Estimate of Materials Quantities and Cost of Construction
3
CLICK HERE TO GO BACK TO COST SUMMARY
4
Sub-Total
$ 598,833 Date:10/30/2024
5
Material Sales Tax8.260% $ 19,576 (Adjust the percentage for Material tax as required)Project:
6
Overhead & Profit / Inflation (Material)
10% $ 23,700 (Adjust the percentage for Overhead & Profit as required)
Project Location:
7
Overhead & Profit (Labor)
16% $ 57,893 (Adjust the percentage for Overhead & Profit as required)
Project and Wage Type:
Private (Non-Prevailing wage)
8
Bond Fee1.5% $ 10,500 (Adjust the percentage for Bond Fee as required)
9
Total Bid
$ 710,503
Gross Internal Area of Structure (SF)
10,105
10
Covered Area of Structure (SF)
10,105
11
Material Wastage 10% ( for Quantities in Each & LS)No. of Units
12
Material Wastage 25%
( for Quantities in LF, SF, SY, CY, LBS, TONS)
No. of Floors and Overall Height
3 (14'-8" H)
13
(Changing the wastage percentage here will update the wastage for whole tab)
Hardscaping Area (SF)
-
14
Soft scaping Area (SF)
-
15
To change hourly rates for any trade please go to "Hourly Rates" Tab
Div 01 = #REF!for option 3 & 5
16
Div 01 = #REF!for option 4 & 6
17
ITEM #REF. SHEETDETAILCSI SECTSub ContractorDESCRIPTION QTY. WASTAGE QTY WITH
WASTAGE
UNIT UNIT LABOR HOURS TOTAL LABOR HOURS PER HOUR LABOR RATE TOTAL LABOR COST UNIT MATERIAL COSTTOTAL MATERIAL COSTITEM COSTTRADE COST UNIT COST WITH MARKUPS TOTAL COST WITH MARKUPS
18
DIV-01General $ 59,805 $ 539,028.29 $ 539,028
19
20
Plan Design and Permitting
21
1DIV-01General RequirementsArchitecture (Assumed By Owner) 1 1 LS - $ 66.5 $ - $ - $ - $ -
22
2DIV-01General RequirementsEngineering (Assumed By Owner) 1 1 LS - $ 66.5 $ - $ - $ - $ -
23
3DIV-01General RequirementsSurveying 1 1 LS - $ 66.5 $ - $ - $ - $ -
24
4DIV-01General RequirementsSoils Report (Assumed By Owner) 1 1 LS - $ 66.5 $ - $ - $ - $ -
25
5DIV-01General RequirementsGeological Report (Assumed By Owner) 1 1 LS - $ 66.5 $ - $ - $ - $ -
26
6DIV-01General RequirementsConcrete Testing 1 1 LS - $ 66.5 $ - $ - $ - $ -
27
7DIV-01General RequirementsPermit Fee 1 1 LS60.793 60.79 $ 66.5 $ 4,042.7 $ 4,043 $ 4,759.89 $ 4,760
28
8DIV-01General RequirementsPermits (Based on interior finish area) 1 1 LS - $ 66.5 $ - $ - $ - $ -
29
9DIV-01General RequirementsPlan Coordination 1 1 LS - $ 66.5 $ - $ - $ - $ -
30
10DIV-01General RequirementsRoof Inspection 1 1 LS - $ 66.5 $ - $ - $ - $ -
31
11DIV-01General RequirementsBlueprints (?? Pages) 1 1 LS - $ 66.5 $ - $ - $ - $ - Plans64
32
Specs236
33
Utilities
34
12DIV-01General RequirementsUtilities during construction (Based on interior finish area) 1 1 LS23.344 23.34 $ 66.5 $ 1,552.4 $ 1,552 $ 1,827.80 $ 1,828
35
13DIV-01General RequirementsPort-o-Potty (Based on interior finish area) 1 1 LS20.832 20.83 $ 66.5 $ 1,385.3 $ 1,385 $ 1,631.06 $ 1,631
36
14DIV-01General RequirementsTemporary Power (Based on interior finish area) 1 1 LS52.687 52.69 $ 66.5 $ 3,503.7 $ 3,504 $ 4,125.24 $ 4,125
37
38
Equipment and Tools
39
15DIV-01General RequirementsTool Rentals 1 1 LS - $ 66.5 $ - $ - $ - $ -
40
16DIV-01General RequirementsTool Shed 1 1 LS - $ 66.5 $ - $ - $ - $ -
41
17DIV-01General RequirementsDust Control 1 1 LS - $ 66.5 $ - $ - $ - $ -
42
18DIV-01General RequirementsIce, Water, Beverages 1 1 LS - $ 66.5 $ - $ - $ - $ -
43
19DIV-01General RequirementsGarbage Dumpster / Trash Containers 1 1 LS - $ 66.5 $ - $ - $ - $ -
44
20DIV-01General RequirementsMobilization/Demobilization (Temporary Control & Facilities) 1 1 LS243.171 243.17 $ 66.5 $ 16,170.8 $ 16,171 $ 19,039.56 $ 19,040
45
46
Signage and Promotion
47
21DIV-01General RequirementsJob Signs 1 1 LS - $ 66.5 $ - $ - $ - $ -
48
22DIV-01General RequirementsJob Photos 1 1 LS - $ 66.5 $ - $ - $ - $ -
49
23DIV-01General RequirementsSignage 1 1 LS - $ 66.5 $ - $ - $ - $ -
50
24DIV-01General RequirementsPromotion/entertainment 1 1 LS - $ 66.5 $ - $ - $ - $ -
51
25DIV-01General RequirementsMisc. 1 1 LS - $ 66.5 $ - $ - $ - $ -
52
53
Cleaning and Final
54
26DIV-01General RequirementsTrash 1 1 LS - $ 66.5 $ - $ - $ - $ -
55
27DIV-01General RequirementsFinal Cleaning 1 1 LS52.687 52.69 $ 66.5 $ 3,503.7 $ 3,504 $ 4,125.24 $ 4,125
56
28DIV-01General RequirementsWindow washing (rough # of windows ) 1 1 LS - $ 66.5 $ - $ - $ - $ -
57
29DIV-01General RequirementsPunch List Items 1 1 LS - $ 66.5 $ - $ - $ - $ -
58
59
Bonds, Insurance, Legal
60
30DIV-01General RequirementsCasualty Insurance 1 1 LS - $ 66.5 $ - $ - $ - $ -
61
31DIV-01General RequirementsMedical Insurance 1 1 LS - $ 66.5 $ - $ - $ - $ -
62
32DIV-01General RequirementsGeneral Liability Insurance 1 1 LS - $ 66.5 $ - $ - $ - $ -
63
64
Project Management & Supervision
65
33DIV-01General RequirementsProject Management & Supervision 1 1 LS445.813 445.81 $ 66.5 $ 29,646.6 $ 29,647 $ 34,905.85 $ 34,906
66
67
DIV-02Demolition $ 1,340
68
69
Fire Protection Pipe
70
34DM-100,DM-101,DM-111DM-100,DM-101,DM-111DIV-02Demo - BuildingRemove Existing Fire Hydrant 3 3 EA0.657 1.97 $ 200.0 $ 394.2 $ - $ 394 $ 154.71 $ 464
71
35DM-100,DM-101,DM-111DM-100,DM-101,DM-111DIV-02Demo - BuildingRemove Existing Water Fountain 2 2 EA2.364 4.73 $ 200.0 $ 945.6 $ - $ 946 $ 556.67 $ 1,113
72
73
DIV-21Fire Suppression $ 238,337
74
75
Fire Protection Pipe
76
36FP112-FP152FP112-FP152DIV-21Fire Suppression2-1/2" Dry Pipe System 165 5% 173 LF0.134 23.16 $ 200.0 $ 4,632.4 $ 5.1 $ 879.8 $ 5,512 $ 37.66 $ 6,510
77
37FP112-FP152FP112-FP152DIV-21Fire Suppression1-1/2" Dry Pipe System 408 5% 428 LF0.121 51.85 $ 200.0 $ 10,369.1 $ 3.1 $ 1,311.1 $ 11,680 $ 32.17 $ 13,782
78
38FP112-FP152FP112-FP152DIV-21Fire Suppression2" Dry Pipe System 382 5% 401 LF0.130 52.11 $ 200.0 $ 10,421.2 $ 3.2 $ 1,262.6 $ 11,684 $ 34.39 $ 13,785
79
39FP112-FP152FP112-FP152DIV-21Fire Suppression4" Dry Pipe System 172 5% 180 LF0.177 31.89 $ 200.0 $ 6,378.7 $ 10.1 $ 1,819.9 $ 8,199 $ 53.80 $ 9,695
80
40FP112-FP152FP112-FP152DIV-21Fire Suppression3" Dry Pipe System 233 5% 244 LF0.146 35.68 $ 200.0 $ 7,136.1 $ 8.0 $ 1,950.2 $ 9,086 $ 43.96 $ 10,743
81
41FP112-FP152FP112-FP152DIV-21Fire Suppression1" Dry Pipe System 505 5% 530 LF0.099 52.51 $ 200.0 $ 10,501.4 $ 2.6 $ 1,368.4 $ 11,870 $ 26.41 $ 14,007
82
42FP112-FP152FP112-FP152DIV-21Fire Suppression1-1/4" Dry Pipe System 240 5% 252 LF0.114 28.70 $ 200.0 $ 5,739.6 $ 2.7 $ 679.7 $ 6,419 $ 30.09 $ 7,574
83
43FP112-FP152FP112-FP152DIV-21Fire Suppression1" Dry Pipe System 173 5% 182 LF0.099 17.99 $ 200.0 $ 3,597.9 $ 2.6 $ 468.8 $ 4,067 $ 26.41 $ 4,799
84
44FP112-FP152FP112-FP152DIV-21Fire Suppression4" Dry Fire Standpipe 14 5% 15 LF0.177 2.60 $ 200.0 $ 520.4 $ 10.1 $ 148.5 $ 669 $ 53.80 $ 791
85
45FP112-FP152FP112-FP152DIV-21Fire Suppression6" Dry Fire Standpipe 223 5% 234 LF0.231 53.99 $ 200.0 $ 10,798.3 $ 18.6 $ 4,347.4 $ 15,146 $ 76.72 $ 17,932
86
46FP112-FP152FP112-FP152DIV-21Fire Suppression2-1/2" Fire House Valve 28 5% 29 LF0.134 3.94 $ 200.0 $ 787.9 $ 5.1 $ 149.6 $ 938 $ 37.66 $ 1,107
87
88
Hangers
89
47DIV-21Fire Suppression3/8" Threaded Hanger Rod
-Heavy Duty Clevis Hanger
-16 Gauge Zinc Coated Steel Saddle 12" Long
213 213 EA0.200 42.69 $ 200.0 $ 8,538.7 $ 13.2 $ 2,817.8 $ 11,356 $ 62.94 $ 13,436
90
48DIV-21Fire Suppression1/2" Threaded Hanger Rod
-Heavy Duty Clevis Hanger
-16 Gauge Zinc Coated Steel Saddle 12" Long
400 400 EA0.180 71.95 $ 200.0 $ 14,389.3 $ 17.6 $ 7,034.8 $ 21,424 $ 63.51 $ 25,386
91
49DIV-21Fire Suppression5/8" Threaded Hanger Rod
-Locking Nut
-Support Nut
-Shied Insert
-16 Gauge Zinc Coated Steel Saddle 12" Long
46 46 EA0.250 11.45 $ 200.0 $ 2,289.1 $ 22.0 $ 1,007.2 $ 3,296 $ 85.28 $ 3,904
92
93
Fitting
94
50FP112-FP152FP112-FP152DIV-21Fire Suppression4" X 4" X 4" Wye Connection 5 5 EA0.660 3.30 $ 200.0 $ 660.0 $ 54.0 $ 270.0 $ 930 $ 220.24 $ 1,101
95
51FP112-FP152FP112-FP152DIV-21Fire Suppression4" X 4" X 3" Wye Connection 5 5 EA0.629 3.15 $ 200.0 $ 629.0 $ 51.0 $ 255.0 $ 884 $ 209.33 $ 1,047
96
52FP112-FP152FP112-FP152DIV-21Fire Suppression4" X 4" X 2" Wye Connection 1 1 EA0.587 0.59 $ 200.0 $ 117.4 $ 47.6 $ 47.6 $ 165 $ 195.36 $ 195
97
53FP112-FP152FP112-FP152DIV-21Fire Suppression2" X 2" X 2" Wye Connection 2 2 EA0.266 0.53 $ 200.0 $ 106.4 $ 21.6 $ 43.2 $ 150 $ 88.57 $ 177
98
54FP112-FP152FP112-FP152DIV-21Fire Suppression3" X 3" X 3" Wye Connection 9 9 EA0.474 4.27 $ 200.0 $ 853.2 $ 38.4 $ 345.6 $ 1,199 $ 157.71 $ 1,419
99
55FP112-FP152FP112-FP152DIV-21Fire Suppression1/2" X 1/2" X 1/2" TEE Connection 2 2 EA0.054 0.11 $ 200.0 $ 21.6 $ 4.4 $ 8.8 $ 30 $ 18.00 $ 36
100
56FP112-FP152FP112-FP152DIV-21Fire Suppression2" x 2" x 2" TEE Connection 3 3 EA0.251 0.75 $ 200.0 $ 150.6 $ 20.4 $ 61.2 $ 212 $ 83.59 $ 251