Box No.Barcode/UNT NumberReport No.SuffixTitlePrint OCLC No.Electr. OCLC No.Serial InfoHT/UNT StatusHT/UNT-LinksNotes
3
AECBox007FIND3901509498355150003Indian Point Station : Unit 1, Consolidated Edison Company /811254630937431667Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983551;view=1up;seq=1
4
AECBox071AECFIND3901509508974750206R1San Onofre Nuclear Generating Station : Unit 1, Southern California Edison Company (Full-Term-Operating-License stage) June 1963-December 1974 /8112498861014192151Available HT 10/3/2019, NOT in HT 11/8/17https://babel.hathitrust.org/cgi/pt?id=mdp.39015095089747
5
AECBox071AECFIND3901509508973950219Oyster Creek Nuclear Powr Plant : Unit 1, Jersey Central Power and Light Company (Full-Term-Operating-License stage) /9592349781014115458Available HT 10/3/2019, NOT in HT 11/8/17https://babel.hathitrust.org/cgi/pt?id=mdp.39015095089739
6
AECBox007FIND3901509498380950220Nine Mile Point Nuclear Station : Unit 1, Niagara Mohawk Power Corporation /812029171937431671Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983809;view=1up;seq=1
7
AECBox071AECFIND3901509508975450237Dresden Nuclear Power Station : Unit 2, Commonwealth Edison Company (Full-term operating-license stage) /8120290291013838811Available HT 10/3/2019, NOT in HT 11/8/17https://babel.hathitrust.org/cgi/pt?id=mdp.39015095089754
8
AECBox007FIND3901509498381750244R1Robert Emmett Ginna Nuclear Power Plant : Unit no. 1, Rochester Gas & Electric Corporation (Construction-permit stage) /812028004937431675Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983817;view=1up;seq=1
9
AECBox007FIND3901509498382550245R1Millstone Nuclear Power Station : Unit 1, Northeast Nuclear Energy Company (formerly The Millstone Point Company) /812024986937431710Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983825;view=1up;seq=1
10
AECBox007FIND3901509498367650245R1-S1Millstone Nuclear Power Station : Unit 1, Northeast Nuclear Energy Company (formerly The Millstone Point Company) /812025897937431702Available HT 01/11/18, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983676;view=1up;seq=1
11
AECBox007FIND3901509498384150259R2Browns Ferry Nuclear Power Station : Units 1, 2, and 3 Tennessee Valley Authority (Construction-permit stage) /812019676937431573Available HT 1/11/18, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983841;view=1up;seq=1
12
AECBox007FIND3901509498362750272Salem Nuclear Generating Station (formerly Burlington Nuclear Generating Station) : Units 1 and 2, Public Service Electric and Gas Company (Construction-permit stage) /811854470937431640Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983627;view=1up;seq=1
13
AECBox007FIND3901509498361950275Diablo Canyon Nuclear Power Plant : Units 1 and 2, Pacific Gas and Electric Company /811844679937431641Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983619;view=1up;seq=1
14
AECBox007FIND3901509498360150275S1Diablo Canyon Nuclear Power Plant : Units 1 and 2, Pacific Gas and Electric Company (Operating License Stage) /896390401937431607Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983601;view=1up;seq=1
15
AECBox007FIND3901509498370050286Indian Point Station : Unit 3, Consolidated Edison Company (Construction-permit stage) /811777987937431705Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983700;view=1up;seq=1
16
AECBox007FIND3901509498373450289R2Three Mile Island Nuclear Station : Unit 1, Metropolitan Edison Company (Construction-permit stage) /811777867937431715Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983734;view=1up;seq=1
17
AECBox007FIND3901509498377550298R1Cooper Nuclear Station : Nebraska Public Power District (Construction-permit stage) /811772246937431711Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983775;view=1up;seq=1
18
AECBox007FIND3901509498378350302Crystal River Nuclear Generating Plant : Units 3 and 4, Florida Power Corporation (Operating-license stage) /4138272937431644Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983783;view=1up;seq=1
19
AECBox007FIND3901509498393250313Arkansas Nuclear One, Unit 1 : Arkansas Power and Light Company /896825817937431727Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983932;view=1up;seq=1
20
AECBox007FIND3901509498387450315S1Donald C. Cook Nuclear Plant : Units 1 and 2, Indiana & Michigan Electric Company /811616297937431724Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983874;view=1up;seq=1
21
AECBox007FIND3901509498385850315Donald C. Cook Nuclear Plant : Units 1 and 2, Indiana & Michigan Electric Company (Construction Permit stage) /811624880937431712Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983858;view=1up;seq=1
22
AECBox071AECFIND3901509508969750320R1Three Mile Island Nuclear Station : unit 2, Metropolitan Edison Company, Jersey Central Power and Light Company, Pennsylvania Electric Company (Operating-License Stage) /23297191014190030Available HT 10/3/2019, NOT in HT 11/8/17https://babel.hathitrust.org/cgi/pt?id=mdp.39015095089697
23
AECBox071AECFIND3901509508971350327R1Sequoyah Nuclear Plant : Units 1 and 2 : Tennessee Valley Authority (Operating-License stage) /8113461411013977857Available HT 10/3/2019, NOT in HT 11/8/17https://babel.hathitrust.org/cgi/pt?id=mdp.39015095089713
24
AECBox071AECFIND3901509508972150327Sequoyah Nuclear Plant : Units 1 and 2, Tennessee Valley Authority (Operating-License stage) /8116041011013920165Available HT 10/3/2019, NOT in HT 11/8/17https://babel.hathitrust.org/cgi/pt?id=mdp.39015095089721
25
AECBox007FIND3901509498389050334R1Beaver Valley Power Station : Unit 1, Duquesne Light Company (Operating-License stage) /811345947937431741Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983890;view=1up;seq=1
26
AECBox007FIND3901509498390850334Beaver Valley Power Station : Unit 1, Duquesne Light Company /811349231937431751Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983908;view=1up;seq=1
27
AECBox007FIND3901509498740450335St. Lucie Plant (formerly Hutchinson Island Plant) : Unit 1, Florida Power and Light Company (Operating License Stage) /811347759937431665Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987404;view=1up;seq=1
28
AECBox007FIND3901509498710750336Millstone Nuclear Power Station, Unit 2 : Millstone Point Company /896826182937431762Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987107;view=1up;seq=1
29
AECBox071AECFIND3901509508977050338S1North Anna Power Station : Units 1 and 2, Virginia Electric and Power Company (Operating-License Stage) /8113419681013925770Available HT 10/3/2019, NOT in HT 11/8/17https://babel.hathitrust.org/cgi/pt?id=mdp.39015095089770
30
AECBox071AECFIND3901509508976250338R1North Anna Power Station : Units 1 and 2, Virginia Electric and Power Company (Operating-License Stage) /8113443141014412158Available HT 10/3/2019, NOT in HT 11/8/17https://babel.hathitrust.org/cgi/pt?id=mdp.39015095089762
31
AECBox007FIND3901509498725550338North Anna Power Station : Units 1 and 2, Virginia Electric and Power Company /811345033937431807Available in HT 11/8/17; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987255;view=1up;seq=1
32
AECBox007FIND3901509498711550344Trojan Nuclear Plant : Unit 1, Portland General Electric Company (Operating License Stage) /811342854937431657Available HT 11/8/17; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987115;view=1up;seq=1
33
AECBox071AECFIND3901509508979650346R1Davis-Besse Nuclear Power Station : Toledo Edison Company (Operating-License Stage) /23222121013834722Available HT 10/3/2019, NOT in HT 11/8/17https://babel.hathitrust.org/cgi/pt?id=mdp.39015095089796
34
AECBox071AECFIND3901509508978850346Davis-Besse Nuclear Power Station : Toledo Edison Company (Operating-License Stage) /8113391991013981423Available HT 10/3/2019, NOT in HT 11/8/17https://babel.hathitrust.org/cgi/pt?id=mdp.39015095089788
35
AECBox071AECFIND3901509508980450348R1Joseph M. Farley Nuclear Power Plant : Units 1 and 2, Alabama Power Company (Operating License Stage) /8113383421014020159Available HT 10/3/2019, NOT in HT 11/8/17https://babel.hathitrust.org/cgi/pt?id=mdp.39015095089804
36
AECBox071AECFIND3901509508981250368S1Arkansas Nuclear One : Unit 2 : Arkansas Power and Light Company (Operating-license stage) /8112554901013877254Available HT 10/3/2019, NOT in HT 11/8/17https://babel.hathitrust.org/cgi/pt?id=mdp.39015095089812
37
AECBox071AECFIND3901509508982050369R1McGuire Nuclear Station : Units 1 and 2 : Duke Power Company [Operating-license stage] /8112461681014181191In HT 2/28/2019; NOT in HT 11/8/17https://babel.hathitrust.org/cgi/pt?id=mdp.39015095089820
38
AECBox007FIND3901509498722250389St. Lucie Plant : Unit 2, Florida Power & Light Company (Construction-permit stage) /811140204937431821Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987222;view=1up;seq=1
39
AECBox007FIND3901509498736250410Nine Mile Point Nuclear Station : Unit 2, Niagara Mohawk Power Corporation /811027594937431849Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987362;view=1up;seq=1
40
AECBox071AECFIND3901509508970550413R1Catawba Nuclear Station : Units 1 and 2 : Duke Power Company /8110189811014342793Available HT 10/3/2019, https://babel.hathitrust.org/cgi/pt?id=mdp.39015095089705
41
AECBox007FIND3901509498735450413Catawba Nuclear Station : Units 1 and 2, Duke Power Company /811020664937431850Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987354;view=1up;seq=1
42
AECBox007FIND3901509498734750423Millstone Nuclear Power Station : Unit 3, The Millstone Point Company (Construction-permit stage) /810454667937431851Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987347;view=1up;seq=1
43
AECBox007FIND3901509498731350434Surry Power Station : Units 3 and 4, Virginia Electric and Power Company (Construction permit stage) /810450352937431833Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987313;view=1up;seq=1
44
AECBox007FIND3901509498732150438Bellefonte Nuclear Plant : Units 1 and 2, Tennessee Valley Authority (Construction-permit stage) /810450419937431753Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987321;view=1up;seq=1
45
AECBox007FIND3901509498733950440Perry Nuclear Power Plant : Units 1 and 2, Cleveland Electric Illuminating Company /810443975937431754Available HT 6/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987339;view=1up;seq=1
46
AECBox007FIND3901509498754550443Seabrook Station : Units 1 and 2, Public Service Company of New Hampshire /810442935937431893Available HT 6/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987545;view=1up;seq=1
47
AECBox007FIND3901509498753750445Comanche Peak Steam Electric Station : Units 1 and 2, Texas Utilities Generating Company (Construction-permit stage) /810436342937431894Available HT 6/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987537;view=1up;seq=1
48
AECBox007FIND3901509498752950448Douglas Point Nuclear Generating Station : Units 1 and 2, Potomac Electric Power Company /810431281937431877Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987529;view=1up;seq=1
49
AECBox007FIND3901509498751150448S1Douglas Point Nuclear Generating Station : Units 1 and 2, Potomac Electric Power Company (Construction-Permit Stage) /810436179937431717Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987511;view=1up;seq=1
50
AECBox007FIND3901509498749550450R1Summit Power Station : Units 1 and 2, Delmarva Power & Light Company /810343956937431719Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987495;view=1up;seq=1
51
AECBox007FIND3901509498750350450Summit Power Station : Units 1 and 2, Delmarva Power & Light Company /810431240937431718Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987503;view=1up;seq=1
52
AECBox007FIND3901509498748750452Greenwood Energy Center : Units 2 and 3, The Detroit Edison Company (Construction-permit stage) /810339798937431720Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987487;view=1up;seq=1
53
AECBox007FIND3901509498744650458River Bend Station : Units 1 and 2, Gulf States Utilities Company (construction-permit stage) /810336251937431854Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987446;view=1up;seq=1
54
AECBox065FIND3901509508097750460WPPSS Nuclear project No. 1 and No. 4 : Washington Public Power Supply System (construction-permit stage) /8103373441014018602Available HT 10/3/2019, https://babel.hathitrust.org/cgi/pt?id=mdp.39015095080977
55
AECBox007FIND3901509498745350461Clinton Power Station : Units 1 and 2, Illinois Power Company (Construction-permit stage) /810329559937431876Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987453;view=1up;seq=1
56
AECBox007FIND3901509498746150463Fulton Generating Station : Units 1 and 2, Philadelphia Electric Company (Construction-permit stage) /810328374937431721Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987461;view=1up;seq=1
57
AECBox007FIND3901509499084650466Allens Creek Nuclear Generating Station : Units 1 and 2, Houston Lighting and Power Company (Construction-permit stage) /810328852937432201Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094990846;view=1up;seq=1
58
AECBox007FIND3901509499099450471Pilgrim Nuclear Power Station : Unit 2, Boston Edison Company (Construction-Permit Stage) /812516397937432181Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094990994;view=1up;seq=1
59
AECBox065FIND3901509508100950500Davis-Besse Nuclear Power Station : units 2 and 3, Toledo Edison Company : construction-permit stage /40885151014340301Available HT 10/3/2019, https://babel.hathitrust.org/cgi/pt?id=mdp.39015095081009
60
AECBox065FIND3901509508102550514Pebble Springs Nuclear Plant : Units 1 and 2, Portland General Electric Company (Construction-Permit Stage) /8124533921013892145Available HT 10/3/2019, https://babel.hathitrust.org/cgi/pt?id=mdp.39015095081025
61
AECBox065FIND3901509508103350516Jamesport Nuclear Power Station : Units 1 and 2, Long Island Lighting Company (Construction-Permit Stage) /8124116201014027627Available HT 10/3/2019, https://babel.hathitrust.org/cgi/pt?id=mdp.39015095081033
62
AECBox065FIND3901509508105850548Fort Calhoun Station : unit 2 : Omaha Public Power District (construction-permit stage) /40887521014411769Available HT 10/3/2019, https://babel.hathitrust.org/cgi/pt?id=mdp.39015095081058
63
AECBox065FIND3901509508106650549Greene County Nuclear Power Plant : Power Authority of the State of New York : construction-permit stage /40886151013922735Available HT 10/3/2019, https://babel.hathitrust.org/cgi/pt?id=mdp.39015095081066
64
AECBox007FIND390150949839245031750318R1Calvert Cliffs Nuclear Power Plant : Units 1 and 2, Baltimore Gas and Electric Company /811616868937431728Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983924;view=1up;seq=1
65
AECBox007FIND3901509498354400001 (4-72)Power Burst Facility : Phillips Petroleum Company /811249531937431666Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983544;view=1up;seq=1
66
AECBox007FIND3901509498365050244 (12-71)Robert Emmett Ginna Nuclear Power Plant : Unit no. 1 /896164616937431609Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983650;view=1up;seq=1
67
AECBox007FIND3901509498366850245 (7-71)Millstone Nuclear Power Station : Unit 1, Connecticut Light and Power Company (Construction-permit stage) /812023377937431701Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983668;view=1up;seq=1
68
AECBox007FIND3901509498368450259, 50260, 50296 (10-71) Browns Ferry Nuclear Power Station : Units 1, 2, and 3 Tennessee Valley Authority (Construction-permit stage) /812017477937431703Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983684;view=1up;seq=1
69
AECBox007FIND3901509498383350259, 50260, 50296 (5-72)Browns Ferry Nuclear Power Station : Units 1, 2, and 3 Tennessee Valley Authority (Construction-permit stage) /812017477937431703Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983833;view=1up;seq=1
70
AECBox007FIND3901509498364350268 (1-72)Midwest Fuel Recovery Plant : General Electric Company (Construction-permit stage) /812012194937431565Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983643;view=1up;seq=1
71
AECBox007FIND3901509498363550269, 50270, 50287 (12-72)Oconee Nuclear Station : Units 1, 2, and 3, Duke Power Company (Construction-permit stage) /811858384937431566Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983635;view=1up;seq=1
72
AECBox007FIND3901509498359350277,50278 (5-72)Peach Bottom Atomic Power Station : Units 2 and 3, Philadelphia Electric Company (Construction-permit stage) /811841530937431608Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983593;view=1up;seq=1
73
AECBox007FIND3901509498358550277,50278 (9-71)Peach Bottom Atomic Power Station : Units 2 and 3, Philadelphia Electric Company (Construction-permit stage) /811841781937431668Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983585;view=1up;seq=1
74
AECBox007FIND3901509498357750280,50281 (11-71)Surry Power Station : Units 1 and 2, Virginia Electric and Power Company (Construction-permit stage) /811840205937431669Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983577;view=1up;seq=1
75
AECBox007FIND3901509498356950282, 50306 (7-72)Prairie Island Nuclear Generating Plant : Units 1 and 2, Northern States Power Company /811783879937431556Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983569;view=1up;seq=1
76
AECBox007FIND3901509498369250285 (1-72)Fort Calhoun Station : Unit 1, Omaha Public Power District /811780671937431704Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983692;view=1up;seq=1
77
AECBox007FIND3901509498371850289 (4-72)Three Mile Island Nuclear Station : Unit 1, Metropolitan Edison Company (Construction-permit stage) /811777728937431706Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983718;view=1up;seq=1
78
AECBox007FIND3901509498372650289 (9-71)Three Mile Island Nuclear Station : Unit 1, Metropolitan Edison Company (Construction-permit stage) /811774324937431707Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983726;view=1up;seq=1
79
AECBox007FIND3901509498374250293 (9-71)Pilgrim Nuclear Power Station : Boston Edison Company (Construction-permit stage) /811774045937431716Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983742;view=1up;seq=1
80
AECBox007FIND3901509498375950295 (1-72)Zion Station : Units 1 and 2, Commonwealth Edison Company (Construction-permit stage) /811772405937431709Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983759;view=1up;seq=1
81
AECBox007FIND3901509498376750298 (6-72)Cooper Nuclear Station : Nebraska Public Power District (Construction-permit stage) /811771896937431670Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983767;view=1up;seq=1
82
AECBox007FIND3901509498379150305 (3-72)Kewaunee Nuclear Power Plant /896412590937431696Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983791;view=1up;seq=1
83
AECBox007FIND3901509498394050309 (11-71)Maine Yankee Atomic Power Station : Maine Yankee Atomic Power Company (License application) /811763199937431726Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983940;view=1up;seq=1
84
AECBox007FIND3901509498386650315 (10-72)Donald C. Cook Nuclear Plant : Units 1 and 2, Indiana & Michigan Electric Company /811619719937431743Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983866;view=1up;seq=1
85
AECBox007FIND3901509498388250317,50318 (3-72)Calvert Cliffs Nuclear Power Plant : Units 1 and 2, Baltimore Gas and Electric Company /811615746937431725Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983882;view=1up;seq=1
86
AECBox007FIND3901509498391650321 (3-73)Edwin I. Hatch Nuclear Plant : Unit 1, Georgia Power Company /811610543937431750Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094983916;view=1up;seq=1
87
AECBox007FIND3901509498712350348,50364 (8-71)Joseph M. Farley Nuclear Power Plant : Units 1 and 2, Alabama Power Company /811339086937431658Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987123;view=1up;seq=1
88
AECBox007FIND3901509498713150352,50353 (6-71)Limerick Generating Station : Units 1 and 2, Philadelphia Electric Company /811338985937431778Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987131;view=1up;seq=1
89
AECBox007FIND3901509498714950358,50359 (8-71)William H. Zimmer Nuclear Power Station : Units 1 and 2, Cincinnati Gas & Electric Co. /811332208937431780Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987149;view=1up;seq=1
90
AECBox007FIND3901509498715650361 (2-72)San Onofre Nuclear Generating Station : Units 2 and 3, Southern California Edison Company /811325846937431679Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987156;view=1up;seq=1
91
AECBox007FIND3901509498716450363 (5-72)Forked River Nuclear Generating Station : Unit No. 1, Jersey Central Power and Light Company /811260245937431518Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987164;view=1up;seq=1
92
AECBox007FIND3901509498726350363 (7-71)Forked River Nuclear Generating Station : Unit No. 1, Jersey Central Power and Light Company /811267155937431829Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987263;view=1up;seq=1
93
AECBox007FIND3901509498728950366 (11-71)Edwin I. Hatch Nuclear Plant : Unit 2, Georgia Power Company /811260067937431831Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987289;view=1up;seq=1
94
AECBox007FIND3901509498727150366 (7-71)Edwin I. Hatch Nuclear Plant : Unit 2, Georgia Power Company /811260126937431830Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987271;view=1up;seq=1
95
AECBox007FIND3901509498729750367 (7-71)Bailly Generating Station Nuclear 1 : Northern Indiana Public Service Company /811259587952113094Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987297;view=1up;seq=1
96
AECBox007FIND3901509498742050368 (12-71)Arkansas Nuclear One : Unit 2, Arkansas Power and Light Company (Operating-license stage) /811255646937431852Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987420;view=1up;seq=1
97
AECBox007FIND3901509498741250368 (8-71)Arkansas Nuclear One : Unit 2, Arkansas Power and Light Company /811257979937431735Available HT 1/25/2018, Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987412;view=1up;seq=1
98
AECBox007FIND3901509498743850369,50370 (7-71)McGuire Nuclear Station : Units 1 and 2, Duke Power Company /811246887937431853Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987438;view=1up;seq=1
99
AECBox007FIND3901509498717250373 (12-71)La Salle County Station : Units 1 and 2, Commonwealth Edison Company /811239899937431350Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987172;view=1up;seq=1
100
AECBox007FIND3901509498730550373,50374 (8-71)La Salle County Station : Units 1 and 2, Commonwealth Edison Company /811244365937431832Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987305;view=1up;seq=1
101
AECBox007FIND3901509498718050376 (1-73)Aguirre Nuclear Plant : Unit 1, Puerto Rico Water Resources Authority /811210980937431799Available HT 9/21/16; Not in HT 9/10/2015http://babel.hathitrust.org/cgi/pt?id=mdp.39015094987180;view=1up;seq=1