IMPACT Kerala Ltd - RKI Works (Awarded)
2
3
Sl NoProject LocationFund sourceAS Amt (in Rs. Cr. incl GST)Awarded Value (in Rs. Cr. incl GST)Awarded toPhysical progress (%)Financial Progress (%)Status as on 31.07.2026
4
1250 KLD Cherthala FSTPRKI8.287.74IONEX100%96%Work completed, O&M agreement signed between Local Body and Contractor. Trial run kept on hold due to sludge management issues, the contracor has done modifications and the plant resumed trial run.
5
250 KLD FSTP at Varkala MunicipalityRKI4.833.11Enrec100%72%FSTP plant work completed, O&M agreement signed between Local Body and Contractor. Leak test completed, trial run in progress. Power connection pending to be arranged by Local Body. Truck purchase from GEM portal pending. Project kept by Local Body.
6
3590 KLD STP at 3 Tsunami Flats, Mayyanad GP (160 KLD at Dhavalakuzhy; 270 KLD at Thanni; and 160 KLD at Valiyavila)RKI12.0911.27Pollucon95%54%Thanni: STP work completed. Preparation for testing and commissioning in progress. Household connection work in progress. Treated water disposal location for Thanni STP needs to be finalized by local body
Dhavalakuzhy: STP work completed. Preparation for testing and commissioning in progress. Household connection work in progress. Treated water disposal line work completed.
Valiyavila: STP work completed except raw sewage tank. Preparation for testing and commissioning in progress. Household connection work in progress. Treated water disposal line work completed.
7
Total25.2022.12
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100