ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
CONFIGURATION SHEET — Shyamali Engineering Works
2
Change the yellow cells below — the entire Salary Sheet updates automatically
3
4
PARAMETERRATEEFFECTIVE DATENOTES
5
DA Rate (WB 2025-26)113.0%Apr 2025
113% of Basic — WB Labour Gazette 2025-26
6
HRA Rate30.00%Standard30% of Basic (Urban — Howrah/Kolkata)
7
PF Rate — Employee12.00%Statutory12% of Basic, ceiling ₹15,000
8
PF Rate — Employer12.00%StatutoryEmployer match, booked separately
9
ESI Rate — Employee0.75%Statutory0.75% of Gross Salary
10
ESI Rate — Employer3.25%Statutory3.25% of Gross Salary
11
PF Basic Ceiling (₹)15,000StatutoryMandatory PF on Basic up to this amount
12
ESI Gross Ceiling (₹)21,000StatutoryESI not deducted if Gross > this
13
14
PROFESSIONAL TAX SLABS — West Bengal (on Monthly Gross)
15
Gross ≤ ₹10,0000Nil
16
₹10,001 – ₹15,000110₹110 / month
17
₹15,001 – ₹25,000130₹130 / month
18
₹25,001 – ₹40,000150₹150 / month
19
Gross > ₹40,000200
₹200 / month (maximum)
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100