1 | All Project | (All) | |||||||||||||||||||||||||
2 | CIP REPORT STATUS | (Multiple Items) | |||||||||||||||||||||||||
3 | Project Status | (All) | |||||||||||||||||||||||||
4 | NOTE: The historical projects prior to Prop O are estimated costs of completion and may not reflect actual cost. | ||||||||||||||||||||||||||
5 | School/Site | Site Name/Project Name | Fund 14 Deferred Maintenance | Fund 21 Building Fund Prop BB | Fund 21 Building Fund Prop O Bond Series A | Fund 21 Building Fund Series A Interest + Misc. | Fund 21 Building Fund Prop O Series B | Fund 21 Building Fund Series B Interest + Misc | Fund 21 Building Fund Prop O Series C | Fund 21 Building Fund Series C Interest + Misc | Fund 21 Building Fund Prop O BAN | Fund 25 Capital Facilities Fund | Fund 35 County School Facilities Fund | Fund 40 Special Reserve Fund for Capital Outlay Projects | Sum of Fund 49 Capital Projects Fund for Blended Component Units CFD/Mello-Roos | Other Funding | PROP BB EST PROJECT CLOSE OUT BUDGET | Current Budget | Total Expenditures | Remaining | |||||||
6 | Bonita Vista High School | Bonita Vista HS: Artificial Track & Field | $ - | $ - | $ 177,539.46 | $ - | $ 2,759,879.27 | $ - | $ 2,827,054.65 | $ - | $ - | $ - | $ 278,783.45 | $ - | $ 847,478.04 | $ - | $ - | $ 19,295,493.76 | $ 6,890,734.87 | $ 12,404,758.89 | |||||||
7 | Bonita Vista HS HVAC upgrade | $ - | $ - | $ 926,456.29 | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 343,546.71 | $ - | $ - | $ 1,270,003.00 | $ 1,270,003.00 | $ - | ||||||||
8 | Bonita Vista HS Bleachers | $ - | $ - | $ 309,122.00 | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 309,122.00 | $ 618,244.00 | $ 618,244.00 | $ - | ||||||||
9 | Bonita Vista HS Title IX (Girls Locker Rm) | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 433,935.00 | $ - | $ - | $ - | $ - | $ 433,935.00 | $ 433,935.00 | $ - | ||||||||
10 | Bonita Vista HS: 600 Bldg Modernization | $ - | $ - | $ - | $ - | $ - | $ - | $ 108,929.38 | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 108,929.38 | $ 108,929.38 | $ - | ||||||||
11 | BVH (48 Classrooms; 4 Restrooms) | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 18,083,565.25 | $ 18,083,565.25 | $ 18,083,565.25 | $ - | ||||||||
12 | Bonita Vista High School Total | $ - | $ - | $ 1,413,117.75 | $ - | $ 2,759,879.27 | $ - | $ 2,935,984.03 | $ - | $ - | $ - | $ 712,718.45 | $ - | $ 1,191,024.75 | $ - | $ 18,392,687.25 | $ 39,810,170.39 | $ 27,405,411.50 | $ 12,404,758.89 | ||||||||
13 | Castle Park High School | Castle Park HS: Stadium Modernization | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 1,000,000.00 | $ - | $ 1,000,000.00 | |||||||
14 | CPH Band Room Abatement/Remediation | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 153,295.00 | $ - | $ - | $ - | $ - | $ 153,295.00 | $ 153,295.00 | $ - | ||||||||
15 | Castle Park HS Stadium Scoreboard | $ 41,581.00 | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 41,581.00 | $ 41,581.00 | $ - | ||||||||
16 | Castle Park HS Title IX Improvements | $ - | $ - | $ 1,710,487.00 | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 1,710,487.00 | $ 1,710,487.00 | $ - | ||||||||
17 | Castle Park HS Title IX | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 6,163.34 | $ - | $ - | $ - | $ - | $ 6,163.34 | $ 6,163.34 | $ - | ||||||||
18 | Castle Park HS: Gym Bleachers | $ - | $ - | $ - | $ - | $ 534,998.00 | $ - | $ - | $ - | $ - | $ - | $ 481,914.00 | $ - | $ - | $ - | $ - | $ 1,016,912.00 | $ 1,016,912.00 | $ - | ||||||||
19 | Castle Park HS: 1200 Bldg Modernization (Design) | $ - | $ - | $ - | $ - | $ - | $ - | $ 72,277.00 | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 72,277.00 | $ 72,277.00 | $ - | ||||||||
20 | Castle Park Slope (Emergency Declaration Phase 1) | $ 140,384.68 | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 140,384.68 | $ 140,384.68 | $ - | ||||||||
21 | CPH (48 Classrooms; 5 Restrooms) | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 19,090,335.85 | $ 19,090,335.85 | $ 19,090,335.85 | $ - | ||||||||
22 | Castle Park High School Total | $ 181,965.68 | $ - | $ 1,710,487.00 | $ - | $ 534,998.00 | $ - | $ 72,277.00 | $ - | $ - | $ - | $ 641,372.34 | $ - | $ - | $ - | $ 19,090,335.85 | $ 23,231,435.87 | $ 22,231,435.87 | $ 1,000,000.00 | ||||||||
23 | Chula Vista High School | Chula Vista HS ORG Port/Mod/Backstop | $ - | $ - | $ 2,019,524.00 | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 2,019,524.00 | $ 2,019,524.00 | $ - | |||||||
24 | Chula Vista HS: 100 Bldg Elevator Addition | $ - | $ - | $ - | $ - | $ - | $ - | $ 1,574,370.83 | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 1,574,370.83 | $ 1,574,370.83 | $ - | ||||||||
25 | Chula Vista HS Proj 1 | $ - | $ - | $ 20,221,888.00 | $ 315.00 | $ - | $ - | $ - | $ - | $ - | $ - | $ 8,782,368.00 | $ - | $ - | $ 24,551.00 | $ - | $ 29,029,122.00 | $ 29,029,122.00 | $ - | ||||||||
26 | Chula Vista HS Covered Walkway | $ 24,550.00 | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 24,550.00 | $ 24,550.00 | $ - | ||||||||
27 | Chula Vista HS Title IX (Softball Team Room) | $ - | $ - | $ 405,589.14 | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 405,589.14 | $ 405,589.14 | $ - | ||||||||
28 | Chula Vista HS: Relocatable Classrooms 2017-18 | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 690,236.64 | $ - | $ - | $ - | $ - | $ - | $ 690,236.64 | $ 690,236.64 | $ - | ||||||||
29 | CVH Tennis Court Resurfacing | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 122,337.50 | $ - | $ - | $ - | $ 122,337.50 | $ 122,337.50 | $ - | ||||||||
30 | Chula Vista HS: Stadium Modernization | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 1,000,000.00 | $ - | $ 1,000,000.00 | ||||||||
31 | CVH (52 Classrooms; 5 Restrooms; ASB) | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 33,727,430.83 | $ 33,727,430.83 | $ 33,727,430.83 | $ - | ||||||||
32 | Capital Improvement Projects Re-Roof CVH [c] | $ - | $ - | $ - | $ - | $ - | $ - | $ 274,815.00 | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 274,815.00 | $ 274,815.00 | $ - | ||||||||
33 | Chula Vista High School Total | $ 24,550.00 | $ - | $ 22,647,001.14 | $ 315.00 | $ - | $ - | $ 1,849,185.83 | $ - | $ - | $ 690,236.64 | $ 8,782,368.00 | $ 122,337.50 | $ - | $ 24,551.00 | $ 33,727,430.83 | $ 68,867,975.94 | $ 67,867,975.94 | $ 1,000,000.00 | ||||||||
34 | Chula Vista Middle School | Chula Vista MS Proj 1 | $ - | $ 2,242,398.00 | $ 8,567,138.00 | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 850,731.00 | $ - | $ - | $ - | $ - | $ 11,660,267.00 | $ 11,660,267.00 | $ - | |||||||
35 | Chula Vista MS Proj 1 (12 Classrooms; 4 Restrooms; | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 2,242,398.00 | $ 2,242,398.00 | $ 2,242,398.00 | $ - | ||||||||
36 | CVM (21 Classrooms; 5 Restrooms; Drama; PE) | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 14,326,621.01 | $ 14,326,621.01 | $ 14,326,621.01 | $ - | ||||||||
37 | CVM MPB | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 3,534,337.51 | $ 3,534,337.51 | $ 3,534,337.51 | $ - | ||||||||
38 | Chula Vista Middle School Total | $ - | $ 2,242,398.00 | $ 8,567,138.00 | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 850,731.00 | $ - | $ - | $ - | $ 20,103,356.52 | $ 31,763,623.52 | $ 31,763,623.52 | $ - | ||||||||
39 | District-Wide | District Business System Implementation | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 3,127,173.48 | $ - | $ - | $ - | $ - | $ - | $ 4,842,785.83 | $ 3,127,173.48 | $ 1,715,612.35 | |||||||
40 | District-Wide Total | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 3,127,173.48 | $ - | $ - | $ - | $ - | $ - | $ 4,842,785.83 | $ 3,127,173.48 | $ 1,715,612.35 | ||||||||
41 | Eastlake High School | Eastlake HS: Campus-wide Flooring Replacement | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 1,250,000.00 | $ - | $ 1,250,000.00 | |||||||
42 | Eastlake HS: ELH Title IX Softball Facility | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 3,014,279.38 | $ - | $ - | $ 5,250,500.00 | $ 3,014,279.38 | $ 2,236,220.62 | ||||||||
43 | Eastlake HS: ELH Track & Field | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 2,631,196.88 | $ - | $ - | $ 4,400,000.00 | $ 2,631,196.88 | $ 1,768,803.12 | ||||||||
44 | Eastlake HS: Interior/Exterior Paint | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 1,500,000.00 | $ - | $ 1,500,000.00 | ||||||||
45 | Eastlake HS: Library Rehabilitation | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 85,404.96 | $ - | $ - | $ 690,000.00 | $ 85,404.96 | $ 604,595.04 | ||||||||
46 | Eastlake HS: New Building | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 347,808.50 | $ - | $ - | $ 1,156,000.00 | $ 347,808.50 | $ 808,191.50 | ||||||||
47 | Eastlake HS: Stage Rehabilitation | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 500,000.00 | $ - | $ 500,000.00 | ||||||||
48 | Eastlake HS Amphitheater/Observatory | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 2,390,558.00 | $ - | $ - | $ 2,390,558.00 | $ 2,390,558.00 | $ - | ||||||||
49 | Eastlake HS Artificial Turf for Quad | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 246,482.00 | $ - | $ - | $ 246,482.00 | $ 246,482.00 | $ - | ||||||||
50 | Eastlake HS Infill Turf & Senior Lawn | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 309,685.00 | $ 120,000.00 | $ - | $ 429,685.00 | $ 429,685.00 | $ - | ||||||||
51 | Eastlake HS: Key Fob Entry | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 200,027.59 | $ - | $ - | $ 200,027.59 | $ 200,027.59 | $ 0.00 | ||||||||
52 | Eastlake HS Learning Center/Science | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 926,368.00 | $ - | $ - | $ - | $ - | $ - | $ 926,368.00 | $ 926,368.00 | $ - | ||||||||
53 | Eastlake HS Marquee & Scoreboards | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 137,148.00 | $ - | $ - | $ - | $ - | $ - | $ 137,148.00 | $ 137,148.00 | $ - | ||||||||
54 | Eastlake HS Relocatable Classrooms 2017-18 | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 114,821.22 | $ - | $ - | $ 114,821.22 | $ 114,821.22 | $ (0.00) | ||||||||
55 | Eastlake HS Roof/HVAC Phase 2 (2015) | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 1,387,403.38 | $ - | $ - | $ 1,387,403.38 | $ 1,387,403.38 | $ - | ||||||||
56 | Eastlake HS Roof/HVAC Phase 3 (2016) | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 1,914,511.67 | $ - | $ - | $ 1,914,511.67 | $ 1,914,511.67 | $ - | ||||||||
57 | Eastlake HS: Roof & HVAC - Replacement Phase 5 | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 2,451,920.94 | $ - | $ - | $ 2,451,920.94 | $ 2,451,920.94 | $ - | ||||||||
58 | Eastlake HS Title IX (Softball Storage Bldg Renov.) | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 86,523.34 | $ - | $ - | $ 86,523.34 | $ 86,523.34 | $ - | ||||||||
59 | Eastlake HS Track & Field | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 1,987,003.00 | $ - | $ - | $ - | $ - | $ - | $ 1,987,003.00 | $ 1,987,003.00 | $ - | ||||||||
60 | Eastlake HS: Drop-Off/Pick-up Zone | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 822,066.07 | $ - | $ - | $ 822,066.07 | $ 822,066.07 | $ 0.00 | ||||||||
61 | Eastlake HS: Roof/HVAC Phase 4 (2017) | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 2,064,407.67 | $ - | $ - | $ 2,064,407.67 | $ 2,064,407.67 | $ - | ||||||||
62 | ELH (Observatory Building; Amphitheater; Ticket Office) | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 64,270.50 | $ 64,270.50 | $ 64,270.50 | $ - | ||||||||
63 | Eastlake High School Total | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 3,050,519.00 | $ - | $ - | $ 18,067,096.60 | $ 120,000.00 | $ 64,270.50 | $ 29,969,696.38 | $ 21,301,886.10 | $ 8,667,810.28 | ||||||||
64 | Eastlake Middle School | Eastlake MS: Shade Structures | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 99,316.12 | $ - | $ - | $ 1,000,000.00 | $ 99,316.12 | $ 900,683.88 | |||||||
65 | Eastlake MS: Access Control | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 250,000.00 | $ - | $ 250,000.00 | ||||||||
66 | Eastlake MS: Asphalt Replacement Outdoor Courts | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 100,000.00 | $ - | $ 100,000.00 | ||||||||
67 | Eastlake Middle School Total | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 99,316.12 | $ - | $ - | $ 1,350,000.00 | $ 99,316.12 | $ 1,250,683.88 | ||||||||
68 | Hilltop Middle School | Hilltop MS: 600 Building Modernization | $ - | $ - | $ - | $ - | $ 5,501,586.39 | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 7,555,199.00 | $ 5,501,586.39 | $ 2,053,612.61 | |||||||
69 | Hilltop MS Fans | $ - | $ - | $ 58,847.00 | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 58,847.00 | $ 58,847.00 | $ - | ||||||||
70 | Hilltop MS Science Design | $ - | $ - | $ 23,700.00 | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 23,700.00 | $ 23,700.00 | $ - | ||||||||
71 | Hilltop Middle School Total | $ - | $ - | $ 82,547.00 | $ - | $ 5,501,586.39 | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 7,637,746.00 | $ 5,584,133.39 | $ 2,053,612.61 | ||||||||
72 | Mar Vista High School | Mar Vista HS: Aquatics Facilities & Central Campus Mod. | $ - | $ - | $ - | $ - | $ 3,016,498.43 | $ - | $ 2,770,252.69 | $ - | $ - | $ 1,514,207.53 | $ 1,512,763.75 | $ 1,782,047.22 | $ - | $ - | $ - | $ 21,616,823.00 | $ 10,595,769.62 | $ 11,021,053.38 | |||||||
73 | Mar Vista HS: Stadium Modernization | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 1,000,000.00 | $ - | $ 1,000,000.00 | ||||||||
74 | Mar Vista HS Cafeteria Facility Upgrade | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 12,250.00 | $ - | $ - | $ - | $ 33,910.25 | $ - | $ 46,160.25 | $ 46,160.25 | $ - | ||||||||
75 | Mar Vista HS Proj 1 | $ - | $ - | $ 6,807,185.00 | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 2,835,832.00 | $ - | $ - | $ 4,463.00 | $ - | $ 9,647,480.00 | $ 9,647,480.00 | $ - | ||||||||
76 | Mar Vista HS Project 2 | $ - | $ - | $ 1,716,401.90 | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 1,000,000.00 | $ - | $ - | $ - | $ 2,716,401.90 | $ 2,716,401.90 | $ - | ||||||||
77 | Mar Vista Title IX (Backstop & Seating) | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 11,720.00 | $ - | $ - | $ - | $ - | $ 11,720.00 | $ 11,720.00 | $ - | ||||||||
78 | Mar Vista HS Title IX (Softball Batting Cages) | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 3,824.00 | $ - | $ - | $ - | $ - | $ 3,824.00 | $ 3,824.00 | $ - | ||||||||
79 | Mar Vista HS Title IX (Softball Facilities) | $ - | $ - | $ 530,435.00 | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 530,435.00 | $ 530,435.00 | $ - | ||||||||
80 | MVH (10 Classrooms; 8 Restrooms; Gym; PE) | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 19,853,819.82 | $ 19,853,819.82 | $ 19,853,819.82 | $ - | ||||||||
81 | MVH Library | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 100,000.00 | $ 100,000.00 | $ 100,000.00 | $ - | ||||||||
82 | Mar Vista High School Total | $ - | $ - | $ 9,054,021.90 | $ - | $ 3,016,498.43 | $ - | $ 2,770,252.69 | $ - | $ - | $ 1,526,457.53 | $ 4,364,139.75 | $ 2,782,047.22 | $ - | $ 38,373.25 | $ 19,953,819.82 | $ 55,526,663.97 | $ 43,505,610.59 | $ 12,021,053.38 | ||||||||
83 | National City Adult School | National City Adult School: Security Fencing (2018) | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 857,580.56 | $ - | $ - | $ - | $ 857,580.56 | $ 857,580.56 | $ 0.00 | |||||||
84 | National City Adult School Total | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 857,580.56 | $ - | $ - | $ - | $ 857,580.56 | $ 857,580.56 | $ 0.00 | ||||||||
85 | New School Site | Middle School 12/High School 14 [a] | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 1,397,022.14 | $ - | $ - | $ - | $ - | $ 6,764,768.00 | $ 1,397,022.14 | $ 5,367,745.86 | |||||||
86 | New School Site Total | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 1,397,022.14 | $ - | $ - | $ - | $ - | $ 6,764,768.00 | $ 1,397,022.14 | $ 5,367,745.86 | ||||||||
87 | Olympian High School | Olympian HS: New Building (Design) | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 418,832.07 | $ - | $ - | $ 1,219,917.00 | $ 418,832.07 | $ 801,084.93 | |||||||
88 | Olympian HS: East Hills Academy Quad | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 54,621.95 | $ - | $ - | $ - | $ - | $ 54,621.95 | $ 54,621.95 | $ - | ||||||||
89 | Olympian HS : East Hills Academy Roof Replacement | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 182,472.00 | $ - | $ - | $ 182,472.00 | $ 182,472.00 | $ - | ||||||||
90 | Olympian HS (HS 13) | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 51,035,776.00 | $ - | $ - | $ 73,127,010.00 | $ - | $ - | $ 124,162,786.00 | $ 124,162,786.00 | $ - | ||||||||
91 | Olympian HS Title IX | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 28,402.85 | $ - | $ - | $ 28,402.85 | $ 28,402.85 | $ - | ||||||||
92 | Olympian HS: Track & Field Drop Off/Pick Up | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 4,949,136.91 | $ - | $ - | $ 4,949,136.91 | $ 4,949,136.91 | $ (0.00) | ||||||||
93 | Olympian HS: Relocatable Classrooms 2017-18 | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 150,696.81 | $ - | $ - | $ 662,935.05 | $ - | $ - | $ 813,631.86 | $ 813,631.86 | $ - | ||||||||
94 | Olympian High School Total | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 51,186,472.81 | $ 54,621.95 | $ - | $ 79,368,788.88 | $ - | $ - | $ 131,410,968.57 | $ 130,609,883.64 | $ 801,084.93 | ||||||||
95 | Otay Ranch High School | Otay Ranch HS: Perimeter Fence Design & Marquee Rehabilitation | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 85,304.52 | $ - | $ - | $ 500,000.00 | $ 85,304.52 | $ 414,695.48 | |||||||
96 | Otay Ranch HS: Tennis Court Refurbishing | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 300,000.00 | $ - | $ 300,000.00 | ||||||||
97 | Otay Ranch HS: Track, Field and Stadium Restoration | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 1,429,150.51 | $ - | $ - | $ 3,000,000.00 | $ 1,429,150.51 | $ 1,570,849.49 | ||||||||
98 | Otay Ranch HS Water Intrusion Prevention (MPR) | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 48,669.59 | $ - | $ - | $ 48,669.59 | $ 48,669.59 | $ - | ||||||||
99 | Otay Ranch HS Concession Stand | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 64,639.00 | $ - | $ - | $ - | $ - | $ - | $ 64,639.00 | $ 64,639.00 | $ - | ||||||||
100 | Otay Ranch HS Drainage Alterations | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ - | $ 114,368.00 | $ - | $ - | $ 114,368.00 | $ 114,368.00 | $ - |