Hacker Lab - Rocklin Site Projects and Priorities:7/25/2019
2
Priority:
Project: Activities:Status:Cost:
3
1Photography/Virtual Reality AreaNile creating remote light switches. Shane will install when done.WIP, . SC (Kurt) replaced white backdrop with correct size. Student worker starting next week.How much will HL invest?
added student to Sierra College Staff team for access
4
4Kitchen/hang out spacedesign and constructionUpdated/corrected plumbing for sink. Next: get cost est for counter/cabinets/sink/refrigerator.CC not working.
need to check with Eric & Gina about status/importance of this
5
5Storage cages for members 2'x2'x3'Lockable strorage lockers for members and Demand/interest increasing, planning to use the same cages as Midtown welding. Do we want and larger cages?$250 for 4 shelves (1 shelving unit). 1 for PART - they will buy.
when storage ready can I get a sketch of location/numbers issued so I can add in Nexudus
6
3Welding area electrical installationFinish the electrical installation in welding&woodshop areaChris contacted. no firm schedule. Temporary use of Roger's extension cords.
7
2Tool wallsTool wall in main shop. - Done
Tool wall over lathe in woodshop - Done
wip, next tool walls planned for along sound wall
8
6Add Sound wall baffels
9
7Replace rear portion of Kiosk wall with low desk and cabinets.$400
10
8Supplies retail sales areaHacker Lab selling stuffnear front area
will this be a separate POS system set up to collect tax?
11
9Member Retail areaMembers selling stuffnear front area
12
10Fix the small lockers to allow them to be rented (small lockers near bathroom)Many keys missing. Special deals….
when storage ready can I get a sketch of location/numbers issued so I can add in Nexudus
13
11
Major reconfiguration of work area :Add improved 240V power, Move lasers to main work area and move vent fan outside. Add manual mill, Add maual lathe, Add full size Shopbot.
requires major electric work.
14
12Finishing roomNew capability for Rocklinlow priority, not started
15
13Storage Shelve for electonice storage. Install high shelves for electronic storage. WIP, brackets going up.
16
14
17
18
New Items that need to be prioritized in to list above:
19
20
Remodel/Update Johnny Vu's officeNeeds cover for pipes, paint, baseboard, and hardwood floorwill start this when all other unoccupied offices are rented.
looks like 2 offices will be rented as of Aug 1st 206/210
21
22
23
Completed items :
24
Get rid of the personal items and junkDone, 10 trips to the dump.
25
Clean Upstairs deskone time.Done
26
Setup first classroomDone (ready for SacMakers and others)
27
Prepare 1 large office for rentPaint, add trim, cleanDone, two offices ready 210&211
28
Move/Setup/purge 3D printer areapurge broken/useless printers and suppliesDone, minor changes still in progress.
29
Move reconfigure Electronics labteam of Nile, Jim, Roger,…Done, minor changes still in progress.
30
Maker displays for membersWall shelves and glass display case Done
31
Cracked water pipe on back of buildingminor leakDone, Fix performed by landlord.
32
Prepare 2nd Classroom for useremove junk/organize storage, add desks, TV, AV, paint last wall.Done, painted. TV and speaker installed.
33
Reconfigure sewing labremove extra machines, optimize spaceDone. two machines removed by Steve Hunter for other SC site.
34
3D Printers: Create wall storage for filamentDone
35
Placer Arts Office doormake a barn door, hang on slider, install locking mechanism. Done. Door abnd lock installed. ($200)
36
Sound improvements for conference roomStone wool and carpetDone, Carpet ($925) and sound boxes ($250) installed.
37
Replace water heaterLeaking and will fail (soon)Done, (Roger) $600 vs $1600 plumber bid.
38
Welding: storage rack for long/sheet goods.two racks, 1 for Metal and 1 for Wood. Done (by Kenny P)
39
Aquaponics display setup/startup Aquaponics Done. (Martin and Nelson)
40
41
Dropped/will not pursue items :
42
Ceramics/Pottery areaDo we want this capability???Agreed to drop this project
43
Photo Dark RoomVery low demandAgreed to drop this project
44
Video Production w/sound controlDemand not clearNo obvious location.
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Loading...