ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
Demolition
2
GENERALLY
3
Tenderers are referred to the Specification for the full particulars of workmanship and materials, and the quantities herein provided shall be read in conjunction with the drawingsNote
4
This Builders Bill of Quantities has not been measured in accordance with the Australian Standard Method of Measurement of Building Works, 5th EditionNote
5
The Tenderers should carefully check site to assess the extent of Demolition required for this contractNote
6
REFERENCES
7
Refer to "" "Amendment For Council" Revision 1 dated 23 May 2024 for Demolition Plan
Note
8
Refer to "" "Construction and Demolition Management Plan"Note
9
PRICES
10
Prices shall include for:
11
Demolition of workNote
12
Taking down, removal and cartage from siteNote
13
Cleaning up on completionNote
14
Protecting adjoining surfacesNote
15
Making good to work disturbedNote
16
Recycling waste where requiredNote
17
Tip feesNote
18
Environmental and sustainable requirements detailed in the specificationNote
19
GENERAL ITEMS
20
Allow for site visit to assess the nature and extent of demolitionItem
21
Allow to remove all vegetation within the demolition zone for the new buildings and associated paths including those not specifically noted on the drawingsItem
22
Allow to retain and protect existing works / premises on site and adjoining propertiesItem
23
Allow for provision and removal of temporary fencing / screens, hoardings, weather / dust protection measures, security, temporary access, warning notices and the likeItem
24
Allow for all temporary shoring, propping, supports and the like (other than designed shoring and propping measured following)Item
25
Allow for all required credits for recovered materialsItem
26
Allow for giving notice of any unanticipated hazardous materials or conditions found on siteItem
27
Allow for giving notice of and providing facilities for inspectionItem
28
Allow for compliance with quality assurance requirementsItem
29
Allow for submissions including work plans, data and dilapidation recordsItem
30
Allow for traffic management measuresItem
31
Allow for all costs associated with meeting local authority requirements and obtaining approvalsItem
32
Allow to carry out works in accordance with waste management plan Item
33
Allow to remove all redundant (visible and non visible) works; footings, slabs, retaining walls, pits etc including redundant inground services Item
34
Allow to remove redundant stormwater lines, grates and pits.Item
35
Allow for the removal of all Asbestos and Hazardous Material in accordance with the requirements of BCA, Work Cover, Australian Standards and local authorities.Item
36
Allow for the removal of all Contaminated Material in accordance with the requirements of the local authorities.Item
37
Allow to remove all debris from site including the payment of all fees etc.Item
38
Allow to make good all disturbed worksItem
39
NOTES AND ASSUMPTIONS
40
The following measurement of demolition works are INDICATIVE ONLY and it is the contractors responsibility to inspect the site and establish the full extent of Demolition Works.Note
41
DEMOLITION
42
Demolish existing two-storey brick main building887.00m2
43
Demolish existing entire ancillary building31.00m2
44
Demolish existing ancillary store brick rooms45.00m2
45
Existing 1200mm high metal fence to be removed44.00m2
46
Demolish existing 1800mm high brick wall16.00m2
47
Steel fence to be removed (NB: Measured as length, no height provided)179.00m
48
Allow to remove existing water tank10.00m2
49
Demolish existing concrete slab8.00m2
50
Demolish existing 200mm thick concrete wall (NB: Measured as length, no height provided)8.00m
51
Demolish existing low brick walls to bowling green (NB: Measured as length, no height provided)553.00m
52
Existing 2000mm high hedge to be removed51.00m
53
Existing planting strip/hedge to be retained79.00m
54
Demolished concrete pathway1464.00m2
55
Existing tree to be removed10.00no
56
Demolish high light poles (disconnected)2.00no
57
Allow to remove existing caravan1.00no
58
Allow to preserve existing memorial garden1.00no
59
SERVICES
60
Allow to remove Electrical Services as required1.00Item
61
Allow to remove Hydraulic Services as required1.00Item
62
Allow to remove Mechanical Services as required1.00Item
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100