3 | Ref. No.: GPL F HS 02 | Date: | 10/20/2020 | |||||||||||||||||||||||
4 | Rev.No.: 00 | Page no. | 01 of 01 | GPL/HIRA/31 | ||||||||||||||||||||||
5 | Hazard Identification & Risk Assessment Format | |||||||||||||||||||||||||
6 | Activity: Block work | |||||||||||||||||||||||||
7 | Sr. No. | Activity | Hazard | Issues (Internal/External) | Risk ( Probable Outcome) | Existing Control | Legal Yes/No | Risk Assessment existing Control Measures | Significant (S) / Non-Significant (NS) | Additional Control Measure | Risk Assessment additional Control Measures | Ref. Of WI/ SOP :- | Opportunities & Action | Remark | ||||||||||||
8 | Probability(P) | Severity(S) | Risk Level (H/M/L) : | Probability(P) | Severity(S) | Risk Level (H/M/L) : | ||||||||||||||||||||
9 | 1 | Mobilization of man power | 1. Deployment of unexperienced manpower | Internal | 1. Personal Injury | 1. Deploy experienced workman on job. 2. Conduct screening, Vertigo test, Medical checkup, Safety induction. 3. Issue ID cards & PPE's. 4. Conduct Job specific training before start of job. | Yes | P2 | S2 | M | S | 1.Ensure regular training of worker. | P1 | S2 | L | Nil | ||||||||||
10 | 2 | Transportation of Bricks,blocks and cement . | Overloading of material | Internal | 1.fall of material 2.personal injury | 1.Ensure bricks or blocks must be in weighted capacity. 2.bricks or blocks should not stacked above the height of trolley. | Yes | P2 | S2 | M | S | 1.Provide training to concerned staff regarding transportation related hazards | P2 | S2 | M | Nil | ||||||||||
11 | 3 | Unloading of bricks and blocks and Cement | Poor communication while unloading of bricks & Block | Internal | 1.Fall of material 2.Personal Injury | 1.Give training to unloading team regarding safe unloading of material 2.Ensure proper communication between unloading workers. | Yes | P2 | S2 | M | S | 1.Conduct regular job specific training | P1 | S2 | L | Nil | ||||||||||
12 | 4 | Storing of material | 1. Over stacking of material | Internal | 1. Fall of material | 1.Stack the material below 1.5 mtr. 2.Cement bag shall be stacked upto the height of 10 bag. | YES | P2 | S2 | M | S | 1.Display the poster at prominent location regarding stacking limit of cement bag & block | P1 | S2 | L | Nil | ||||||||||
13 | 2. Unidentified material. | Internal | 1. Missuse / horse play with Material | 1. Display lable of Material. | P2 | S2 | M | S | Conduct training of all the concerned person. | P1 | S2 | L | Nil | |||||||||||||
14 | 3. Obstructed access | Internal | 1. Fall of person | 1. Provide clear access. | P2 | S2 | M | S | Mark the access. | P1 | S2 | L | Nil | |||||||||||||
15 | 4. Scattered material | Internal | 1. Personal Injury | 1. Maintain good housekeeping. 2. Stack material properly. | P2 | S2 | M | S | ensure regular housekeeping. | P1 | S2 | L | Nil | |||||||||||||
16 | 5.Cement dust expsure at cement store | Internal | 1.occupational diseases like silicosis, asthama | 1.Mentain the proper ventilation in cement store 2. Ensure use of all required ppe's while enetering into cement store. | P2 | S3 | M | S | adopt FIFO system to minimise cement dust generation. | P1 | S3 | L | Nil | |||||||||||||
17 | 3 | Shifting of materials (Brick cement &Block) | 1. Unauthorised Person | Internal | 1. Property Damage 2. Personal Injury | 1. Only Authorised Person Allowing for the job | Yes | P2 | S2 | M | S | Daily Pep Talk Conducted Before Star the work Activity No. of Trainings Conducted for the team | P1 | S2 | L | Nil | ||||||||||
18 | 2. Improper stacking | Internal | 1. Personal Injury | 1. Height of the brick is restricted up to bucket height 2. Usage of safety harness during out side 3. Usages of PVC hand gloves | P2 | S2 | M | Maintain housekeeping. | P1 | S2 | L | Nil | ||||||||||||||
19 | 3. Ergonomic Hazard | Internal | 1. Back injury 2. Fall of person | 1. Ensure use of PPE like gloves and load helmets 2. Ensure safe access | P2 | S2 | M | Daily Pep talk should be conducted before starting the work Training on Manual material lifting should be conducted | P1 | S2 | L | Nil | ||||||||||||||
20 | 4. Failure to use PPE's | Internal | 1. Fall from height | EHS Induction should be given to workers, supervisors. Experienced and trained workers is allowed for the job. Platform stability is checked before put on use. Hard barricading is provided. | P2 | S3 | M | Effective supervision should be provided. | P1 | S3 | L | Nil | ||||||||||||||
21 | 4 | Mortar preparation | 1. Contact with Cement while handling / mixing | Internal | 1. Skin diseases | 1. Rubber hand gloves to be used | Yes | P2 | S3 | M | S | MSDS of cement to be explained during TBT HIRA to be shared with workers & site team | P1 | S3 | L | Nil | ||||||||||
22 | 2.Dust generation while handling of cement | Internal | 1.lungs diseases | 1.Use nose mask while cement handling. 2.Handle the cement properly to prevent dust generation. | P2 | S2 | M | MSDS of cement to be explained during TBT HIRA to be shared with workers & site team | P1 | S2 | L | Nil | ||||||||||||||
23 | 5 | Block work | 1. Unguarded floor opening (Lift shaft opening etc.) | Internal | 1. Falling from height | 1. Hard Barrication with railing and mid railing should be provided. 2. Safety harness to be worn while working at edge 3. Safety net should be provided while working at edge and near lift shaft area before start of work. 4. Before starting activity, work permit should be taken for removal of lift shaft gate or any other protection like barricading. | Yes | P2 | S2 | M | S | Daily inspection by Safety Team Member and supervisor. | P1 | S2 | L | Nil | ||||||||||
24 | 2. Working at edge | Internal | 2. Falling from height | 1. CT props or rigid hook to be provided to anchor safety harness. | Yes | P2 | S2 | M | S | 1.Conduct regular job specific training | P1 | S2 | L | Nil | ||||||||||||
25 | 6 | Cutting of block | 1. Flying particles | Internal | 1. Eye injury | 1. Rotating parts should be guarded 2. Goggles and hand gloves should be provided | YES | P3 | S3 | H | S | Daily and weekly inspection by safety team TBT before starting the activity | P2 | S3 | M | Nil | ||||||||||
26 | 2. Defective equipment | Internal | 1. Electrical shock, injury to hand or eye | 1. Experienced and trained worker is allowed for the job.Tested equipment for cutting 2. Electrical connection through ELCB. 3. Eye and hand protection like goggles and hand gloves | YES | P2 | S3 | M | S | Machine Inspection Done By Safety Team Memberand electriction Before Starting Work Activity. | P2 | S3 | L | Nil | ||||||||||||
27 | 7 | Plaster work | 1. Insufficient working platform 2. Uneven surface 3. Defective Scaffolding 4. Inadequate Illumination | Internal | 1. Fall of person 2. Property Damage | 1. Adequateworking platform should be provided. (600mm) 2. Surface should be leveled and compacted. 3. Inspect scaffolding before start activity. 4. Adequate illumination should be provided. | YES | P2 | S3 | M | S | Carry work under supervision. | P2 | S3 | L | Nil | ||||||||||
28 | ||||||||||||||||||||||||||
29 | ||||||||||||||||||||||||||
30 | ||||||||||||||||||||||||||
31 | ||||||||||||||||||||||||||
32 | RISK Calculation / Evaluatio | |||||||||||||||||||||||||
33 | Probability (P) | P/S | S1 | S2 | S3 | S4 | ||||||||||||||||||||
34 | P1: Improbable | P1 | L | L | M | M | ||||||||||||||||||||
35 | P2 : Remote | P2 | L | M | M | H | ||||||||||||||||||||
36 | P3 : Possible | P3 | M | M | H | H | ||||||||||||||||||||
37 | P4 : Probable | P4 | M | H | H | H | ||||||||||||||||||||
38 | ||||||||||||||||||||||||||
39 | Severity (s) | A : Hazards must be avoided (or the level of risk reduced significantly and reliable by controls) | ||||||||||||||||||||||||
40 | S1 : Negligible | B : Hazards should be avoided (or the level of risk reduced significantly and reliable by controls) | ||||||||||||||||||||||||
41 | S2 : Minor | C : Risk to be controlled as far as reasonably practicable | ||||||||||||||||||||||||
42 | S3 : Sever | D : Risk is controlled as far as reasonably practicable . | ||||||||||||||||||||||||
43 | S4 : Extreme | -- : Acceptable risk | ||||||||||||||||||||||||
44 | LEGAL : If activity come under legal implecation (significant) than additional control measures is to be taken and has to be reviewed periodically. | |||||||||||||||||||||||||
45 | S : Significant | |||||||||||||||||||||||||
46 | NS : Non - Significant. | |||||||||||||||||||||||||
47 | ||||||||||||||||||||||||||
48 | ||||||||||||||||||||||||||
49 | ||||||||||||||||||||||||||
50 | ||||||||||||||||||||||||||
51 | PREPARED BY KEC PROJECT MANAGER PMC SAFETY MANAGER | |||||||||||||||||||||||||
52 | ||||||||||||||||||||||||||
53 | PMC PROJECT MANAGER GPL SAFETY MANAGER GPL PROJECT MANAGER | |||||||||||||||||||||||||
54 | ||||||||||||||||||||||||||
55 | ||||||||||||||||||||||||||
56 | ||||||||||||||||||||||||||
57 | ||||||||||||||||||||||||||
58 | ||||||||||||||||||||||||||
59 | ||||||||||||||||||||||||||
60 | ||||||||||||||||||||||||||
61 | ||||||||||||||||||||||||||
62 | ||||||||||||||||||||||||||
63 | ||||||||||||||||||||||||||
64 | ||||||||||||||||||||||||||
65 | ||||||||||||||||||||||||||
66 | ||||||||||||||||||||||||||
67 | ||||||||||||||||||||||||||
68 | ||||||||||||||||||||||||||
69 | ||||||||||||||||||||||||||
70 | ||||||||||||||||||||||||||
71 | ||||||||||||||||||||||||||
72 | ||||||||||||||||||||||||||
73 | ||||||||||||||||||||||||||
74 | ||||||||||||||||||||||||||
75 | ||||||||||||||||||||||||||
76 | ||||||||||||||||||||||||||
77 | ||||||||||||||||||||||||||
78 | ||||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||
100 | ||||||||||||||||||||||||||