||||||