Op. NumbersTypeProcess DescriptionTransformMan-Minutes per unitMachine Minutes per unitProcess YieldMaterial CostRolled YieldStartsOuts per ShiftYielded Out per ShiftCapital Equipment CostEquip1Equip2Equip3Work1Work2Work3Work4Work5Work6Exp1Exp2Exp3Consume1Consume2Consume3Consume4Consume5
2
10KitObtain Materials for 5 assembliesNone100100% $ - 75%1.334864 $ - To and From StockroomRequisition formAlumina SubstrateAdhesiveLaser Cut Polyfilm MaskSurfactant Di-H20Class 100 gloves
3
20PrepMeasure Components & Mix SolutionComponent combined to create cleaning solution100100% $ 5 75%1.334864Substrate Holders (ceramic)Measure SolutionsArrange in work stationMove substrates to holder1000 ml BeakerGraduated CylinderSurfactant Di-H20Class 100 gloves
4
30CleanClean SubstrateSurfacant cleaning to eliminate gross contamination510100% $ - 75%1.334864 $ 10,000 Ultrasonic Cleaner (50°C, Set at 10)Radiant Heater w/ airflow (80°C)Substrate Holders (ceramic)Transfer Solution to US CleanerPlace holder in solution (5 mins) Remove holderMove to oven
(5 mins)
Remove from oven
Substates cool to 20CCleanroon WipesClass 100 gloves
5
40CleanPlasma Clean SubstratesPlasma cleaning to eliminate molecular and oxides210100% $ 5 75%1.334864 $ 15,000 Plasma Cleaner, 250WSubstrate Holders (ceramic)Load Plasma : Substrates in holder Close chamber and pump downSet power (250W)Set Time
(10 mins). Start ccyle
Unload PlasmaSubstates cool to 20CGas O2
99.99%
Class 100 gloves
6
50PrepPosition substrate and polyfilm maskEnsure placement and alignment before assembly55100% $ 200 75%1.3396127 $ 3,000 Film to Substrate align fixtureVacuum PumpSubstrate Holders (ceramic)Align substrate on fixtureTurn on Substrate vacuumAlign polyfilmTurn on polyfilm vacuumClose fixture and lockMove to laminator press stationClass 100 gloves
7
60AssemblyFilm LaminationLaminating to create premetalized substrate21098% $ 50 75%1.334864 $ 20,000 Precision Laminator (120°C)Substrate Holders (ceramic)Set process temperatureSet process pressure (40 psi)Load alignm tool still under vacuumActivate pressLoad alignm tool still under vacuumTurn align tool vacuum offClass 100 gloves
8
70Polymer DespositionDispenser specialty adhesiveLow Frequency IR Absorber from substrate & adhesive 215100% $ 75 77%1.303242 $ 20,000 Robotic Adhesive DispenserSubstrate Holders (ceramic)Load syringe with adhesiveRun calibration and set-upLoad substrate holderRun programUnload substrate holderSpecialty Adhesive with Filler2 mm sysringe 20 ml syringe20 ml plunger
9
80CureCure specialty adhesiveCuring creates final absorber212098% $ - 77%1.3045 $ 5,000 HEPA Radiant System (210°C)Substrate Holders (ceramic)Set oven and stabilizeLoad substrate holderClose oven Run programUnload substrate holderClass 100 gloves
10
90QA / TestThickness and Final TestAssure final product meeting thickness and performance5580% $ - 78%1.2896122 $ 20,000 White Light Profilometer Customer Spec'd Final TestThickness: Load substrateRun LabView ProgramThickness: Unload substrateFinal Test: Load SubstrateRun Final Test
Final Test: Unload Substrate
11
100DicingThickness and Final TestAssure final product meeting thickness and performance5598% $ - 98%1.029698 $ 20,000 White Light Profilometer Customer Spec'd Final TestThickness: Load substrateRun LabView ProgramThickness: Unload substrateFinal Test: Load SubstrateRun Final Test
Final Test: Unload Substrate
12
Total Man Minutes
48
Sum of Man Minutes
13
Total Machine Minutes
180
Sum of Machine Minutes
14
Rolled Yield
75%
Product of Op10 * Op20…
15
Yielded Starts
1.33
1/Rolled Yield
16
Yielded Man Minutes
64
Total Man Minutes * Yielded Starts
17
Yielded Machine Minutes
239
Total Machine Minutes * Yielded Starts
18
Units per Substrate
50
Constant base on Substrate Size
19
Labor Cost per Hour
$45.00
Constant based on average labor rate
20
Labor Cost per Processed Substrate
$36.00
Labor Cost * Total Man Minutes
21
Standard Cost per Processed Substrate
$371.00
Sum of Material Cost
22
Standard Cost per Unit
$7.42
Standard Cost per Processed Substrate / Units per Substrate
23
Yielded Cost per Processed Substrate
$492.73
Standard Cost per Unit * Yielded Starts
24
Yielded Cost per Unit
$9.85
Yielded Cost per Processed Substrate / Unites per Substrate
25
Hour Per Shift
8
Constant based operations (not considering productivity, utilization, or efficiency)
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100