T&C Requirement Compliance Sheet
2
Sr. No.Test DescriptionFATSAT
3
Plumbing
4
1Physical inspection and specs. Verification - This has to be carried out as per the Pre-Cx check sheet given in the commissioning plan/method statement.
5
2Plumbing piping pressure test - Piping pressure test to be conducted at 1.5 times
of working pressure for 24 hrs. and recorded as per the checklist.
6
3Piping leakage test- Hold the water in the drainpipes for a period of 24 hours.
7
4Pipe slope test Conduct a slope test for drain pipes
8
5Geyser Operation verification
9
6Functional Testing of pump
10
7Solenoid operation & integration with WLD system
11
8Solenoid operation & integration with Irrigation system
12
NOTE: Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT)
13
14
Test Instrumentation Required/Considered For SAT
15
Sr. No.DescriptionQty.
16
1True RMS Multi-meter1 No.
17
2True RMS Clamp meter1 No.
18
3Pressure gauges2 Nos.
19
4Pressure testing kit1 No.
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100