7
DIV.02SITE WORKS $ -
8
9
1Proposed 12" Drop Concrete Curb 1,216 10% 1,338 lf $ -
10
26" Thick Concrete Pad 4500 PSI (for Loading Zone) 1,375 10% 1,513 sf $ -
11
3Asphaltic Concrete Pavement (Light Duty) 102,336 0% 102,336 sf $ -
12
44" Thick Concrete Sidewalk (Class A Concrete 4000 PSI w/6" thick 3/4" crushed stone base above approved subgrade) 9,215 10% 10,137 sf $ -
13
56' High Wood Stockade Fence 45 10% 50 lf $ -
14
6Excavation 180 10% 198 cy $ -
15
16
17
SUB TOTAL
$ - $ -
18
OVERHEAD & PROFIT (25%)
25% $ - $ -
19
TOTAL BID
$ - $ -
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100