PROJECT : MONTECITO COUNTRY CLUB (TAKE OFFS)
4
5
6
Date:29-Mar-26
7
ITEM #
DWG. #DESCRIPTION
QUANTITY
UNITUNIT COST
(Labor+ Material)
TOTAL COST
(Labor+ Material)
TRADE COST
8
GENERAL REQUIREMENTS
9
1Supervision (5%)1LS0.0$0
10
2Permits (5%)1LS0.0$0
11
3Final ClEAnup (0.2 Per SQ FT)1LS0.0$0
12
4Mobilization Costs (5%)1LS0.0$0
13
5Project OverhEAds (7.3%)1LS0.0$0
14
6Bonds (8%)1LS0.0$0
15
7Temporary Control & Facilities (5%)1LS0.0$0
16
Subtotal (General Requirements)$0
17
18
DIVISION 02 - EXISTING CONDITIONS
19
D2.1, D2.2,
D3.1, D3.2
Demolition
20
8Remove Existing Door87EA0.0$0
21
9Remove Existing Windows11EA0.0$0
22
10Remove Existing Concrete Slab on grade335SQ FT0.0$0
23
11Remove Existing Ramp160SQ FT0.0$0
24
12Remove Existing Walls1122FT0.0$0
25
13Remove Existing Stair8FT0.0$0
26
14Remove Existing Planter Wall39FT0.0$0
27
15Remove Existing Exterior Concrete25SQ FT0.0$0
28
16Remove Portion of Existing Concrete Wall8FT0.0$0
29
17Remove Existing Wood Guardrail22FT0.0$0
30
18Remove Existing Handrails130FT0.0$0
31
19Remove Existing Stair TrEAd for new finish197SQ FT0.0$0
32
20Remove & Relocate existing Elevator Equipment1EA0.0$0
33
21Remove & Relocate Elevator Call Button2EA0.0$0
34
22Remove Existing Floor Sink1EA0.0$0
35
23Remove Existing Floor Finish3898SQ FT0.0$0
36
24Remove Existing Wall Finishes 3274SQ FT0.0$0
37
25Remove Existing Window Sill21FT0.0$0
38
26Remove Existing Paving2970SQ FT0.0$0
39
27Remove Existing Metal Gates2EA0.0$0
40
28Remove Existing Locker367FT0.0$0
41
29Remove Existing Wall Shelf22FT0.0$0
42
30Remove Existing Lavatory8EA0.0$0
43
31Remove Existing Toilets7EA0.0$0
44
32Remove Existing Urinals4EA0.0$0
45
33Remove Existing Vanity Counter24FT0.0$0
46
34Remove Existing Tile Floor729SQ FT0.0$0
47
35Remove Existing Wall Tile and Base1002SQ FT0.0$0
48
36Remove Existing Millwork16FT0.0$0
49
37Remove Existing Wood Floor119SQ FT0.0$0
50
38Remove Existing Exterior Soffit25SQ FT0.0$0
51
39Remove Existing Ceilings & Associated Framing13792SQ FT0.0$0
52
40Remove Existing BEAm20FT0.0$0
53
41Remove Existing Skylight on roof1EA0.0$0
54
Subtotal (Existing Conditions) $0
55
56
DIVISION 03 - CONCRETE
57
42S2.17'-0" x 7'-0" x 2'-0" Pad Footing Reinf.w/
#6 @12"o.c E.W Top & Bot.
73CY0.0$0
58
436'-0" x 6'-0" x 2'-0" Pad Footing Reinf.w/
#6 @12"o.c E.W Top & Bot.
32CY0.0$0
59
443'-0" x 3'-0" x 1'-6" Pad Footing Reinf.w/
#6 @12"o.c E.W Top & Bot.
1CY0.0$0
60
454'-0" x 4'-0" x 1'-6" Pad Footing Reinf.w/
#6 @12"o.c E.W Top & Bot.
5CY0.0$0
61
467'-0" x 7'-0" x 3'-0" Pad Footing Reinf.w/
#6 @12"o.c E.W Top & Bot.
27CY0.0$0
62
4712'-6" x 7'-0" x 2'-0" Pad Footing Reinf.w/
#6 @12"o.c E.W Top & Bot.
26CY0.0$0
63
4811'-6" x 7'-0" x 2'-0" Pad Footing Reinf.w/
#6 @12"o.c E.W Top & Bot.
6CY0.0$0
64
4920'-6" x 7'-0" x 2'-0" Pad Footing Reinf.w/
#6 @12"o.c E.W Top & Bot.
11CY0.0$0
65
502'-0" x 1'-0" Contin. Footing Reinf. w/
(3)#5 & #5 @ 12"o.c
11CY0.0$0
66
511'-4" x 2'-0" Conti. Concrete Footing Reinf. w/
(2)#5 Top & Bot.
63CY0.0$0
67
5212" x 12" Concrete Pedestal w/ (4)#4 Dowels and (3)#3 Ties0CY0.0$0
68
5312" thick Slab Reinf.w/ #5 @12"o.c E.W Bot.12CY0.0$0
69
545" thick Slab on Grade Reinf.w/ #3@16"o.c E.W140CY0.0$0
70
556" Concrete Slab on Grade Reinf.w/ @3 @18"o.c E.W8CY0.0$0
71
566" Concrete Slab w/ #5 bar @12"o.c E.W22CY0.0$0
72
578" thick Concrete Wall Reinf. w/ (2)#5 cont.Top & Bott
and #5@12"o.c Horiz.& Vert.
34CY0.0$0
73
Subtotal (Concrete) $0
74
75
DIVISION 04 - MASONRY
76
58A2.1Paver System on Concrete Slab584SQ FT0.0$0
77
Subtotal (Masonry) $0
78
79
DIVISION 05 - METAL
80
59A5.3Metal Mechanical Louver (EACH OF 6 SF) 2EA0.0$0
81
6042" High Decorative Metal Guardrail40FT0.0$0
82
61Decorative Metal Screen3EA0.0$0
83
62Downspout16FT0.0$0
84
63S2.2W10x68 Flush BEAm32FT0.0$0
85
64W10x39 Flush BEAm47FT0.0$0
86
65W12x170 Flush BEAm27FT0.0$0
87
66W12x35 Flush BEAm29FT0.0$0
88
67W12x50 Flush BEAm19FT0.0$0
89
68HSS4x4x1/4 Steel Column9EA0.0$0
90
69A11.87/8" HAT Metal Studs @16"o.c65FT0.0$0
91
70A2.3Two Tier Metal Locker55FT0.0$0
92
71A12.12'-0" deep Metal Lockers433FT0.0$0
93
Subtotal (Metal) $0
94
95
DIVISION 06 - WOOD & PLASTIC COMPOSITES
96
72A3.1,A3.21 x 6 T&G Wood Planks1832SQ FT0.0$0
97
73A2.1Timber Pergola216SQ FT0.0$0
98
74S2.2,S4.211 7/8 TJI @ 12"o.c1314FT0.0$0
99
7514" TJI 560 @ 24"o.c526FT0.0$0
100
76(2)16" TJI 360 @16"o.c767FT0.0$0
101
778x10 BEAm20FT0.0$0