Appendix E - Cost Breakdown for PROPOSED REMOVAL OF EXISTING WHEEL STOPPERS AND CONSTRUCTIONS OF NEW CONCRETE BASE FOR INSTALLATION OF NEW WHEEL STOPPERS AT (AIRSIDE ) SINGAPORE CHANGI AIRPORT.
2
3
ItemDescriptionQuantity Total amount ($)
4
1PreliminariesLump sum $ 20,000.00
5
2INSTALLATION OF NEW WHEEL STOPPER ON EXISTING RIGID PAVEMENT/CONCRETE (TYPE 1) Note: Refer to Location and Length as indicated in Appendix D-Quantity Table Lump sum $ 137,280.00
6
3REMOVAL OF EXISTING WHEEL STOPPER & INSTALLATION OF NEW WHEEL STOPPER (TYPE 2) Note: Refer to Location and Length as indicated in Appendix D-Quantity TableLump sum $ 416,700.00
7
4REMOVAL OF EXISTING WHEEL STOPPER, CONSTRUCT NEW CONCRETE BASE & INSTALLATION OF NEW WHEEL STOPPER (TYPE 2a) Note: Refer to Location and Length as indicated in Appendix D-Quantity TableLump sum $ 99,180.00
8
5CONSTRUCT NEW CONCRETE BASE AND INSTALL NEW WHEEL STOPPER (TYPE 3) Note: Refer to Location and Length as indicated in Appendix D-Quantity TableLump sum $ 214,200.00
9
Total Quoted Price $ 887,360.00
10
SOR for :-Quantity $
11
1INSTALLATION OF NEW WHEEL STOPPER ON EXISTING RIGID PAVEMENT/CONCRETE (TYPE 1) per m run $ 660.00
12
2REMOVAL OF EXISTING WHEEL STOPPER & INSTALLATION OF NEW WHEEL STOPPER (TYPE 2) per m run $ 900.00
13
3REMOVAL OF EXISTING WHEEL STOPPER, CONSTRUCT NEW CONCRETE BASE & INSTALLATION OF NEW WHEEL STOPPER (TYPE 2a) per m run $ 1,140.00
14
4CONSTRUCT NEW CONCRETE BASE AND INSTALL NEW WHEEL STOPPER (TYPE 3)per m run $ 1,020.00
15
Note: All measurement provided is indicative only, contractor to carryout own measurement before submittiing the final costing in Sesami.
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100