ITEM #CSI #DESCRIPTION
QUANTITY
UNITUNIT COST
(Labor+ Material)
TOTAL COST
(Labor+ Material)
TRADE COST
8
1GENERAL REQUIREMENTS
9
1Supervision1LS0.0$0
10
2Permits1LS0.0$0
11
3Final Cleanup1LS0.0$0
12
4Mobilization Costs1LS0.0$0
13
5Project Overheads1LS0.0$0
14
6Bonds1LS0.0$0
15
7Temporary Control & Facilities1LS0.0$0
16
Subtotal (General Requirements)$0
17
2Division 02 — Site Construction
18
CUTTING (EXEMPT GRADING)
19
STRUCTURAL CUTTING 505505CY
20
PARKING 44CY
21
CUTTING & FILLING (NON-EXEMPT GRADING)
22
CUTTING 468468CY
23
FILLING 1919CY
24
TOTAL EXPORT (WITH FLUFF FACTOR)
25
FILLING950CY35.0$33,250
26
Supprot Of Excavation
27
4x12 PT Lagging 248SF3.5$868
28
W14x38 Shoring Pile @ 7'-0" O.C. (5 EA)50FT75.0$3,750
29
Subtotal (Site Construction)$37,868
30
3Division 03 — Concrete
31
154'-6" Wide & 18" Deep Foundation Wall Footing Reinf. w/ #4, #5 & #6 Bars @ 16" O.C.15CY850.0$12,557
32
166'-9" Wide & 18" Deep Foundation Wall Footing Reinf. w/ #4, #5 & #6 Bars @ 16" O.C.6CY850.0$5,274
33
1710" Thick Foundation wall (10' high)30CY850.0$25,360
34
18Slab On Grade - (4" )6CY750.0$4,611
35
19Footing Pad of Pilaster Colunms (6 EA)5CY850.0$4,533
36
20Concrete for Exterior Stairs of Foundation19CY850.0$16,150
37
Foundation
38
212'-0" Wide & 18" High Footing Pad3CY850.0$2,934
39
223'-3" Wide & 18" High Fondation Footing4CY850.0$3,585
40
234'-6" Wide & 18" Deep Foundation Wall Footing Reinf. w/ #4, #5 & #6 Bars @ 16" O.C.4CY850.0$3,315
41
244'-6" Wide & 18" High Fondation Footing8CY850.0$7,144
42
Grid Beams
43
25CF-16 - 16"x18" Beam, Reinf. w/ #4 bars Top & Bot.15CY850.0$12,678
44
26GB-2.9 - 16" Wide and 24" Deep Reinf. w/ #6 Bars Top & Bot.1CY850.0$491
45
27GB-4 - 16"x24" Beam, Reinf. w/ #6 bars Top & Bot.1CY850.0$1,168
46
28GB-4.6 - 16"x24" Beam, Reinf. w/ #6 bars Top & Bot.0CY850.0$425
47
29GB-4.8 - 16"x24" Beam, Reinf. w/ #6 bars Top & Bot.1CY850.0$940
48
30GB-5 - 16"x24" Beam, Reinf. w/ #6 bars Top & Bot.3CY850.0$2,758
49
31PF-20 - 2'-0"X2'-0"X24" Thick Reinf. w/ #4 Bars1CY850.0$1,259
50
32PF-26 - 2'-6"X2'-6"X24" Thick Reinf. w/ #4 Bars1CY850.0$1,181
51
33PF-30 - 3'-0"X3'-0"X24" Thick Reinf. w/ #4 Bars1CY850.0$1,133
52
34PF-SSW - 34"X60"X24" Thick, Reinf. w/ #4 bars @ Ew.1CY850.0$892
53
355" Thick Concrete Slab on Grade Reinf. w/ #4 Bars @ 16" O.C. EW - 4" of 1/2" Crush-Run Base - 10 Mil. Vapor Barrier25CY750.0$18,811
54
Subtotal ( Concrete)$127,199
55
56
5Division 05 — Metals
57
36Sloped Simpson HU Hangers3EA4.0$12
58
37Simpson HL333EA4.0$12
59
3816" SQ Plaster6EA3.0$18
60
Used in Columns
61
39MST48 for 4x410EA4.4$44
62
40HDU2 for 4X4 1EA4.4$4
63
41MST48 for 4x610EA5.6$56
64
42HDU2 for 4X6 6EA5.6$33
65
43HDU5 for 4X6 9EA5.6$50
66
44MST48 for 6x68EA6.7$53
67
45HDU11 for 6X6 4EA6.7$27
68
46HDU2 for 6X6 30EA6.7$200
69
47HDU5 for 6X6 22EA6.7$147
70
48HDU8 for 6X6 7EA6.7$47
71
49HSS 10X3X3/144FT3.3$13
72
50HSS 10X3X3/16 Stringer Up24FT3.3$79
73
51HSS 3x4x1/41EA3.9$4
74
52HSS 3x4x1/41EA3.9$4
75
53HSS 4x4x1/4"2EA4.4$9
76
54HSS 6x6x1/214EA6.7$93
77
55HSS 7x7x1/220EA7.8$156
78
56HSS 7x7x3/84EA7.8$31
79
Headers & Beams
80
57FB-6 - W10x2613FT55.0$706
81
58FB-7 - W10x2623FT55.0$1,248
82
59FB-9 - W10x2623FT55.0$1,271
83
60FB-13 - W10x2616FT55.0$898
84
61FB-16 - W10x26 Cant.16FT55.0$865
85
62FB-17 - W10x2616FT55.0$900
86
63Simpson Straps - Mst60 Min.25EA5.0$125
87
Subtotal (Metals).$7,104
88
89
6Division 06 — Wood and Plastics
90
64Foundation Framing -
- 3/4" Struct 1 ply on 11-7/8" TJI 360 @16" O.C.
496SQ FT3.5$1,735
91
65 11-7/8" TJI 360 @16" O.C. 370FT6.0$2,220
92
Floor Framing$0
93
663/4" Struct 1 ply1442SQ FT3.5$5,047
94
6711-7/8" TJI 360 @16" O.C.1023FT6.0$6,138
95
68Green Roof Sheathing: 3/4" Struct 1 ply479SQ FT5.0$2,394
96
6914" TJI 560 @16" O.C.340FT7.0$2,382
97
Joists
98
70Roof Sheathing on 2x12 RJ's @ 16" O.C.2031SQ FT5.0$10,155
99
712x12 RJ's @ 16" O.C.1810FT7.0$12,670
100
Columns (HEIGHT 10')
101
724x41EA80.0$80