| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | X | Y | Z | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | |||||||||||||||||||||||||
2 | JOB SAFETY ANALYSIS (JSA) | Doc. No. | |||||||||||||||||||||||
3 | Title of Activity / Work: | WORK AT HIGHT AND MARBLE INSTALLATION | Doc. Rev. Date | 13-Jul-16 | |||||||||||||||||||||
4 | Name of Project Site: SIATOURO | Job No. : | |||||||||||||||||||||||
5 | Location of Project Site: RAILWAY LOOP | PTW No.: | |||||||||||||||||||||||
6 | Name of Contractor: SINOSTEEL INT. | JSA No.: | TEIPL/JSA/001 | ||||||||||||||||||||||
7 | Date of JSA Preparation: 02 MARS 2025 | JSA PART A:- | JSA PART B :- | Activity / Work Location Name: | |||||||||||||||||||||
8 | Sl. No. | Subactivity / Steps | Hazard | Effect | Control Measures | Responsibility | Compliance? Yes / No | Remarks | |||||||||||||||||
9 | PART A:- STANDARD JSA | ||||||||||||||||||||||||
10 | 1 | Site preparation & development | Snakes or insects | Poisoning due to Snake / Insects venom may cause fatality | 1) Spraying of chemicals/repellent to prevent Snakes or insects. | Execution Engineer & Job Supervisor; HSE -Monitoring & Training | |||||||||||||||||||
11 | 2) Good Housekeeping and cleaning ground to make place inhabitat for snakes/insects. | ||||||||||||||||||||||||
12 | 3) Provide First Aid box. Tie up with near by hospital | ||||||||||||||||||||||||
13 | 4) First aid trainings. | ||||||||||||||||||||||||
14 | 2 | Site preparation & development | Mosquitos | Skin Rash, dengue, fever, malaria , skin irritation | 1) Spraying of pest control chemicals to keep away mosquitoes and to kill it’s larvae. | Execution Engineer & Job Supervisor; HSE -Monitoring & Training | |||||||||||||||||||
15 | 2) Maintain Good Housekeeping. | ||||||||||||||||||||||||
16 | 3) Regular cleaning of accumulated water from pits /ditches. | ||||||||||||||||||||||||
17 | 4) Dengue / Malaria awareness. | ||||||||||||||||||||||||
18 | 3 | Site preparation & development , transportation | Dust | Skin and eye irritation, cough , lung irritation | 1) Proper leveling/compacting ground. | Execution Engineer & Job Supervisor; HSE -Monitoring & Training | |||||||||||||||||||
19 | 2) Storing soil or other fine particles material in low height of the heap. Cover them with empty wet gunny bags. | ||||||||||||||||||||||||
20 | 3) Ensure all site traffic adhere to the site speed limit. | ||||||||||||||||||||||||
21 | 4) Vegetation clearing should be carried out on a need basis. | ||||||||||||||||||||||||
22 | 5) Cleaning eyes / face with water. | ||||||||||||||||||||||||
23 | 6) Provide windbreaks either natural or constructed that reduces the wind velocities. Natural wind breaks can be native shrubs or trees left in place during site clearing. Constructed barriers can be made from metal / wood sheets. | ||||||||||||||||||||||||
24 | 7) Air Monitoring for dust (Particulate Matters). | ||||||||||||||||||||||||
25 | 8) Water Sprinkling on ground. | ||||||||||||||||||||||||
26 | 4 | Cutting ground, transportation | Flying stone while cutting ground, transportation, strong wind | Contact with sharp object may cause severe injury | 1) Proper leveling/compacting ground. | Execution Engineer & Job Supervisor; HSE -Monitoring & Training | |||||||||||||||||||
27 | 2) Ensure all site traffic adhere to the site speed limit. | ||||||||||||||||||||||||
28 | 3) Barricade and Put Safety Signage in cutting operation area. | ||||||||||||||||||||||||
29 | 4) Provide windbreaks either natural or constructed that reduces the wind velocities. Natural wind breaks can be native shrubs or trees left in place during site clearing. Constructed windbreaks can be made from metal / wood sheets. | ||||||||||||||||||||||||
30 | 5 | Tree Cutting, Use of tools | Sharp Thorn /sharp edges | Contact with sharp object may cause severe puncture injury. | 1) Cut the trees with thorns carefully by mechanical tools / cutter. | Execution Engineer & Job Supervisor; HSE -Monitoring & Training | |||||||||||||||||||
31 | 2) Use gloves. PPE Assessment Audit | ||||||||||||||||||||||||
32 | 3) Guard the tools. | ||||||||||||||||||||||||
33 | 4) Hold the tool firmly while cutting. | ||||||||||||||||||||||||
34 | 5) HSE Training, | ||||||||||||||||||||||||
35 | PART B:- LOCATION SPECIFIC JSA | ||||||||||||||||||||||||
36 | |||||||||||||||||||||||||
37 | |||||||||||||||||||||||||
38 | |||||||||||||||||||||||||
39 | |||||||||||||||||||||||||
40 | |||||||||||||||||||||||||
41 | Note: | ||||||||||||||||||||||||
42 | Prepared by: | MANAGEMENT BOARD | Reviewed by: | AIME RAPHAEL HABA | Approved by: | ||||||||||||||||||||
43 | Note: | This is standard JSA prepared based on general hazards. Site has to review this JSA & Update considering process involved, site & work location condition, equipments/machines/ tools use, people involved and activities near by job location. | |||||||||||||||||||||||
44 | |||||||||||||||||||||||||
45 | |||||||||||||||||||||||||
46 | |||||||||||||||||||||||||
47 | |||||||||||||||||||||||||
48 | |||||||||||||||||||||||||
49 | |||||||||||||||||||||||||
50 | |||||||||||||||||||||||||
51 | |||||||||||||||||||||||||
52 | |||||||||||||||||||||||||
53 | |||||||||||||||||||||||||
54 | |||||||||||||||||||||||||
55 | |||||||||||||||||||||||||
56 | |||||||||||||||||||||||||
57 | |||||||||||||||||||||||||
58 | |||||||||||||||||||||||||
59 | |||||||||||||||||||||||||
60 | |||||||||||||||||||||||||
61 | |||||||||||||||||||||||||
62 | |||||||||||||||||||||||||
63 | |||||||||||||||||||||||||
64 | |||||||||||||||||||||||||
65 | |||||||||||||||||||||||||
66 | |||||||||||||||||||||||||
67 | |||||||||||||||||||||||||
68 | |||||||||||||||||||||||||
69 | |||||||||||||||||||||||||
70 | |||||||||||||||||||||||||
71 | |||||||||||||||||||||||||
72 | |||||||||||||||||||||||||
73 | |||||||||||||||||||||||||
74 | |||||||||||||||||||||||||
75 | |||||||||||||||||||||||||
76 | |||||||||||||||||||||||||
77 | |||||||||||||||||||||||||
78 | |||||||||||||||||||||||||
79 | |||||||||||||||||||||||||
80 | |||||||||||||||||||||||||
81 | |||||||||||||||||||||||||
82 | |||||||||||||||||||||||||
83 | |||||||||||||||||||||||||
84 | |||||||||||||||||||||||||
85 | |||||||||||||||||||||||||
86 | |||||||||||||||||||||||||
87 | |||||||||||||||||||||||||
88 | |||||||||||||||||||||||||
89 | |||||||||||||||||||||||||
90 | |||||||||||||||||||||||||
91 | |||||||||||||||||||||||||
92 | |||||||||||||||||||||||||
93 | |||||||||||||||||||||||||
94 | |||||||||||||||||||||||||
95 | |||||||||||||||||||||||||
96 | |||||||||||||||||||||||||
97 | |||||||||||||||||||||||||
98 | |||||||||||||||||||||||||
99 | |||||||||||||||||||||||||
100 | |||||||||||||||||||||||||