ItemActivityActivitySUBUnitQTY Prod. Rate Days Tot. Man Crew Desc.Tot. M-daysOD (O)Manpower/dayM A N - D A Y STot. Eqmt (X)Eqmt Desc.Tot. E-days (Z)E Q M T - D A Y S
3
IDDescriptionACTIVITY (unit/day)CarpenterMasonSteel FixerHelperOperatorDriverTechnicianPainterAlum. TechWaterproofer(H x I)DozerShovelDump T.B. RollerB. CatS. RollerM. CraneVibratorExcavatorTower Crane
4
SITEWORKS
5
Z0U34-0000Site ClearingM21,502.00 4,200.00 0.36 2.0001 Operator 1 Helper 0.72 10.720.40.41.0001 Dozer 0.36 0.36
6
Z0U34-0010Setting-out / LayoutM160.08 76.00 2.11 3.0002 Carpenter 1 Helper 6.32 16.324.22.1
7
SUBSTRUCTURE
8
Z0U34-0020Excavation for footings + Disposal of MaterialsFor ExcavationM3953.00 409.50 2.33 2.0001 Operator 1 Helper 4.65 22.330.50.51.0001 Dozer 2.33 0.47
9
For DisposalM3555.00 345.60 1.61 8.2500.75 Operator 6 Driver 1.5 Helper 13.25 34.420.50.21.96.7500.75 Shovel 6 D. Truck 10.84 0.24 1.93
10
50.00.00.00.90.71.90.00.00.00.0 0.47 0.24 1.93 - - - - - - -
11
Z0U34-0030Formation Level & CompactionM3238 252.00 0.94 6.250.75 Operator 4 Driver 1.5 Helper 5.90 22.950.70.41.94.7500.5 Shovel 4 D. Truck .25 B. Roller 4.49 0.24 1.89 0.12
12
Z0U34-0040Anti-Termite Applications (Under PCC Footings)M2571 202.50 2.82 1.0002 Technican 2.82 12.822.8
13
Z0U34-0050Backfill & Compaction upto bot. of PCC Tie-BeamM3268 252.00 1.06 8.2500.75 Operator 6 Driver 1.5 Helper 8.77 71.250.20.10.96.7500.5 Shovel 6 D. Truck .25 B. Roller 7.18 0.11 0.86 0.05
14
Z0U34-0060Anti-Termite Applications (Under PCC Tie-Beam)M237 202.50 0.18 1.0002 Technican 0.18 10.180.2
15
Z0U34-0070Backfill & Compaction up to bot of PCC Grd. SlabM32,332.00 252.00 9.25 8.2500.75 Operator 6 Driver 1.5 Helper 76.35 325.454.62.318.56.7500.5 Shovel 6 D. Truck .25 B. Roller 62.46 2.19 17.53 1.10
16
Z0U34-0080Anti-Termite Applications (Under PCC Grade Slab)M2894 202.50 4.41 1.0002 Technican 4.41 14.414.4
17
Z0U34-0090Shutters + 50mm Thk. PCC Under FootingsM2982 270.00 3.64 11.0001 Mason 10 Helper 40.01 220.001.818.2
18
Z0U34-010050mm Protection Screed (Over W.P. Membrane-Ftg.)M22,246.00 270.00 8.32 11.0001 Mason 10 Helper 91.50 245.754.241.6
19
Z0U34-0110RCC For FootingsCastingM3244 180.00 1.36 26.0001 Carpenter 18 Helper 6 Mason 1 Steel Fixer 35.24 135.240.500.5 Vibrator 0.68 0.07
20
FormworksM2 976.00 12.00 81.33 3.0562 Carpenter 1 Helper .056 Operator 248.55 462.1416.38.10.50.056.056 M. Crane 4.55 0.46
21
Rebarskg 43,920.00 250.00 175.68 2.0561 Steel Fixer 1 Helper .056 Operator 361.20 3120.4017.617.61.00.056.056 M. Crane 9.84 0.98
22
DeshutteringM2 976.00 35.00 27.89 3.0562 Carpenter 1 Helper .056 Operator 85.22 242.615.62.80.20.056.056 M. Crane 1.56 0.16
23
1021.80.017.628.51.60.00.00.00.00.0 - - - - - - 1.60 0.07 - -
24
Z0U34-0120RCC Necks Columns / Walls + MEP SleevesCastingM3154 81.00 1.90 22.0002 Carpenter 16 Helper 4 Mason 41.83 141.831.0001 Vibrator 1.90 0.16
25
FormworksM2 616.00 4.00 154.00 3.0562 Carpenter 1 Helper .056 Operator 470.62 594.1225.712.80.70.056.056 M. Crane 8.62 0.72
26
Rebarskg 27,720.00 200.00 138.60 2.0561 Steel Fixer 1 Helper .056 Operator 284.96 471.2411.611.60.60.056.056 M. Crane 7.76 0.65
27
DeshutteringM2 616.00 28.00 22.00 3.0562 Carpenter 1 Helper .056 Operator 67.23 233.623.71.80.10.056.056 M. Crane 1.23 0.10
28
1229.30.011.626.21.50.00.00.00.00.0 - - - - - - 1.47 0.16 - -
29
Z0U34-0130Shutters + 50mm Thk. PCC Under Tie-BeamsM263 270.00 0.23 11.0001 Mason 10 Helper 2.57 21.280.11.2
30
Z0U34-014050mm Screed (Over W.P. Membrane-T.B.)M2144 270.00 0.53 11.0001 Mason 10 Helper 5.87 22.930.32.7
31
Z0U34-0150RCC Tie Beams + MEP SleevesCastingM333 180.00 0.18 22.0001 Carpenter 16 Helper 4 Mason 1 Steel Fixer 4.03 14.030.500.5 Vibrator 0.09 0.01
32
FormworksM2 132.00 4.00 33.00 3.0562 Carpenter 1 Helper .056 Operator 100.85 425.216.63.30.20.056.056 M. Crane 1.85 0.18
33
Rebarskg 5,940.00 250.00 23.76 2.0561 Steel Fixer 1 Helper .056 Operator 48.85 316.282.42.40.10.056.056 M. Crane 1.33 0.13
34
DeshutteringM2 132.00 28.00 4.71 3.0562 Carpenter 1 Helper .056 Operator 14.41 27.200.90.50.00.056.056 M. Crane 0.26 0.03
35
107.50.02.46.10.30.00.00.00.00.0 - - - - - - 0.34 0.01 - -
36
Z0U34-0160RCC Kickers Over Tie-BeamCastingM31 180.00 0.01 22.0001 Carpenter 16 Helper 4 Mason 1 Steel Fixer 0.12 10.120.500.5 Vibrator 0.00 0.001
37
FormworksM2 4.00 4.00 1.00 3.0562 Carpenter 1 Helper .056 Operator 3.06 13.060.50.30.00.056.056 M. Crane 0.06 0.01
38
Rebarskg 180.00 250.00 0.72 2.0561 Steel Fixer 1 Helper .056 Operator 1.48 11.480.20.20.00.056.056 M. Crane 0.04 0.01
39
DeshutteringM2 4.00 28.00 0.14 3.0562 Carpenter 1 Helper .056 Operator 0.44 10.440.10.00.00.056.056 M. Crane 0.01 0.00
40
40.60.00.20.50.00.02608 0.001
41
Z0U34-017050mm Thk. PCC Under Grade SlabM21,537.00 270.00 5.69 11.0001 Mason 10 Helper 62.62 231.312.828.5
42
Z0U34-0180Mesh + Filler Board & RCC For Grade SlabM3208 180.00 1.16 26.0001 Carpenter 18 Helper 6 Mason 1 Steel Fixer 30.04 310.010.42.30.46.91.0001 Vibrator 1.16 0.39
43
Z0U34-019050mm Thk. PCC Steps & RampsM210 270.00 0.04 11.0001 Mason 10 Helper 0.41 20.200.00.2
44
Z0U34-0200Steps & Ramps Works + Place Conc.M35 180.00 0.03 26.0001 Carpenter 18 Helper 6 Mason 1 Steel Fixer 0.72 80.090.00.00.00.11.0001 Vibrator 0.03 0.01
45
Z0U34-0210Waterproofing Membrane (Over PCC Footings)M21,047.00 152.00 6.89 6.0004 Waterproofer 2 Helper 41.33 220.666.913.8 -
46
Z0U34-0220Water Proofing For Neck Column & Wall & FootingM22,021.00 152.00 13.30 6.0004 Waterproofer 2 Helper 79.78 326.598.917.7 -
47
Z0U34-0230Waterproofing Membrane (Over PCC Tie-beams)M267 152.00 0.44 6.0004 Waterproofer 2 Helper 2.64 21.320.40.9 -
48
Z0U34-0240Waterproofing Membrane For Tie BeamsM2121 152.00 0.80 6.0004 Waterproofer 2 Helper 4.78 31.590.51.1 -
49
Z0U34-025050mm Thk. PCC Under Base of TankM277 270.00 0.29 11.0001 Mason 10 Helper 3.14 13.140.32.9 -
50
Z0U34-0260Waterproofing Membrane (Over PCC - Base)M282 152.00 0.54 6.0004 Waterproofer 2 Helper 3.24 13.241.12.2 -
51
Z0U34-027050mm Protect'n Screed (Over W.P. Membrane-Base)M2176 270.00 0.65 11.0001 Mason 10 Helper 7.17 17.170.76.5 -
52
Z0U34-0280RCC Water Tank Base + DeshutteringCastingM338 180.00 0.21 26.0001 Carpenter 18 Helper 6 Mason 1 Steel Fixer 5.49 15.490.500.5 Vibrator 0.11 0.03
53
FormworksM2 152.00 12.00 12.67 3.0562 Carpenter 1 Helper .056 Operator 38.71 138.716.33.20.20.056.056 M. Crane 0.71 0.18
54
Rebarskg 6,840.00 250.00 27.36 2.0561 Steel Fixer 1 Helper .056 Operator 56.25 156.256.86.80.40.056.056 M. Crane 1.53 0.38
55
DeshutteringM2 152.00 35.00 4.34 3.0562 Carpenter 1 Helper .056 Operator 13.27 113.272.21.10.10.056.056 M. Crane 0.24 0.06
56
48.50.06.811.10.60.00.00.00.00.0 - - - - - - 0.62 0.03 - -
57
Z0U34-0290RCC Wall W/MEP Pipes & Water Stop + DeshutteringCastingM334 81.00 0.42 22.0002 Carpenter 16 Helper 4 Mason 9.23 19.231.0001 Vibrator 0.42 0.08
58
FormworksM2 136.00 4.00 34.00 3.0562 Carpenter 1 Helper .056 Operator 103.90 251.9513.66.80.40.056.056 M. Crane 1.90 0.38
59
Rebarskg 6,120.00 200.00 30.60 2.0561 Steel Fixer 1 Helper .056 Operator 62.91 162.916.16.10.30.056.056 M. Crane 1.71 0.34
60
DeshutteringM2 136.00 28.00 4.86 3.0562 Carpenter 1 Helper .056 Operator 14.84 114.841.91.00.10.056.056 M. Crane 0.27 0.05
61
515.50.06.113.90.80.00.00.00.00.0 - - - - - - 0.78 0.08 - -
62
Z0U34-0300RCC Top Slab + Deshuttering for Water TankCastingM3 8.00 180.00 0.04 26.0001 Carpenter 18 Helper 6 Mason 1 Steel Fixer 1.16 11.161.0001 Vibrator 0.04 0.01
63
FormworksM2 40.00 16.00 2.50 3.0562 Carpenter 1 Helper .056 Operator 7.64 23.821.00.50.00.056.056 M. Crane 0.14 0.03
64
Rebarskg 1,440.00 200.00 7.20 2.0561 Steel Fixer 1 Helper .056 Operator 14.80 114.801.41.40.10.056.056 M. Crane 0.40 0.08
65
DeshutteringM2 40.00 32.00 1.25 3.0562 Carpenter 1 Helper .056 Operator 3.82 13.820.50.30.00.056.056 M. Crane 0.07 0.01
66
51.50.01.42.20.10.00.00.00.00.0 - - - - - - 0.12 0.01 - -
67
Z0U34-0310Water Proofing Membrane all around outside surfcM2172 152.00 1.13 6.0004 Waterproofer 2 Helper 6.79 23.391.12.3 -
68
Z0U34-0320Protection Board all around outside surfaceM2172 152.00 1.13 6.0004 Waterproofer 2 Helper 6.79 23.391.12.3 -
69
Z0U34-0330Backfill around Water tank wallsM36 252.00 0.02 8.2500.75 Operator 6 Driver 1.5 Helper 0.20 30.070.00.00.06.7500.5 Shovel 6 D. Truck .25 B. Roller 0.16 0.01 0.05 0.00
70
Z0U34-0340G.R.P. Lining around inside + S.S. Lader & DoorM2221 20.00 11.05 2.0001 Mason 1 Helper 22.10 37.373.73.7
71
Z0U34-035050mm Thk. PCC Under Base of Elevator ShaftM214 270.00 0.05 11.0001 Mason 10 Helper 0.57 10.570.10.5 -
72
Z0U34-0360Waterproofing Membrane (Over PCC - Base)M215 152.00 0.10 6.0004 Waterproofer 2 Helper 0.59 10.590.20.4 -
73
Z0U34-037050mm Protect'n Screed (Over W.P. Membrane-Base)M232 270.00 0.12 11.0001 Mason 10 Helper 1.30 11.300.11.2 -
74
Z0U34-0380RCC Elevator Shaft Base + DeshutteringCastingM37 180.00 0.04 26.0001 Carpenter 18 Helper 6 Mason 1 Steel Fixer 1.01 11.010.500.5 Vibrator 0.02 0.00
75
FormworksM2 28.00 12.00 2.33 3.0562 Carpenter 1 Helper .056 Operator 7.13 17.131.20.60.00.056.056 M. Crane 0.13 0.03
76
Rebarskg 1,260.00 250.00 5.04 2.0561 Steel Fixer 1 Helper .056 Operator 10.36 110.361.31.30.10.056.056 M. Crane 0.28 0.07
77
DeshutteringM2 28.00 35.00 0.80 3.0562 Carpenter 1 Helper .056 Operator 2.44 12.440.40.20.00.056.056 M. Crane 0.04 0.01
78
41.60.01.32.00.10.00.00.00.00.0 - - - - - - 0.11 0.00 - -
79
Z0U34-0390RCC Wall W/ MEP Cond. + DeshutteringCastingM34 81.00 0.05 22.0002 Carpenter 16 Helper 4 Mason 1.09 11.091.0001 Vibrator 0.05 0.01
80
FormworksM2 16.00 4.00 4.00 3.0562 Carpenter 1 Helper .056 Operator 12.22 26.111.60.80.00.056.056 M. Crane 0.22 0.04
81
Rebarskg 720.00 200.00 3.60 2.0561 Steel Fixer 1 Helper .056 Operator 7.40 17.400.70.70.00.056.056 M. Crane 0.20 0.04
82
DeshutteringM2 16.00 28.00 0.57 3.0562 Carpenter 1 Helper .056 Operator 1.75 11.750.20.10.00.056.056 M. Crane 0.03 0.01
83
51.80.00.71.60.10.00.00.00.00.0 - - - - - - 0.09 0.01 - -
84
Z0U34-0400Water Proofing Membrane all around outside surfcM260 152.00 0.39 6.0004 Waterproofer 2 Helper 2.37 30.790.30.5 -
85
Z0U34-0410Protection Board all around outside surfaceM2216 152.00 1.42 6.0004 Waterproofer 2 Helper 8.53 24.261.42.8 -
86
Z0U34-0420Backfill around the Lift's Pit wallM39.89 252.00 0.04 8.2500.75 Operator 6 Driver 1.5 Helper 0.32 30.110.00.00.16.7500.5 Shovel 6 D. Truck .25 B. Roller 0.26 0.01 0.07 0.00
87
Z0U34-0430RCC For Wall/Col. From Top of Grade Slab-1LCastingM3251 81.00 3.10 22.0002 Carpenter 16 Helper 4 Mason 68.17 168.171.0001 Vibrator 3.10 0.26
88
FormworksM2 1,004.00 4.00 251.00 3.0562 Carpenter 1 Helper .056 Operator 767.06 5153.4141.820.91.20.056.056 M. Crane 14.06 1.17
89
Rebarskg 45,180.00 200.00 225.90 2.0561 Steel Fixer 1 Helper .056 Operator 464.45 4116.1118.818.81.10.056.056 M. Crane 12.65 1.05
90
DeshutteringM2 1,004.00 28.00 35.86 3.0562 Carpenter 1 Helper .056 Operator 109.58 254.796.03.00.20.056.056 M. Crane 2.01 0.17
91
1247.80.018.842.72.40.00.00.00.00.0 - - - - - - 2.39 0.26 - -
92
Z0U34-0440Columns From Top of Grade Slab-1L (Canopy)CastingM31 81.00 0.01 22.0002 Carpenter 16 Helper 4 Mason 0.27 10.271.0001 Vibrator 0.01 0.00
93
FormworksM2 4.00 4.00 1.00 3.0562 Carpenter 1 Helper .056 Operator 3.06 21.530.30.20.00.056.056 M. Crane 0.06 0.01
94
Rebarskg 180.00 200.00 0.90 2.0561 Steel Fixer 1 Helper .056 Operator 1.85 20.930.20.20.00.056.056 M. Crane 0.05 0.01
95
DeshutteringM2 4.00 28.00 0.14 3.0562 Carpenter 1 Helper .056 Operator 0.44 10.440.00.00.00.056.056 M. Crane 0.01 0.00
96
60.40.00.20.30.00.00.00.00.00.0 - - - - - - 0.02 0.00 - -
97
Z0U34-0450RCC Slab / Beam - 1LCastingM3 231.00 180.00 1.28 26.0001 Carpenter 18 Helper 6 Mason 1 Steel Fixer 33.37 133.371.0001 Vibrator 1.28 0.09
98
FormworksM2 1,155.00 16.00 72.19 3.0562 Carpenter 1 Helper .056 Operator 220.61 636.7710.35.20.30.056.056 M. Crane 4.04 0.29
99
Rebarskg 41,580.00 200.00 207.90 2.0561 Steel Fixer 1 Helper .056 Operator 427.44 585.4914.914.90.80.056.056 M. Crane 11.64 0.83
100
DeshutteringM2 1,155.00 32.00 36.09 3.0562 Carpenter 1 Helper .056 Operator 110.30 255.155.22.60.10.056.056 M. Crane 2.02 0.14