1 | RENCANA ANGGARAN BIAYA – RENOVASI FASE 1 | |||||||||||||||||||||||||
2 | Lokasi: Gebang Lor, Surabaya | Sumber HSPK: HSPK ITS 2024 (E_3A) | Tahun: 2024 | |||||||||||||||||||||||||
3 | ||||||||||||||||||||||||||
4 | No | Uraian Pekerjaan | Sat | Vol | Harga Satuan (Rp) | Jumlah Harga (Rp) | Referensi / Catatan | |||||||||||||||||||
5 | I. PEKERJAAN PENJOROKAN TEMBOK AREA JEMURAN (3,5 × 2,4 m, masuk 1,3 m) | |||||||||||||||||||||||||
6 | 1.1 | Pembongkaran Dinding Tembok dan Pembersihan (t=15cm, luas 3,5×2,4 m) | M³ | 1,26 | 81.325 | 102.470 | HSPK ITS 2024 – D.1 item 1.7 | |||||||||||||||||||
7 | 1.2 | Pemasangan Bata Merah 1Pc:5Pp Tebal ½ Bata – dinding baru (sisi samping 2×(1,3×2,4) + muka baru) | M² | 14,52 | 155.030 | 2.251.036 | HSPK ITS 2024 – D.1 item 1.9 | |||||||||||||||||||
8 | 1.3 | Plesteran Halus 1Pc:5Ps t=1,5cm – kedua sisi dinding baru (14,52×2) | M² | 29,04 | 76.644 | 2.225.742 | HSPK ITS 2024 – D.1 item 1.1 | |||||||||||||||||||
9 | 1.4 | Acian dinding baru | M² | 29,04 | 43.481 | 1.262.688 | HSPK ITS 2024 – D.1 item 1.19 | |||||||||||||||||||
10 | 1.5 | Pengecatan Dinding Dalam Baru (2 lapis) | M² | 29,04 | 46.114 | 1.339.151 | HSPK ITS 2024 – D.2 item 2.7 | |||||||||||||||||||
11 | 1.6 | Pemasangan Pagar Pembatas / Railing Besi Hollow (area terbuka depan, L=3,5m, t=1,2m) | M² | 4,20 | 350.000 | 1.470.000 | Estimasi pasar 2024 – pagar hollow galvanis | |||||||||||||||||||
12 | 1.7 | Pasangan Lantai Keramik Outdoor 40×40 cm (area jemuran 3,5×1,3 m) | M² | 4,55 | 168.850 | 768.268 | HSPK ITS 2024 – E item 6 | |||||||||||||||||||
13 | 1.8 | Pengangkutan puing/sisa bongkar (estimasi) | Ls | 1,00 | 500.000 | 500.000 | Harga pasar | |||||||||||||||||||
14 | Sub Total Pekerjaan I | 9.919.353 | ||||||||||||||||||||||||
15 | ||||||||||||||||||||||||||
16 | II. PEKERJAAN VENTILASI UDARA (2,2 m × 20 cm, 2 sisi – area dapur & area tembok baru) | |||||||||||||||||||||||||
17 | 2.1 | Pembongkaran Tembok untuk Bukaan Ventilasi (2 lubang @ 2,2×0,20 m) | M³ | 0,13 | 81.325 | 10.572 | HSPK ITS 2024 – D.1 item 1.7 | |||||||||||||||||||
18 | 2.2 | Pemasangan Roster/Ventilasi Bata Berongga Expose 1Pc:3Pp (2 baris × 2,2 m = 4,4 m per sisi × 2 sisi) | M² | 1,76 | 468.490 | 824.542 | HSPK ITS 2024 – D.1 item 1.17 | |||||||||||||||||||
19 | 2.3 | Plesteran dan Acian Pinggir Bukaan (lump sum) | Ls | 1,00 | 250.000 | 250.000 | Estimasi | |||||||||||||||||||
20 | Sub Total Pekerjaan II | 1.085.115 | ||||||||||||||||||||||||
21 | ||||||||||||||||||||||||||
22 | III. PEKERJAAN PENYATUAN KAMAR MANDI BELAKANG + FASILITAS LANSIA | |||||||||||||||||||||||||
23 | 3.1 | Pembongkaran Dinding Pemisah Antar KM (estimasi luas 2,5 m²) | M³ | 0,38 | 81.325 | 30.497 | HSPK ITS 2024 – D.1 item 1.7 | |||||||||||||||||||
24 | 3.2 | Pembongkaran Kloset Jongkok Lama & Instalasi Sanitair Lama (Ls) | Ls | 1,00 | 500.000 | 500.000 | Harga pasar | |||||||||||||||||||
25 | 3.3 | Pemasangan Kloset Duduk Porcelaine (TOTO / setara) | Buah | 1,00 | 218.700 | 218.700 | HSPK ITS 2024 – I item 6 | |||||||||||||||||||
26 | 3.4 | Pemasangan Wastafel (tanam/gantung) | Buah | 1,00 | 113.000 | 113.000 | HSPK ITS 2024 – I item 2 | |||||||||||||||||||
27 | 3.5 | Pemasangan Grab Bar / Pegangan Dinding Stainless (2 titik – WC & shower area) | Buah | 2,00 | 450.000 | 900.000 | Harga pasar – grab bar SS 304 600mm | |||||||||||||||||||
28 | 3.6 | Pemasangan Pipa PVC Type AW Ø3" (air buangan, ±3 m) | M | 3,00 | 100.519 | 301.557 | HSPK ITS 2024 – K item 10 | |||||||||||||||||||
29 | 3.7 | Pemasangan Pipa PVC Type AW ؽ" (air bersih, ±4 m) | M | 4,00 | 20.497 | 81.988 | HSPK ITS 2024 – K item 12 | |||||||||||||||||||
30 | 3.8 | Pemasangan Keramik Dinding KM 20×25 cm (±12 m²) | M² | 12,00 | 194.573 | 2.334.876 | HSPK ITS 2024 – D.2 item 2.12 | |||||||||||||||||||
31 | 3.9 | Pemasangan Keramik Lantai KM 30×30 cm anti-slip (±4 m²) | M² | 4,00 | 169.500 | 678.000 | HSPK ITS 2024 – E item 7 | |||||||||||||||||||
32 | 3.10 | Waterproofing Lantai KM | M² | 4,00 | 16.245 | 64.980 | HSPK ITS 2024 – D.2 item 2.16 | |||||||||||||||||||
33 | 3.11 | Pengecatan Dinding KM (plafon & area non-keramik) | M² | 6,00 | 46.114 | 276.684 | HSPK ITS 2024 – D.2 item 2.7 | |||||||||||||||||||
34 | 3.12 | Benangan 1Pc:3Ps (sudut & pinggiran keramik, ±10 m) | M | 10,00 | 26.233 | 262.330 | HSPK ITS 2024 – D.1 item 1.18 | |||||||||||||||||||
35 | Sub Total Pekerjaan III | 5.762.612 | ||||||||||||||||||||||||
36 | ||||||||||||||||||||||||||
37 | IV. PEKERJAAN PANTRY MINI LANTAI ATAS (beton dudukan kompor + wastafel) | |||||||||||||||||||||||||
38 | 4.1 | Pekerjaan Beton K-175 – Meja/Dudukan Kompor (0,6×0,5×0,1 m + rangka kecil) | M³ | 0,08 | 913.935 | 73.115 | HSPK ITS 2024 – C.1 item 1.5 | |||||||||||||||||||
39 | 4.2 | Pekerjaan Bekisting Meja Beton | M² | 0,60 | 492.778 | 295.667 | HSPK ITS 2024 – C.1 item 1.22 | |||||||||||||||||||
40 | 4.3 | Pekerjaan Pembesian Besi Beton (±8 kg) | Kg | 8,00 | 2.127 | 17.016 | HSPK ITS 2024 – C.1 item 1.17 | |||||||||||||||||||
41 | 4.4 | Pemasangan Wastafel mini (gantung) | Buah | 1,00 | 113.000 | 113.000 | HSPK ITS 2024 – I item 2 | |||||||||||||||||||
42 | 4.5 | Pemasangan Pipa PVC Type AW ؽ" – air bersih ke wastafel (±3 m) | M | 3,00 | 20.497 | 61.491 | HSPK ITS 2024 – K item 12 | |||||||||||||||||||
43 | 4.6 | Pemasangan Pipa PVC Type AW Ø2" – air buangan wastafel (±3 m) | M | 3,00 | 50.750 | 152.250 | HSPK ITS 2024 – K item 11 | |||||||||||||||||||
44 | 4.7 | Pemasangan Keramik Dinding Pantry 20×25 cm (backsplash ±2 m²) | M² | 2,00 | 194.573 | 389.146 | HSPK ITS 2024 – D.2 item 2.12 | |||||||||||||||||||
45 | 4.8 | Pengecatan Area Pantry – Dinding Baru | M² | 4,00 | 46.114 | 184.456 | HSPK ITS 2024 – D.2 item 2.7 | |||||||||||||||||||
46 | Sub Total Pekerjaan IV | 1.286.141 | ||||||||||||||||||||||||
47 | ||||||||||||||||||||||||||
48 | ||||||||||||||||||||||||||
49 | TOTAL FASE 1 (sebelum PPN) | 18.053.220 | ||||||||||||||||||||||||
50 | PPN 11% | 1.985.854 | ||||||||||||||||||||||||
51 | TOTAL FASE 1 (sudah PPN) | 20.039.075 | ||||||||||||||||||||||||
52 | ||||||||||||||||||||||||||
53 | ⚠ Catatan Fase 1: Harga satuan bersumber HSPK ITS 2024. Untuk item non-HSPK (grab bar, pagar, puing) menggunakan harga pasar Surabaya 2024. Sliding door lama digunakan kembali (tidak dihitung). Kontraktor disarankan minta 3 penawaran. | |||||||||||||||||||||||||
54 | ||||||||||||||||||||||||||
55 | ||||||||||||||||||||||||||
56 | ||||||||||||||||||||||||||
57 | ||||||||||||||||||||||||||
58 | ||||||||||||||||||||||||||
59 | ||||||||||||||||||||||||||
60 | ||||||||||||||||||||||||||
61 | ||||||||||||||||||||||||||
62 | ||||||||||||||||||||||||||
63 | ||||||||||||||||||||||||||
64 | ||||||||||||||||||||||||||
65 | ||||||||||||||||||||||||||
66 | ||||||||||||||||||||||||||
67 | ||||||||||||||||||||||||||
68 | ||||||||||||||||||||||||||
69 | ||||||||||||||||||||||||||
70 | ||||||||||||||||||||||||||
71 | ||||||||||||||||||||||||||
72 | ||||||||||||||||||||||||||
73 | ||||||||||||||||||||||||||
74 | ||||||||||||||||||||||||||
75 | ||||||||||||||||||||||||||
76 | ||||||||||||||||||||||||||
77 | ||||||||||||||||||||||||||
78 | ||||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||
100 | ||||||||||||||||||||||||||