DRILLED PIER
Rev: Beta 1.0 - 03/31/16
9
10
Location:
Drilled PIer
11
12
Gravity Loads (Unfactored)
13
DeadLive
Roof Live
Snow
14
kipkipkipkip
15
3.700.000.000.00
16
17
Lateral Loads (Ultimate)
18
Wind xWind z
Height, h
Seis xSeis z
Height, h
19
kipkipftkipkipft
20
1.850.004.001.100.004.00
21
22
Drilled Pier Properties
23
Pier Round/Square?
R(R or S)
Tie Bar Yield, F'yt:
60.00ksi
Use Default Soil?:
Y(Y or N)
Core Area, Ach:
113.10
24
Pier Diameter, b:
18.00in
Sesimic Category:
D
1/2 in Defl OK?:
Y(Y or N)
Gross Area, Ag:
254.47
25
Concrete Comp, f'c:
3.00ksi
Top Constrained?:
N(Y or N)
Limit Lat Bearing?:
N(Y or N)
Pier Diameter, b:
18.00
26
Rebar Size:
6
Allow 1.33 Increase?:
Y(Y or N)
27
Total # Rebar:
4
Use Overstrength?:
N(Y or N)0
28
Bar clear cover:
3.00in
Overstrength Factor:
1.000
Final soil bearing
29
Rebar Yield, F'y:
60.00ksi
Soils Report?:
N(Y or N)
Alw Lat Bearing:
200pcf266pcf
30
Min Steel Ratio:
0.5%
Alw End Bearing:
1500psf1500psf
31
32
Total Loads on Piers
33
Worse Case Axial Loads on Pier - ASD
Worse Case Loads on Pier - LRFD
34
Pu-asd:3.70kPu-lrfd:5.18k
35
Vu-asd-wind-x:
1.11k
Vu-lrfd-wind-x:
1.85k
Mu-lrfd-wind-x:
7.41k*ft
36
Vu-asd-seis-x:
0.83k
Vu-lrfd-seis-x:
1.10k
Mu-lrfd-seis-x:
4.40k*ft
37
Vu-asd-wind-z:
0.00k
Vu-lrfd-wind-z:
0.00k
Mu-lrfd-wind-z:
0.00k*ft
38
Vu-asd-seis-z:
0.00k
Vu-lrfd-seis-z:
0.00k
Mu-lrfd-seis-z:
0.00k*ft
39
40
Pier Min Longitudinal Steel
41
Steel Area, Ast:
1.77in^2
Percentage of Steel:
0.69%
42
OK
43
Pier Moment and Shear
44
Pier width, b1:
17.67in, equiv
Comp Strip, a:
1.18in
Whit Eq Width:
0.12in
45
Mom Cap, Phi*Mn:
45.37k*ft
Shear Cap, Phi*Vn:
15.33k
Whit Eq depth, d1:
12.00in
46
Mom Act, Mu:
7.41k*ft
Shear Act, Vu:
1.85k
47
OK
48
End Bearing
49
Pier End Area, Ap:
1.77ft^2
Act Soil Pressure:
2,094psf
Allow Soil Pressure:
1,500psf
50
NO GOOD - REVISE
51
Tie Requirements
52
Tie Size:3
Max Spacing of Ties:
4.50in
Table 18.7.5.4 d), e):
0.0281
53
Tie Spacing:
6.00in
Sprial/Round Hoop Ps:
0.0123
54
NO GOOD - REVISE
55
56
Summary
57
Pier Depth:
6.00ft
Pier Vert Reinforcing:
(4) # 6 Rebar
58
Pier Diameter:
18.00in
Pier Ties:
# 3 @ 6 in o.c.
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Loading...
 
 
 
Drilled Piers
Form Responses 1
 
 
Main menu