1 | Date | Case | Case Name | Body | Abridged | Link | ||||||||||||||||||||
2 | Dec 8, 2014 | Other | Wake County | Formal kickoff for development of the Wake Transit Plan held at Convention Center, with about 500 people in attendance | https://www.youtube.com/watch?v=7RiPOxaH8FA | |||||||||||||||||||||
3 | Jan 20, 2015 | Other | Wake County | Wake County Transit Choices report presented to the Wake Transit Advisory Group | https://drive.google.com/file/d/1kRGqh22zAhcGpqIbVM-Wdb-EtkGSy7Ue/view | |||||||||||||||||||||
4 | May 11, 2015 | Other | Wake County | Based on input from the Wake Transit Advisory Group and related research, an updated report called Wake County Transit Alternatives was released to the public. | https://drive.google.com/file/d/1OzHQv_fT7uxXmS6tVemIOJBR4L5jqH2v/view | |||||||||||||||||||||
5 | Oct 1, 2015 | Other | Wake County | Surveys of transit riders were conducted along with an online survey over the same time frame. | https://cityofraleigh0drupal.blob.core.usgovcloudapi.net/drupal-prod/COR28/WakeCoTransitSystemsCustomerSurveyFinalReportJune2016.pdf | |||||||||||||||||||||
6 | Oct 5, 2015 | Other | Wake County | 550 likely voters in Wake County surveyed about their opinions on transit, including commuter rail, bus rapid transit, and existing bus services. | https://cityofraleigh0drupal.blob.core.usgovcloudapi.net/drupal-prod/COR28/Wake-Transit-Plan-November-2016.pdf | |||||||||||||||||||||
7 | Nov 3, 2015 | Other | Other | Raleigh municipal elections | https://ballotpedia.org/Raleigh,_North_Carolina_municipal_elections,_2015 | |||||||||||||||||||||
8 | Dec 18, 2015 | Other | Wake County | Following resident input, survey data and associated research, the Transit Advisory Group issued its Final Report & Recommendation to Wake County and municipalities. | https://static1.squarespace.com/static/607736abaed7201d8e3f9987/t/633052f89822c24d605f8463/1664111353341/Recommended+Wake+County+Transit+Plan_12-18-15.pdf | |||||||||||||||||||||
9 | Nov 8, 2016 | Other | Other | By a margin of 53% to 47%, Raleigh voters approve a one half cent sales tax to fund the Wake Transit Plan | https://s3.us-west-1.amazonaws.com/wakegov.com.if-us-west-1/s3fs-public/documents/2021-02/20161108.summary_0.pdf | |||||||||||||||||||||
10 | Oct 10, 2017 | Other | Other | Raleigh municipal elections (runoff held November 7, 20170 | https://ballotpedia.org/Municipal_elections_in_Raleigh,_North_Carolina_(2017) | |||||||||||||||||||||
11 | Oct 9, 2018 | Other | City Council | CC held a worksession to discuss a number of items related to transit and TOD. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=B58N8F5ADA9C | |||||||||||||||||||||
12 | Jan 15, 2019 | Other | City Council | CC held a meeting to discuss long-range plans for BRT and TOD. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=B8AJZV4EC8C9 | |||||||||||||||||||||
13 | Jan 29, 2019 | Other | Transportation and Transit Committee | TTC held a meeting to discuss land use, affordable housing, and economic development goals associated with the Wake Transit Plan. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=B8RFLM3FA973 | |||||||||||||||||||||
14 | Feb 26, 2019 | Other | Transportation and Transit Committee | TTC held an additional meeting to discuss land use, affordable housing, and economic development goals associated with the Wake Transit Plan. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=B9P5GB523F42 | |||||||||||||||||||||
15 | May 28, 2019 | Other | Transportation and Transit Committee | TTC held an additional meeting to discuss land use, affordable housing, and economic development goals associated with the Wake Transit Plan. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=BCGLHB5635F1 | |||||||||||||||||||||
16 | Jun 20, 2019 | Other | Transportation and Transit Committee | TTC discussed additional modifications to the transit overlay districts as well as the appropriate timing of making revisions to TOD. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=BD5L9D530EA5 | |||||||||||||||||||||
17 | Jul 2, 2019 | Other | City Council | CC heard the Transportation and Transit Committee's recommendation to continue transit/corridor planning and delay applying TOD zoning. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=BDBTRA789806 | |||||||||||||||||||||
18 | Sep 24, 2019 | Other | Planning Commission | PC Transportation Committee met on September 10, 2019 to discuss the City of Charlotte's Transit Overlay District ordinance. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=BG4QHC695BD2 | |||||||||||||||||||||
19 | Oct 8, 2019 | Other | Other | Raleigh municipal elections | https://ballotpedia.org/City_elections_in_Raleigh,_North_Carolina_(2019) | |||||||||||||||||||||
20 | Oct 22, 2019 | Other | Transportation and Transit Committee | TTC discussed the ideal timing for applying the TOD to the Western Boulevard Corridor and recommended that staff draft a text change to map out the overlay. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=BGZJXZ4F64CA | |||||||||||||||||||||
21 | Nov 6, 2019 | Other | City Council | CC supported the recommendation from the TTC, directing staff to proceed with a text change. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=BHELAU557D52 | |||||||||||||||||||||
22 | Feb 11, 2020 | Other | City Council | CC heard a wide-ranging update on the progress of transit oriented development and affordable housing. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=BLBMV95D0CE0 | |||||||||||||||||||||
23 | Mar 10, 2020 | TC-1-20 | TOD Parking Minimums et al | Planning Commission | PC took up a text change to reduce parking minimums in numerous parts of the city, and also made changes pertaining to cottage courts and building heights. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=BMCLMR5729F6 | ||||||||||||||||||||
24 | Mar 17, 2020 | TC-1-20 | TOD Parking Minimums et al | Planning Commission | PC Text Change Committee discussed the text change to reduce parking minimums. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=BMKPNC6507CD | ||||||||||||||||||||
25 | May 26, 2020 | TC-1-20 | TOD Parking Minimums et al | Planning Commission | PC separated the text change to reduce parking minimums from other proposals which pertained to cottage courts and building heights. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=BPQPU466416D | ||||||||||||||||||||
26 | Jun 9, 2020 | TC-1-20 | TOD Parking Minimums et al | Planning Commission | PC discussed the text change to reduce parking minimums. The Commission voted unanimously to approve the text change. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=BQ7PPU6427E0 | ||||||||||||||||||||
27 | Jul 7, 2020 | TC-1-20 | TOD Parking Minimums et al | City Council | CC unanimously adopted the text change to reduce parking minimums. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=BQQQTR6884D8 | ||||||||||||||||||||
28 | Jul 7, 2020 | Other | City Council | CC discussed the appropriate timing for mapping of the TOD and voted to delay mapping the TOD until there was clarity around the outcome of any text changes. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=BMYPRZ65F2DE | |||||||||||||||||||||
29 | Sep 15, 2020 | Other | City Council | CC discussed Equitable Development around Transit (EDAT) and referred a variety of items to the Planning Commission. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=BSZQ5E679EAB | |||||||||||||||||||||
30 | Sep 24, 2020 | Other | Transportation and Transit Committee | TTC moved to recommend a text change that would modify TOD based on the proposals in EDAT, and also moved to recommend staff incorporate TOD mapping into station area planning for the New Bern Corridor. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=BTKQN8692A85 | |||||||||||||||||||||
31 | Oct 6, 2020 | Other | City Council | The City Council upheld the recommendations of the Transportation and Transit Committee. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=BTRS4B70D4C5 | |||||||||||||||||||||
32 | May 11, 2021 | TC-17-20 | TOD Revision | Planning Commission | PC Text Change Committee discussed a revision to TOD, including modified parking requirements, density bonuses for affordable housing, and modifications to permitted uses in residential zoning districts. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=C2QSC471D0B3 | ||||||||||||||||||||
33 | Jun 15, 2021 | TC-17-20 | TOD Revision | Planning Commission | PC Text Change Committee engaged in further discussion of the revision to TOD, including the ability to prohibit certain uses and the magnitude of the affordable housing density bonuses. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=C2VKPN514514 | ||||||||||||||||||||
34 | Jun 17, 2021 | New Bern BRT/SAP Community Engagement | City of Raleigh | The city interviewed a group of longtime corridor residents about their experiences in the corridor and to learn how the corridor has changed over time. | https://cityofraleigh0drupal.blob.core.usgovcloudapi.net/drupal-prod/COR22/new-bern-engagement-summary.pdf | |||||||||||||||||||||
35 | Jul 7, 2021 | New Bern BRT/SAP Community Engagement | City of Raleigh | The city began a public engagement process focused on the future of the New Bern corridor. | https://cityofraleigh0drupal.blob.core.usgovcloudapi.net/drupal-prod/COR22/new-bern-engagement-summary.pdf | |||||||||||||||||||||
36 | Aug 3, 2021 | TC-17-20 | TOD Revision | Planning Commission | PC Text Change Committee discussed the text change. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=C54KZ4543CBF | ||||||||||||||||||||
37 | Aug 17, 2021 | TC-17-20 | TOD Revision | Planning Commission | PC Text Change Committee discussed the text change. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=C5SSPT73B129 | ||||||||||||||||||||
38 | Aug 24, 2021 | TC-17-20 | TOD Revision | Planning Commission | PC unanimously voted to recommend the text change. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=C5ELJC56C42D | ||||||||||||||||||||
39 | Sep 14, 2021 | New Bern BRT/SAP Community Engagement | City of Raleigh | The city held a community engagement meeting around housing affordability issues at Martin Street Baptist Church. | https://cityofraleigh0drupal.blob.core.usgovcloudapi.net/drupal-prod/COR22/new-bern-engagement-summary.pdf | |||||||||||||||||||||
40 | Sep 20, 2021 | New Bern BRT/SAP Community Engagement | City of Raleigh | (9/20-10/7) The city held a series of three design workshops. | https://cityofraleigh0drupal.blob.core.usgovcloudapi.net/drupal-prod/COR22/new-bern-engagement-summary.pdf | |||||||||||||||||||||
41 | Sep 21, 2021 | Other | City Council | CC scheduled a hearing on the text change for October 5, 2021. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=C2KQZ36B5987 | |||||||||||||||||||||
42 | Oct 5, 2021 | TC-17-20 | TOD Revision | City Council | CC passed the text change, adapting it to the needs of BRT. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=C6EHYL4A8C3B | ||||||||||||||||||||
43 | Oct 14, 2021 | New Bern BRT/SAP Community Engagement | City of Raleigh | The city's engagement team presented draft recommendations | https://cityofraleigh0drupal.blob.core.usgovcloudapi.net/drupal-prod/COR22/new-bern-engagement-summary.pdf | |||||||||||||||||||||
44 | Oct 15, 2021 | New Bern BRT/SAP Community Engagement | City of Raleigh | The city held a summit to discuss issues around cyclist and pedestrian safety. | https://cityofraleigh0drupal.blob.core.usgovcloudapi.net/drupal-prod/COR22/new-bern-engagement-summary.pdf | |||||||||||||||||||||
45 | Oct 19, 2021 | Other | City Council | The City Council voted to authorize a City-initiated rezoning process to apply the Transit Overlay District (TOD) along the western and southern BRT corridors. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=C7GQVR61F371 | |||||||||||||||||||||
46 | Jan 19, 2022 | Z-18-22 | TOD Mapping - Western Corridor | City of Raleigh | The city held a neighborhood meeting to hear feedback about the Western Boulevard BRT Transit Overlay District | https://go.boarddocs.com/nc/raleigh/Board.nsf/files/CGVMRW5C8C30/$file/20220816PLANDEVZ-18-22PublicHearing.pdf | ||||||||||||||||||||
47 | Jan 20, 2022 | Z-19-22 | TOD Mapping - Southern Corridor | City of Raleigh | The city held a neighborhood meeting to hear feedback about the Southern corridor TOD mapping | https://go.boarddocs.com/nc/raleigh/Board.nsf/files/CFUL2X547EA8/$file/20220705PLANDEVPublicHearingZ-19-22.pdf | ||||||||||||||||||||
48 | Mar 23, 2022 | Z-18-22 | TOD Mapping - Western Corridor | City of Raleigh | The city held a neighborhood meeting to hear feedback about the Western Boulevard BRT Transit Overlay District | https://go.boarddocs.com/nc/raleigh/Board.nsf/files/CGVMRW5C8C30/$file/20220816PLANDEVZ-18-22PublicHearing.pdf | ||||||||||||||||||||
49 | Mar 29, 2022 | Z-19-22 | TOD Mapping - Southern Corridor | City of Raleigh | The city held a neighborhood meeting to hear feedback about the Southern corridor TOD mapping | https://go.boarddocs.com/nc/raleigh/Board.nsf/files/CFUL2X547EA8/$file/20220705PLANDEVPublicHearingZ-19-22.pdf | ||||||||||||||||||||
50 | Apr 21, 2022 | Other | Planning Commission | PC Committee of the Whole had an introductory hearing concerning the Western and Southern BRT TOD mappings. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=CDFSAJ71BF09 | |||||||||||||||||||||
51 | Jun 23, 2022 | Z-19-22 | TOD Mapping - Southern Corridor | Planning Commission | PC Committee of the Whole discussed the TOD mapping for the Southern and Western corridors. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=CFEQZG6ABE85 | ||||||||||||||||||||
52 | Jun 28, 2022 | Z-18-22 | TOD Mapping - Western Corridor | Planning Commission | PC discussed the TOD mapping for the Southern and Western corridors. The Commission unanimously voted to approve both. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=CFETP671D866 | ||||||||||||||||||||
53 | Jul 5, 2022 | Z-19-22 | TOD Mapping - Southern Corridor | City Council | CC applied TOD to parcels along the southern corridor in a unanimous vote. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=CFMHKQ48D919 | ||||||||||||||||||||
54 | Aug 16, 2022 | Z-18-22 | TOD Mapping - Western Corridor | City Council | CC applied TOD to parcels along the Western corridor in a unanimous vote. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=CGFPSU6460D0 | ||||||||||||||||||||
55 | Aug 25, 2022 | Other | Other | US Department of Transportation announces $35M grant for BRT along the New Bern corridor | https://www.transit.dot.gov/about/news/us-department-transportation-announces-35-million-grant-bus-rapid-transit-project#:~:text=WASHINGTON%20%E2%80%93The%20U.S.%20Department%20of,the%20New%20Bern%20Avenue%20corridor. | |||||||||||||||||||||
56 | Nov 8, 2022 | Other | Other | Raleigh municipal elections | https://ballotpedia.org/City_elections_in_Raleigh,_North_Carolina_(2022) | |||||||||||||||||||||
57 | Apr 4, 2023 | Other | City Council | CC authorized the City staff to propose a text change that modified TOD based on discoveries from the engagement process along New Bern corridor. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=CQ8NZQ61B2AB | |||||||||||||||||||||
58 | Apr 26, 2023 | Z-92-22 | TOD Mapping - New Bern Corridor | Planning Commission | PC first took up the SAP rezoning request and a change to the comprehensive plan, providing time for public comment. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=CR3QMB69BA8D | ||||||||||||||||||||
59 | Apr 26, 2023 | CP-7-22 | New Bern Station Area Planning Study and Comprehensive Plan Amendments | Planning Commission | PC Committee of the Whole discussed the New Bern Station Area Planning Study and comprehensive plan amendments. | https://www.youtube.com/watch?v=mOc2M-XAooE&pp=ygU2UmFsZWlnaCBwbGFubmluZyBjb21taXNzaW9uIG9mIHRoZSB3aG9sZSBhcHJpbCAyNiAyMDIz | ||||||||||||||||||||
60 | Jun 7, 2023 | TC-2-23 | TOD Revision - NCOD overlap | Planning Commission | PC Text Change Committee debated a text change that, among other things, would have given TOD control over NCOD where they conflict. See RF's blog post about this topic for more detail. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=CSCH5746C675 | ||||||||||||||||||||
61 | Jun 20, 2023 | Z-92-22 | TOD Mapping - New Bern Corridor | Planning Commission | PC asked for an extension for TC-2-23 to Oct 5, 2023; CP-7-22 to Nov 22, 2023; Z-92-22 SAP to Oct 23, 2023. The Council unanimously agreed to the extension. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=CSRQP8624D40 | ||||||||||||||||||||
62 | Jun 29, 2023 | Z-92-22 | TOD Mapping - New Bern Corridor | Planning Commission | PC held a second hearing on the SAP and the change to the Comp Plan and provided time for public comment. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=CSZQC2689802 | ||||||||||||||||||||
63 | Jun 29, 2023 | CP-7-22 | New Bern Station Area Planning Study and Comprehensive Plan Amendments | Planning Commission | PC Committee of the Whole discussed the New Bern Station Area Planning Study and comprehensive plan amendments. | https://www.youtube.com/watch?v=V3dU9CZCEWA&pp=ygU1UmFsZWlnaCBwbGFubmluZyBjb21taXNzaW9uIG9mIHRoZSB3aG9sZSBqdW5lIDI5IDIwMjM%3D | ||||||||||||||||||||
64 | Aug 16, 2023 | TC-2-23 | TOD Revision - NCOD overlap | Planning Commission | PC Text Change Committee approved the text change, sending it to the entire PC. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=CUGV976EF8F0 | ||||||||||||||||||||
65 | Aug 29, 2023 | Z-92-22 | TOD Mapping - New Bern Corridor | Planning Commission | PC held a 3rd hearing on the SAP and the change to the Comp Plan. The Commission took up property owners' requests to remove/add their properties to the rezoning request. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=CUPSQD739670 | ||||||||||||||||||||
66 | Aug 29, 2023 | CP-7-22 | New Bern Station Area Planning Study and Comprehensive Plan Amendments | Planning Commission | PC Committee of the Whole discussed the New Bern Station Area Planning Study and comprehensive plan amendments. | https://www.youtube.com/watch?v=3-47EWVvCVQ&t=6120s&pp=ygU3UmFsZWlnaCBwbGFubmluZyBjb21taXNzaW9uIG9mIHRoZSB3aG9sZSBhdWd1c3QgMjkgMjAyMw%3D%3D | ||||||||||||||||||||
67 | Sep 12, 2023 | Z-92-22 | TOD Mapping - New Bern Corridor | Planning Commission | PC unanimously approved text change TC-2-23, revising the TOD for greater clarity. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=CVEHT949FDB5 | ||||||||||||||||||||
68 | Sep 12, 2023 | TC-2-23 | TOD Revision - NCOD overlap | Planning Commission | PC unanimously approved the text change, sending it to Council. The Council plans to take up the text change on October 3. | https://go.boarddocs.com/nc/raleigh/Board.nsf/goto?open&id=CUSGSF44BAFB | ||||||||||||||||||||
69 | ||||||||||||||||||||||||||
70 | ||||||||||||||||||||||||||
71 | ||||||||||||||||||||||||||
72 | ||||||||||||||||||||||||||
73 | ||||||||||||||||||||||||||
74 | ||||||||||||||||||||||||||
75 | ||||||||||||||||||||||||||
76 | ||||||||||||||||||||||||||
77 | ||||||||||||||||||||||||||
78 | ||||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||
100 |