Trail Problem / Check-In Sheet
 Share
The version of the browser you are using is no longer supported. Please upgrade to a supported browser.Dismiss

 
$
%
123
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ABCDEFGHIJKLMNOPQRSTUVWXYZAAABACAD
1
Trail Problem SheetCompleted items will be moved to "Problem History" tab.
2
3
TimestampSelect the trail nameYour NameReport DateI got this! Add your name.Paste link to pic/location of problemEmail AddressCompletion DateCompletion CommentsHours to complete task
4
7/17Backcountry Trail1) There is a few flat wet muddy area walking in past campsite 1 that we think could use a rock path along with brush to direct walkers over the rocks. A second opinion would be great.
2) Some trail berm edges need to be raked to direct water (we can do that within the next 3 weeks).
3) The bridges need to be swept/blown (particularly near campsite 5). Water flow needs to be directed approaching bridges (we can do that within the next 3 weeks).
4) Trail corridor needs to be trimmed a bit climbing up out of low area (we can do that within the next 3 weeks).
5) Three trees should be cut or trimmed. The first is before post 13 and the other two are between campsites 5 and 6. None are "on" the trail, but rather have fallen with branches blocking head level. We particularly need help with the chain saw work

Info added to "Check-In" and transferred here by G Holsted 7/17/18
Dane
5
4/27/2018 22:29:01Cloudland Connector (Ascalon to Hwy 189)Mud bog - small spring pouring across trail creating a mess - users have piled timber in mud - need more substantial solution
(Same problem identified by Anne on 3/31/18)
Gary4/22Photogary@cloudlandcanyon.orgGaia
6
8/15/2018 7:47:43Cloudland Connector (Ascalon to Hwy 189)Trail north of BC bridge to intersection with "old coal mine road" needs drainages opened starting at the top. Drains exit trail to the SW at angles. Debris is causing CCT to act like a creek. All material pulled should come back into the trail. THXMike8/12Mike.pollock@mac.com
7
4/9/2018 16:13:48Cloudland Connector (Hwy 157 to Ascalon)There are a few drainage issues on Ascalon end of trail that need addressed. Greg F4/9athruhiker2006@yahoo.com
8
7/3/2018 9:09:13Overlook Trailabout 30 feet of trail needs slight re-route through two root balls - edited based on Bob's commentsdeb tucker7/2/18All Trailsdebandcharlie@yahoo.comupdate from bob venable - the trees have been cut by park staff and me, but about 30 feet of trail needs slight re-route through two root balls. This will be a great saturday work day project.
9
8/15/2018 7:43:31Poor Pony8" Tree down. Small chain saw or hand saw with wedges. Mike P8/12mike.pollock@mac.com
10
8/17/2018 22:07:05Poor PonyTree across per pony spur to kindergarten near Check point 22Larry Jablonski8/17jabo19522@msn.com
11
8/17/2018 22:10:03BarkeaterTree across Barkeater spur to Kindergarten very close to Checkpoint 36 Larry Jablonski8/18jabo19522@msn.com
12
8/17/2018 22:19:55BarkeaterTrees down on barkeeper spur to kindergarten close to Checkpoint 36Larry Jablonski8/18jabo19522@msn.com
13
4/19/2018 9:45:33West Rim Loop TrailNear future small project needs are
1. leaner tree needs to come down, need come-along. Has the FOCCSP bought one yet?
2. Need to add Overlook out and back signs one place ( will coordinate with Larry the Sign Guy )
3. Tree needs moved near powerline overlook
4. Misc Tread repair / Corridor clearing
5. Bridge over White Oak Creek needs to be anchored to ground.
Greg F4/19/18All Trails
14
8/15/18Catfish Pond Access TrailMawee & Pawee report a blowdown on the trail that needs to be removed.

Per Mawee & Pawee: "need to first have that big, overhanging blowdown cut away...there was caution tape someone had put there for a while....then it was removed....but the tree is still dangerously hanging over the path to the pond...wondering if we could ask for some help from our wonderful sawyers in getting that path clear again"
Gary Holsted8/15/18
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Loading...
 
 
 
Problem Reporting
Problem History
AAT Check-In
Check-In Summary
Project List
Trail Listing
Column Headings
 
 
Main menu