| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Demolition | |||||||||||||||||||||||||
2 | GENERALLY | |||||||||||||||||||||||||
3 | Tenderers are referred to the Specification for the full particulars of workmanship and materials, and the quantities herein provided shall be read in conjunction with the drawings | Note | ||||||||||||||||||||||||
4 | This Builders Bill of Quantities has not been measured in accordance with the Australian Standard Method of Measurement of Building Works, 5th Edition | Note | ||||||||||||||||||||||||
5 | The Tenderers should carefully check site to assess the extent of Demolition required for this contract | Note | ||||||||||||||||||||||||
6 | REFERENCES | |||||||||||||||||||||||||
7 | Refer to "" "Amendment For Council" Revision 1 dated 23 May 2024 for Demolition Plan | Note | ||||||||||||||||||||||||
8 | Refer to "" "Construction and Demolition Management Plan" | Note | ||||||||||||||||||||||||
9 | PRICES | |||||||||||||||||||||||||
10 | Prices shall include for: | |||||||||||||||||||||||||
11 | Demolition of work | Note | ||||||||||||||||||||||||
12 | Taking down, removal and cartage from site | Note | ||||||||||||||||||||||||
13 | Cleaning up on completion | Note | ||||||||||||||||||||||||
14 | Protecting adjoining surfaces | Note | ||||||||||||||||||||||||
15 | Making good to work disturbed | Note | ||||||||||||||||||||||||
16 | Recycling waste where required | Note | ||||||||||||||||||||||||
17 | Tip fees | Note | ||||||||||||||||||||||||
18 | Environmental and sustainable requirements detailed in the specification | Note | ||||||||||||||||||||||||
19 | GENERAL ITEMS | |||||||||||||||||||||||||
20 | Allow for site visit to assess the nature and extent of demolition | Item | ||||||||||||||||||||||||
21 | Allow to remove all vegetation within the demolition zone for the new buildings and associated paths including those not specifically noted on the drawings | Item | ||||||||||||||||||||||||
22 | Allow to retain and protect existing works / premises on site and adjoining properties | Item | ||||||||||||||||||||||||
23 | Allow for provision and removal of temporary fencing / screens, hoardings, weather / dust protection measures, security, temporary access, warning notices and the like | Item | ||||||||||||||||||||||||
24 | Allow for all temporary shoring, propping, supports and the like (other than designed shoring and propping measured following) | Item | ||||||||||||||||||||||||
25 | Allow for all required credits for recovered materials | Item | ||||||||||||||||||||||||
26 | Allow for giving notice of any unanticipated hazardous materials or conditions found on site | Item | ||||||||||||||||||||||||
27 | Allow for giving notice of and providing facilities for inspection | Item | ||||||||||||||||||||||||
28 | Allow for compliance with quality assurance requirements | Item | ||||||||||||||||||||||||
29 | Allow for submissions including work plans, data and dilapidation records | Item | ||||||||||||||||||||||||
30 | Allow for traffic management measures | Item | ||||||||||||||||||||||||
31 | Allow for all costs associated with meeting local authority requirements and obtaining approvals | Item | ||||||||||||||||||||||||
32 | Allow to carry out works in accordance with waste management plan | Item | ||||||||||||||||||||||||
33 | Allow to remove all redundant (visible and non visible) works; footings, slabs, retaining walls, pits etc including redundant inground services | Item | ||||||||||||||||||||||||
34 | Allow to remove redundant stormwater lines, grates and pits. | Item | ||||||||||||||||||||||||
35 | Allow for the removal of all Asbestos and Hazardous Material in accordance with the requirements of BCA, Work Cover, Australian Standards and local authorities. | Item | ||||||||||||||||||||||||
36 | Allow for the removal of all Contaminated Material in accordance with the requirements of the local authorities. | Item | ||||||||||||||||||||||||
37 | Allow to remove all debris from site including the payment of all fees etc. | Item | ||||||||||||||||||||||||
38 | Allow to make good all disturbed works | Item | ||||||||||||||||||||||||
39 | NOTES AND ASSUMPTIONS | |||||||||||||||||||||||||
40 | The following measurement of demolition works are INDICATIVE ONLY and it is the contractors responsibility to inspect the site and establish the full extent of Demolition Works. | Note | ||||||||||||||||||||||||
41 | DEMOLITION | |||||||||||||||||||||||||
42 | Demolish existing two-storey brick main building | 887.00 | m2 | |||||||||||||||||||||||
43 | Demolish existing entire ancillary building | 31.00 | m2 | |||||||||||||||||||||||
44 | Demolish existing ancillary store brick rooms | 45.00 | m2 | |||||||||||||||||||||||
45 | Existing 1200mm high metal fence to be removed | 44.00 | m2 | |||||||||||||||||||||||
46 | Demolish existing 1800mm high brick wall | 16.00 | m2 | |||||||||||||||||||||||
47 | Steel fence to be removed (NB: Measured as length, no height provided) | 179.00 | m | |||||||||||||||||||||||
48 | Allow to remove existing water tank | 10.00 | m2 | |||||||||||||||||||||||
49 | Demolish existing concrete slab | 8.00 | m2 | |||||||||||||||||||||||
50 | Demolish existing 200mm thick concrete wall (NB: Measured as length, no height provided) | 8.00 | m | |||||||||||||||||||||||
51 | Demolish existing low brick walls to bowling green (NB: Measured as length, no height provided) | 553.00 | m | |||||||||||||||||||||||
52 | Existing 2000mm high hedge to be removed | 51.00 | m | |||||||||||||||||||||||
53 | Existing planting strip/hedge to be retained | 79.00 | m | |||||||||||||||||||||||
54 | Demolished concrete pathway | 1464.00 | m2 | |||||||||||||||||||||||
55 | Existing tree to be removed | 10.00 | no | |||||||||||||||||||||||
56 | Demolish high light poles (disconnected) | 2.00 | no | |||||||||||||||||||||||
57 | Allow to remove existing caravan | 1.00 | no | |||||||||||||||||||||||
58 | Allow to preserve existing memorial garden | 1.00 | no | |||||||||||||||||||||||
59 | SERVICES | |||||||||||||||||||||||||
60 | Allow to remove Electrical Services as required | 1.00 | Item | |||||||||||||||||||||||
61 | Allow to remove Hydraulic Services as required | 1.00 | Item | |||||||||||||||||||||||
62 | Allow to remove Mechanical Services as required | 1.00 | Item | |||||||||||||||||||||||
63 | ||||||||||||||||||||||||||
64 | ||||||||||||||||||||||||||
65 | ||||||||||||||||||||||||||
66 | ||||||||||||||||||||||||||
67 | ||||||||||||||||||||||||||
68 | ||||||||||||||||||||||||||
69 | ||||||||||||||||||||||||||
70 | ||||||||||||||||||||||||||
71 | ||||||||||||||||||||||||||
72 | ||||||||||||||||||||||||||
73 | ||||||||||||||||||||||||||
74 | ||||||||||||||||||||||||||
75 | ||||||||||||||||||||||||||
76 | ||||||||||||||||||||||||||
77 | ||||||||||||||||||||||||||
78 | ||||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||
100 |