GIBBENCLOTHING · FOUNDATIONS
2
The Garment Inspection Checklist
3
Pre-Production · Inline · Final · Documentation — gibbenclothing.com
4
5
ORDER DETAILS (fill in the sand cells)
6
Brand / client:Style no. / name:
7
Order qty:Factory:gibbenclothing — Sialkot, PK
8
Inspector:Date:
9
10
PROGRESS
11
GatePassedResult
12
GATE 1Before the run — Pre-production0 / 6IN PROGRESS
13
GATE 2During the run — Inline0 / 6IN PROGRESS
14
GATE 3After the run — Final / pre-shipment0 / 7IN PROGRESS
15
DOCSThroughout — Documentation & photo evidence0 / 3IN PROGRESS
16
17
GATE 1 Before the run — Pre-productionSTATUSNOTES / EVIDENCE REF.
18
1Bulk fabric received, inspected (4-point / ASTM D5430) and matches spec — composition, GSM, width, finish.PENDING
19
2Colour approved against a physical Pantone / lab-dip reference, in a light booth, in writing.PENDING
20
3Trims & components final — zips, drawcords, eyelets, woven & care labels, hangtags.PENDING
21
4PP sample made from real bulk fabric, on the production line, with final trims.PENDING
22
5Golden sample signed, sealed, tagged (style no. + date); counter-sample retained.PENDING
23
6Measurement spec & tolerances locked and shared with the factory.PENDING
24
25
GATE 2 During the run — InlineSTATUSNOTES / EVIDENCE REF.
26
7First-off-line units checked against the golden sample before the run continues.PENDING
27
8AQL levels agreed in advance — critical 0 / major 2.5 / minor 4.0 (ISO 2859-1, General Level II) or house standard.PENDING
28
9Construction sound — stitch density, seam types and finish hold at production speed.PENDING
29
10Decoration correct — print registration & hand; embroidery placement & tension.PENDING
30
11Shade consistent — panels on one garment share a dye lot.PENDING
31
12Any defect found is corrected on remaining units, not carried to the end of the run.PENDING
32
33
GATE 3 After the run — Final / pre-shipmentSTATUSNOTES / EVIDENCE REF.
34
13Measurements within tolerance across a sample of the full size run.PENDING
35
14Grading holds — fit correct in every size, not just the base size.PENDING
36
15AQL defect audit passed — random sample; critical / major / minor within agreed limits.PENDING
37
16Colour verified against the physical standard; no drift from the approved lab dip.PENDING
38
17Labels & hangtags correct and secure.PENDING
39
18Packing, size ratio and carton marking match the packing list.PENDING
40
19Balance payment released only against a passed inspection.PENDING
41
42
DOCS Throughout — Documentation & photo evidenceSTATUSNOTES / EVIDENCE REF.
43
20Written, dated, signed inspection report at each gate.PENDING
44
21Photos: golden sample, any defects found, measurement check, packed cartons.PENDING
45
22All records kept together in one folder per order.PENDING
46
47
48
How to use: set each item's STATUS with the dropdown (PENDING / PASS / FAIL / N/A). A single FAIL on a gate = rework and re-inspect before moving on. Release the balance only when Gate 3 reads CLEAR.
49
AQL per ISO 2859-1 / ANSI-ASQ Z1.4 · Fabric inspection per ASTM D5430 (4-point system) · © gibbenclothing — factory-direct, Sialkot, Pakistan · gibbenclothing.com
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100