| A | B | C | D | E | |
|---|---|---|---|---|---|
1 | GERA SONG OF JOY PPM | Check item | GERA Frequency | DATE OF CHECKING | |
2 | DG SET Check list | Task | |||
3 | DG SET Check list | 1 | Check the Engine Auto / Manual selector switches are in auto mode. | D | |
4 | DG SET Check list | 2 | Check all the emergency / stop push buttons are in released condition. | D | |
5 | DG SET Check list | 3 | Check the fuel level is more than 90% in all the tanks. | D | |
6 | DG SET Check list | 4 | Check the fuel level gauge is in working condition. | D | |
7 | DG SET Check list | 5 | Check for any leakages in the fuel piping. | D | |
8 | DG SET Check list | 6 | Check the level of the engine oil. It should be on High level. | D | |
9 | DG SET Check list | 7 | Check coolant level in engine. | D | |
10 | DG SET Check list | 8 | Check the battery voltage. | D | |
11 | DG SET Check list | 9 | Check the area is free from any water leakages etc near engine & control panel. | D | |
12 | DG SET Check list | 10 | Check & Ensure Alternator earthing & body earthing of the DG set. | M | |
13 | DG SET Check list | 11 | Check electrolyte level in battery. | M | |
14 | DG SET Check list | 12 | Check all the fuses are intact & wiring contacts are tightened. | M | |
15 | DG SET Check list | 13 | Check & ensure DG Set & Panel cleaning. | M | |
16 | DG SET Check list | 14 | Check & Ensure Diesel / Oil leakage should not observe | M | |
17 | DG SET Check list | 15 | Check battery Electrolyte specific gravity. | M | |
18 | DG SET Check list | 16 | Check & Ensure Battery terminal tightened. | M | |
19 | DG SET Check list | 17 | Check & Ensure Diesel / Oil leakage should not observe at all connections. | M | |
20 | DG SET Check list | 18 | Control & Power panel cable contacts tightening & Panel Cleaning from inside with the help of air blower. | M | |
21 | DG SET Check list | 19 | Check & ensure that B check has been done. After 250 Rhrs / Period of six month which is earlier. | M | |
22 | DG SET Check list | 20 | B check tobe caried out six monthly / due at running hrs | HY | |
23 | BUILDING PANELS & DB's | Task | |||
24 | BUILDING PANELS & DB's | 1 | Check & ensure panel's & DB's are cleaned. | M | |
25 | BUILDING PANELS & DB's | 2 | Check & ensure panel & panel area / meter room cleaning. | M | |
26 | BUILDING PANELS & DB's | 3 | Check & ensure panel equipment’s are working properly. ( MCCB, Timers, Sensors) | M | |
27 | BUILDING PANELS & DB's | 4 | Check panel room lights are working condition. | M | |
28 | BUILDING PANELS & DB's | 5 | Check panel room Fire Extingusher availablity. | M | |
29 | BUILDING PANELS & DB's | 6 | Check & ensure connectivity & tightness of earthing. | M | |
30 | BUILDING PANELS & DB's | 7 | Check & ensure connectivity & tightness of Nutral connection. | M | |
31 | BUILDING PANELS & DB's | 8 | Check & ensure panels cable connectiity termination & tightness. | M | |
32 | BUILDING PANELS & DB's | 9 | Check the panel Indications & control wirings are working normal. | M | |
33 | BUILDING PANELS & DB's | 10 | Check & ensure operational condition of the MCCB, ACB. | M | |
34 | BUILDING PANELS & DB's | 11 | Check panel Internal cleaning if required clean with the help of air blower. | Q | |
35 | BUILDING PANELS & DB's | 12 | Check & ensure Panel & DB's painting condition. | Q | |
36 | BUILDING PANELS & DB's | 13 | Check Panel & DB Earthing resistance for further smooth operation. | Y | |
37 | WTP System | Task | |||
38 | WTP System | 1 | Check & Ensure Feed pumps & starters operation. | M | |
39 | WTP System | 2 | Check & Ensure filtration system operation. | M | |
40 | WTP System | 3 | Check Treated water Hardness & PH Parameters are within limits. | M | |
41 | WTP System | 4 | Check plant sump pumps are operational. | M | |
42 | WTP System | 5 | Check & ensure cleaning of plant room. | M | |
43 | WTP System | 6 | Check & Ensure WTP room lights are working normal. | M | |
44 | WTP System | 7 | Check the plant room ventilation system operation. | M | |
45 | WTP System | 8 | Check & Ensure Plant Vessel & piping paint condition. | M | |
46 | WTP System | 9 | Check & Ensure all the tank cleaning is done by external agency. | Q | |
47 | WTP System | 10 | Check water quality test from Laboratory quarterly. | Q | |
48 | WTP System | 11 | Check & ensure pump servicing to be done. | Y | |
49 | WTP System | 12 | Check & ensure servicing of the Sand, Acf & Softener if required. | Y | |
50 | HYDROPENUMATIC SYSTEM | Task | |||
51 | Flush, booster, Domestic pumping | 1 | Check & Ensure pumps are working normal. ( noise, Vibration leakage of water to be checked ) | M | |
52 | Flush, booster, Domestic pumping | 2 | Check & ensure pumps strainers condition & cleaning to be done. | M | |
53 | Flush, booster, Domestic pumping | 3 | Check & ensure line air purging points are cleaned for normal operation. | M | |
54 | Flush, booster, Domestic pumping | 4 | Check the pump room area cleaning, all the equipment’s & pipes cleaning to be done. | M | |
55 | Flush, booster, Domestic pumping | 5 | Check the panel condition & cable connections & terminals for proper tightness. | M | |
56 | Flush, booster, Domestic pumping | 6 | Check Pump Pressure controller operation condition & cut ON & cut OFF working condition. | M | |
57 | Flush, booster, Domestic pumping | 7 | Check & ensure leakage should not observe at plant room. | W | |
58 | Flush, booster, Domestic pumping | 9 | Check & Ensure plant room lights are working normal. | W | |
59 | Flush, booster, Domestic pumping | 8 | Check water condition during strainer cleaning if it was observed some dirt in water then tank cleaning schedule to be followed. | M | |
60 | Flush, booster, Domestic pumping | 10 | Check & ensure ventilation of the pump room is normal | W | |
61 | Flush, booster, Domestic pumping | 11 | Check & ensure air pressure of the system check it with pressure gauge if not ok as per design then fill it & report. | W | |
62 | Flush, booster, Domestic pumping | 12 | Check pumps are working on normal condition & operation of VFD. | M | |
63 | Flush, booster, Domestic pumping | 13 | Check & Ensure pump & piping painting condition. | M | |
64 | Flush, booster, Domestic pumping | 14 | Check & Ensure treated water tank cleaning to be done. | Q | |
65 | Flush, booster, Domestic pumping | 15 | Call the vendor for check the system normal operation. | Q | |
66 | Flush, booster, Domestic pumping | 16 | NRV, Pressure sensors, line pressure, logic control, voltage & load current etc to be checked. | Q | |
67 | Flush, booster, Domestic pumping | 16 | line blockage, pressure switch water flow supply, etc to be checked. | Q | |
68 | Flush, booster, Domestic pumping | 17 | Check & ensure all Pumps & panel servicing to be done. ( bearing noise, vibration, NRV vibration etc) | HY | |
69 | Flush, booster, Domestic pumping | 18 | Pumps servicing & leakages rectification to be done. | Y | |
70 | BUILDING Equipments | Task | |||
71 | FIRE EQUIPMENTS | 1 | Check & ensure Fire panel & pumps cleaning it to be done. | M | |
72 | FIRE EQUIPMENTS | 2 | Check & ensure all fire panels indications, Fire Alram panel, MCP, Hooter, Smoke detector are operational | M | |
73 | FIRE EQUIPMENTS | 3 | Check & ensure any leakage from the Fire line & pumps | M | |
74 | FIRE EQUIPMENTS | 4 | Check & Ensure all Fire buckets are at location with sand & water. | M | |
75 | FIRE EQUIPMENTS | 5 | Check fire Panel & starters are operational. | M | |
76 | FIRE EQUIPMENTS | 6 | Check & ensure fire Booster, Jockey & Hydrant pumps are operational. | M | |
77 | FIRE EQUIPMENTS | 7 | Check all the duct & shaft pressurization system operation. | M | |
78 | FIRE EQUIPMENTS | 8 | Quarterly Fire Drill & all the equipment operational status to be checked. | Q | |
79 | OWC | 8 | Check & ensure use of cluture & saw dust on daily basis by ground team. | M | |
80 | OWC | 9 | Check & ensure OWC machine is cleaned | M | |
81 | OWC | 10 | Check & ensure OWC machine motors operation | M | |
82 | OWC | 11 | Check & ensure OWC machine Earthing connectivity. | M | |
83 | OWC | 12 | Check & ensure any unsafe process during operation. | M | |
84 | OWC | 13 | Check manure quality for reused / sale. | M | |
85 | ELEVATORS | 14 | Check & ensure all elevator machine rooms / shaft pit are cleaned. | M | |
86 | ELEVATORS | 15 | Check & ensure all floors, Elevator door tracks cleaning done. | M | |
87 | ELEVATORS | 16 | Check & ensure all lift Cars deep cleaning done | M | |
88 | ELEVATORS | 17 | Check & ensure Emergency light, ARD, door sensors & fire main control working properly. | M | |
89 | ELEVATORS | 18 | Check & ensure any abnormal noise observed during lift operation if observes call the vendor & take approprite action. | M | |
90 | SOLAR WATER HEATER | 19 | Check & Ensure solar plate cleaned properly. | ||
91 | SOLAR WATER HEATER | 20 | Check & Ensure no leakages at the system. | ||
92 | SOLAR WATER HEATER | 21 | Check & Ensure Hot water circulation is proper. | ||
93 | SOLAR WATER HEATER | 22 | Check & ensure all systems are in operational. | ||
94 | SOLAR WATER HEATER | 23 | Check & ensure air purging valves are operational. | ||
95 | SOLAR WATER HEATER | 24 | Check & ensure solar plate pipe internal scaling / cleaning. | ||
96 | INTERCOM / CCTV | 25 | Check & ensure intercom operational status at all the units | M | |
97 | INTERCOM / CCTV | 26 | Check & ensure all Intercom system operation. | M | |
98 | INTERCOM / CCTV | 27 | Check EPBX servicing status | Q | |
99 | INTERCOM / CCTV | 28 | Check all access control readers & locks operation | M | |
100 | INTERCOM / CCTV | 29 | Check & ensure CCTV is working condition | M |