1 | 3/27/24 West Rim at Greg Foster post heading toward West Rim Loop | 8" dia tree across trail and then further down, another 8" tree across trail | Denny & Nydia Pistoll | ||||||||||||||||||||||||||||||
2 | |||||||||||||||||||||||||||||||||
3 | Timestamp | Which Trail? | Type | Your Name | Report Date | I got this! Add your name. | Paste link to pic/location of problem | Email Address | Which Trail? | Completion Date | Completion Comments | Hours to complete task | |||||||||||||||||||||
4 | 1/12/2024 10:12:50 | Cloudland Connector (Hwy 157 to Ascalon) | Bridge | Bridges - The the bridge about 10 minutes down CCT from 157 has that slick, algae coating that plagues our bridges. Not so worrisome on the flat part, but the inclined part on the south end could cause a fall. Maybe we should install some of that plaster lathing we’ve used elsewhere. | Charles Mahan | 1/11 | |||||||||||||||||||||||||||
5 | 9/9/2023 15:00:31 | Shale Flats | Bridge | Bridges - From 5 Points to Shale Flats, 1st wooden bridge still has a broken rotted board. Bridge replacement scheduled for college group Mar 2024. | Nydia and Denny Pistoll | 9/9 | |||||||||||||||||||||||||||
6 | 3/23/2020 9:40:45 | Tailings Run | Bridge | Bridge - Big problem developing just a few hundred yards north of 5 points parking lot. A mine shaft is collapsing and tailings run trail is collapsing into the shaft. Greg and I cut a tree on 3/22 that had partially collapsed into this hole. Until we know more about where the area will collapse, it will be hard to determine where to re-route the trail - or possibly eventually a bridge over the collapsed portion. Feb 2024 - hole does not appear to be any worse. Gary proposes we stabilize the trail bed from collapse by creating a stabilizing wall with T-posts and 2x lumber. Filling the hole is not practical. | Bob Venable | 3/22 | |||||||||||||||||||||||||||
7 | 12/17/2024 | Back Country Trail | Chainsaw | Large tree down, betweeen camp sites 1 & 2 | Jerry Wallace | 12-17-24 | |||||||||||||||||||||||||||
8 | CCT2 (Hwy 157 to Ascalon) | Chainsaw | Chainsaw - tree 100 ft from check pt 24 | ||||||||||||||||||||||||||||||
9 | 2/3/2024 0:00:00 | Checkpoint 27 S Hogsback | Chainsaw | Chainsaw - 3" tree overhanging beginning of the trail and would impact a biker | Nydia and Denny Pistoll | ||||||||||||||||||||||||||||
10 | 2/15/2024 20:13:33 | Cloudland Connector (Hwy 189 to Park) | Chainsaw | From the start of the CCT.. walk 15 to 20 minutes (about 10 minutes past the first intersect) (going towards Hwy 189) 1 tree across CCT there. | Judy Johannes | 2/15 | |||||||||||||||||||||||||||
11 | 2/3/2024 21:10:28 | Hogsback South | Chainsaw | Chainsaw - At checkpoint 27 on the CCT, at the beginning of S. Hogsback, 3" tree limb hanging over the trail and would hit a biker in the head. | Nydia Pistoll and Denny Pistoll | 2/3 | |||||||||||||||||||||||||||
12 | Atlatl | Maintenance | Maintenance - Two minor wet places (2nd leg of AtlAtl) | ||||||||||||||||||||||||||||||
13 | Atlatl | Maintenance | Maintenance - Narrow in places w/ 2 minor wet spots. (1st leg of AtlAtl) | ||||||||||||||||||||||||||||||
14 | 1/14/2022 10:29:10 | Can’t Hardly' Hike-Only Trail | Maintenance | Maintenance - Trail blaze down on south end of trail at junction with CCT. Tree fell down. Needs a simple relocation to another tree. | Gary Holsted | 1/13 | |||||||||||||||||||||||||||
15 | 4/9/2018 16:13:48 | CCT2 (Hwy 157 to Ascalon) | Maintenance | Maintenance - There are a few drainage issues on Ascalon end of trail that need addressed. Ongoing maintenance issue. | Greg Foster | 4/9 | athruhiker2006@yahoo.com | ||||||||||||||||||||||||||
16 | 6/12/2020 8:58:03 | CCT2 (Hwy 157 to Ascalon) | Maintenance | Maintenance - CCT at the convergence of Shale Flat & N Hogs Back, 2 large muddy wet bike rutted places approx. 10' areas as well as other rutted wet areas continuing along the CCT towards Ascalon. | Nydia and Denny Pistoll | 6/11 | |||||||||||||||||||||||||||
17 | 11/27/2020 12:33:30 | CCT2 (Hwy 157 to Ascalon) | Maintenance | Maintenance - Low spot/depression on trail and filled with water, pretty muddy in pool. Need to set up a drain area on the side so pool/path so does not fill with water after rains. Close to #3 above. | David Bechler | 11/23 | |||||||||||||||||||||||||||
18 | 11/27/2020 12:33:30 | CCT2 (Hwy 157 to Ascalon) | Maintenance | Maintenance - Metal drain pipe diagonally crossing trail on a fairly sloped area of the trail. About 0.3-0.4 miles from Ascalon parking area. Problem here is that erosion has uncovered the pipe so it projects above the surface of the path by about 4-5”. I tested it and it is quite slippery. Mountain bikers or hikers could take a bad spill as they cross this spot if they make contact with the metal pipe. It is right near Check Point 27 and a quick easy walk from parking lot. | David Bechler | 11/23 | |||||||||||||||||||||||||||
19 | 9/13/2021 11:46:35 | CCT2 (Hwy 157 to Ascalon) | Maintenance | Maintenance - From Five Points on the CCT to the Caprock Cut Through, at least 4 wet rutted spots made by bikes-one is especially deep | Nydia Pistoll | 9/13 | |||||||||||||||||||||||||||
20 | 1/1/2022 16:01:39 | CCT2 (Hwy 157 to Ascalon) | Maintenance | Maintenance - Large ruts and damage at 5 points due to mtn bikers riding wet trails | Mindy Haworth | 1/1 | |||||||||||||||||||||||||||
21 | 11/11/2022 0:00:00 | CCT2 (Hwy 157 to Ascalon) | Maintenance | Maintenance - Needs deberming in the usual spots and the big ditch feeding into the culvert in the sharp bend needs cleaning out. The steep stretch just south of the culvert is steep and eroding. Needs a workday to build water diversions | Charles Mahan | 11/11 | |||||||||||||||||||||||||||
22 | CCT2 (Hwy 157 to Ascalon) | Maintenance | Maintenance - There are several spots along the trail where water stands and where erosion is happening and we need to do a workday to fix those spots. | Charles Mahan | 7/21 | ||||||||||||||||||||||||||||
23 | 3/22/2022 11:36:00 | CCT3 (Ascalon to Hwy 189) | Maintenance | Maintenance - bad washed out steep downhill section 1/8 mi in from 189 Narrow in places w/ 2 minor wet spots. (1st leg of AtlAtl) Two minor wet places (2nd leg of AtlAtl) Washed out rocky section of CCT just before bridge. As to CCT, couple or three culverts are in process of being washed out. In addition to the above special needs, several areas are needing routine maintenance.. IE, drains cleaned or reconstructed, berm removal, rolling grade dips installed, etc. Sent photos via text msg toto Trail Committee members. | Greg Foster | 3/21 | |||||||||||||||||||||||||||
24 | 2/10/2023 0:00:00 | CCT3 (Ascalon to Hwy 189) | Maintenance | Maintenance - Inside the park proper on the CCT there are two culverts that are in dogleg turns. The dirt covering those tiles is eroding pretty rapidly. The dirt is Chirt and I have no idea where it came from but shirt has help up really well thus far. I cannot imagine that it was hauled in. It must exist on-sight at a few feet down. We may be able to dig some powwow pits and use some highly compatible soil that way, This need attention, and it’s relatively easy. | Mike Pollock | ||||||||||||||||||||||||||||
25 | 2/10/2023 0:00:00 | CCT3 (Ascalon to Hwy 189) | Maintenance | Maintenance - From the major junction on coal mine road (which is also the CCT) down to the bear creek bridge, there are about 5-7 large drains that need to be opened and drainage corrected. We talked about this with Brad several years ago about using a park machine but I think these drains could be re-worked by hand without too much problem. This one may allow us to get small teams working on the same issue in a centralized area - it may take 1/2 to 3/4 day and it will be a fair amount of digging. And we could also do some root work below the junction of Barkeeper/Can’t hardly - basically cutting out some of the exposed roots. ISU - Maintenance - Trail north of Bear Creek bridge to intersection with "old coal mine road" needs drainages opened starting at the top. Drains exit trail to the SW at angles. Debris is causing CCT to act like a creek. All material pulled should come back into the trail. | Mike Pollock | ||||||||||||||||||||||||||||
26 | 2/10/2023 0:00:00 | CCT3 (Ascalon to Hwy 189) | Maintenance | Maintenance - There is another exposed tile on the CCT heading northeast towards the bear creek bridge, again in a dog leg turn, It too could use the same treatment, | Mike Pollock | ||||||||||||||||||||||||||||
27 | CCT3 (Ascalon to Hwy 189) | Maintenance | Maintenance - Washed out rocky section of CCT just before bridge | ||||||||||||||||||||||||||||||
28 | 2/20/2022 10:32:11 | CCT4 (Hwy 189 to Park) | Maintenance | Maintenance - From checkpoint 14 to checkpoint 15, 2 waterlogged areas with standing water. Needs rerouting of drainage to keep water from pooling on trail | Nydia Pistoll and Judy Johannes | 2/19 | |||||||||||||||||||||||||||
29 | 5/20/2022 15:15:17 | CCT4 (Hwy 189 to Park) | Maintenance | Maintenance - CCT and Prince Albert 10 minute walk from that point heading into the park, culvert dirt has eroded and could cause a bike to go into it. This is not at the trail head area of CCT and Prince Albert but up further on the CCT trail. | Nydia Pistoll and Judy Johannes | 5/20 | |||||||||||||||||||||||||||
30 | Ketttle Bottom | Maintenance | Drains need cleaned | Bob Venable | |||||||||||||||||||||||||||||
31 | 12/24/2018 22:19:13 | Sitton’s Gulch Trail (Segment 2-Blue Hole to bridge) | Maintenance | Maintenance - Culvert has experienced high water and washed the gravel away. Added geo-fabric and gravel to stabilize. Fabric installed by ISU volunteers and one load of gravel March 2019. Another in late summer 2019. Need probably two more loads. | Gary Holsted | 12/24 | gary@cloudlandcanyon.org | ||||||||||||||||||||||||||
32 | 7/27/2020 17:56:35 | Walk-In Campground Trail | Maintenance | Maintenance - Rope hanging down from a tree between campsite 11 and 12 (Transferred from Check-In by G Holsted 8/24/20) | George and Marcy Williams | 7/27 | |||||||||||||||||||||||||||
33 | 8/29/2018 11:24:22 | Waterfalls Trail | Maintenance | Maintenance - Continued erosion from CP 6 toward Hemlock Falls at first stairs landing & approximately 44 yards from main trail toward Hemlock falls. Also, the amount of trash is becoming rather unsightly. Suggest 2 - 3 volunteers with rope and harness. -Added from check-in form by G Holsted 9/9/18 | Scott Anderson | 8/29 | |||||||||||||||||||||||||||
34 | 7/5/2021 21:32:20 | Waterfalls Trail | Maintenance | Maintenance - The big sign for Cherokee falls and hemlock says the falls are opposite or the little signs on the 4x4 post | Jacob Turpin | 7/5 | |||||||||||||||||||||||||||
35 | West Rim Connector | Maintenance | Fix two step-downs | Bob Venable | |||||||||||||||||||||||||||||
36 | West Rim Connector | Maintenance | Fix trail base | Bob Venable | |||||||||||||||||||||||||||||
37 | 2/10/2023 0:00:00 | West Rim Trail (Segment 2-Loop) | Maintenance | Maintenance - The re-route has been re-opened. So we need to close it again from both ends. Or just add steps to the closed portion so it is usable again from that overlook. | Bob Venable | ||||||||||||||||||||||||||||
38 | 5/22/2023 21:58:19 | West Rim Trail (Segment 2-Loop) | Maintenance | The steps going up the hill from White Oak Branch bridge need some TLC. One new step put in and some rock armoring on the right where people have started walking. | Greg Foster | 5/22 | |||||||||||||||||||||||||||
39 | 5/22/2023 21:59:34 | West Rim Trail (Segment 2-Loop) | Maintenance | The Plexiglas on the sign in same area is broken and we are in need of a new more easy to read map. Kiosk at checkpoint WR03? | Greg Foster | 5/22 | |||||||||||||||||||||||||||
40 | 5/22/2023 22:02:54 | West Rim Trail (Segment 2-Loop) | Maintenance | The rock steps going down to the Trenton overlook have once again eroded tremendously. Truthfully, we probably need to use rocks and mortar to build steps like on the first portion of that section. | Greg Foster | 5/22 | |||||||||||||||||||||||||||
41 | 5/22/2023 22:04:43 | West Rim Trail (Segment 2-Loop) | Maintenance | Need to close off some of the previously closed trails and put up signage. | Greg Foster | 5/22 | |||||||||||||||||||||||||||
42 | 2/10/2023 0:00:00 | West Rim Trail (Segment 2-Loop) | Maintenance | Maintenance - several places on west rim loop - near where we re-routed the trail a few years ago. | Bob Venable | ||||||||||||||||||||||||||||
43 | 9/2/2021 15:16:55 | Back Country Trail | Signage | Signage - One trail marker tree down at the meeting point of the circle beginning (going in it was the trail to the right) we move it off to the side. SPLIT | Lisa Arnold | 9/2 | |||||||||||||||||||||||||||
44 | 3/28/2024 16:01:10 | West Rim Trail (Segment 1) | 2 8" trees down from Greg Foster Post heading towards West Rim Loop | Denny and Nydia Pistoll | 3/27 | ||||||||||||||||||||||||||||
45 | 3/30/2024 11:47:47 | Cloudland Connector (Hwy 157 to Ascalon) | Nydia and Denny Pistoll | 100 yds S on CCT from Check point 30 multi branches on 2 trunks down and crossing trail | 3/30 | ||||||||||||||||||||||||||||
46 | 3/30/2024 11:52:06 | West Rim Trail (Segment 1) | Nydia & Denny Pistoll | On West Rim at Greg Foster Post, 8" dia tree down and further towards West Rim Loop. 8" dia tree down | 3/27 | ||||||||||||||||||||||||||||
47 | 4/15/2024 11:11:10 | 8"dia tree down 15 minutes from either trail head | Nydia Pistoll and Judy Johannes | 4/14 | Pathkiller | ||||||||||||||||||||||||||||
48 | 4/15/2024 11:13:10 | 10" dia tree down 30 minutes from where CCT meets Prince Albert at upper part of CCT | Nydia Pistoll & Judy Johannes | 4/14 | Cloudland Connector (Hwy 189 to Park) | ||||||||||||||||||||||||||||
49 | 5/1/2024 11:55:38 | Waterfalls Trail | |||||||||||||||||||||||||||||||
50 | 2/10/2023 0:00:00 | CCT2 (Hwy 157 to Ascalon) | Signage | Signage - The cedar signs in 5 Points and Ascalon all need some TLC if they hold any value these days. | Mike Pollock | ||||||||||||||||||||||||||||
51 | 7/6/2023 0:00:00 | Prince Albert | Signage | Judy Johannes has volunteered to help blaze the trails at Prince Albert, etc. We need to help her with this task. Added by G Holsted 7/6/23 | Gary Holsted | 7/6 | |||||||||||||||||||||||||||
52 | |||||||||||||||||||||||||||||||||
53 | |||||||||||||||||||||||||||||||||
54 | |||||||||||||||||||||||||||||||||
55 | |||||||||||||||||||||||||||||||||
56 | |||||||||||||||||||||||||||||||||
57 | |||||||||||||||||||||||||||||||||
58 | |||||||||||||||||||||||||||||||||
59 | |||||||||||||||||||||||||||||||||
60 | |||||||||||||||||||||||||||||||||
61 | |||||||||||||||||||||||||||||||||
62 | |||||||||||||||||||||||||||||||||
63 | |||||||||||||||||||||||||||||||||
64 | |||||||||||||||||||||||||||||||||
65 | |||||||||||||||||||||||||||||||||
66 | |||||||||||||||||||||||||||||||||
67 | |||||||||||||||||||||||||||||||||
68 | |||||||||||||||||||||||||||||||||
69 | |||||||||||||||||||||||||||||||||
70 | |||||||||||||||||||||||||||||||||
71 | |||||||||||||||||||||||||||||||||
72 | |||||||||||||||||||||||||||||||||
73 | |||||||||||||||||||||||||||||||||
74 | |||||||||||||||||||||||||||||||||
75 | |||||||||||||||||||||||||||||||||
76 | |||||||||||||||||||||||||||||||||
77 | |||||||||||||||||||||||||||||||||
78 | |||||||||||||||||||||||||||||||||
79 | |||||||||||||||||||||||||||||||||
80 | |||||||||||||||||||||||||||||||||
81 | |||||||||||||||||||||||||||||||||
82 | |||||||||||||||||||||||||||||||||
83 | |||||||||||||||||||||||||||||||||
84 | |||||||||||||||||||||||||||||||||
85 | |||||||||||||||||||||||||||||||||
86 | |||||||||||||||||||||||||||||||||
87 | |||||||||||||||||||||||||||||||||
88 | |||||||||||||||||||||||||||||||||
89 | |||||||||||||||||||||||||||||||||
90 | |||||||||||||||||||||||||||||||||
91 | |||||||||||||||||||||||||||||||||
92 | |||||||||||||||||||||||||||||||||
93 | |||||||||||||||||||||||||||||||||
94 | |||||||||||||||||||||||||||||||||
95 | |||||||||||||||||||||||||||||||||
96 | |||||||||||||||||||||||||||||||||
97 | |||||||||||||||||||||||||||||||||
98 | |||||||||||||||||||||||||||||||||
99 | |||||||||||||||||||||||||||||||||
100 |