2019-20 MAINTENANCE PROJECTS
111
112
Item #Type
Location
DescriptionCost Est.StatusItem #
113
1SPECD/WDistrict wide comprehensive Roof study$4,350Completed1
114
2SPECDWLook at expanding more safety door film (all remining doors) Consider other security needs$35,000HS PA Completed2
115
3SPECHS
New outside doors original bld & 1997 add. 12 entrances cost $151,832 (project to include all north facing entrances)
$90,000Completed3
116
4SPECHSFinish installation of wireless clocks throughout school ( only about 30 clocks needed)$4,835Completed4
117
5SPECHSPaint science storage, math resource, PE and athletic locker rooms, and band practice rooms. $9,835Completed5
118
6SPECHS
Sand and stain (1967) inside classroom doors (primarily 2nd floor) + add kicker plates (worn and water damage)
$2,000Completed6
119
7SPECHSUpdate display cases in hallways$2,500Completed7
120
8SPECJSAdditional PA speaker for kitchen area $1,172Completed8
121
9SPECHS Ceiling replacement & lights 508,510,517 (5,000 per room)$14,882Completed9
122
10SPECJSBegin classroom painting rotation (15 Classrooms)$7,768Completed10
123
11SPECJSInstall more Rubber chips in N/E playground $3,473Completed11
124
12SPECJS/DOUpdate Lighting to LED (Focus on Energy Project) $96,300 (4+ year payback)Energy ProjectCompleted12
125
13SPECJSBegin install of bottle filling water fountains (2 replacements)$1,804Completed13
126
14SPECJSReplace ceilings in Rooms 301,303 and 305$11,400Completed14
127
15SPECJSReplace Clocks in all areas of school$10,183Completed15
128
16SPECMSPaint an auto drop off zone along east side of building$1,000Completed16
129
17SPECMSPainting-main gym,small gym, locker rms, railings ( Gym ductwork not included)$6,268Completed17
130
18SPECMSPurchase 20 wireless clocks$3,225Completed18
135
23SPECTB
Teacher Workroom window from the inside needs plexiglass replaced with glass and current caulk is bad.
$635Completed23
136
24SPECTBReplace tile in Teacher Workroom $5,500Completed24
137
25SPECTBSound Panels in Lunch Room
Local Bus. Donation USG
Completed25
138
26SPECTBInstall speaker in Kitchen for announcements and drills & Special Ed area$3,160Completed26
139
27SPECTB Visitor locker storage (like the HS) - entryway$2,417Completed27
140
28SPECWSBegin classroom painting rotation (12 rooms)$7,620Completed28
141
29SPECWSRepair roof/ceiling in computer lab hallway $19,338Completed29
142
143
TOTAL (Current Maintenance budget is $250,000)$248,365
144
145
146
147
FUTURE MAINTENANCE PROJECTS
148
1SPECD/WReplace 2007 box truck$65,0001
149
2SPECDWBegin replacement of Exterior entrances at all 3 Elementary buildings$100,0002
150
3SPECDWRestripe parking lots district wide$15,0003
151
4SPECDOWash all windows inside and out of District Office BuildingTBD 4
152
5FLOORDOLook at carpet replacement for 1st & 2nd floor$25,000 5
153
6SPECDOReplace 1887 building sign$4,000 6
154
7HVACDOUpgrade basement offices with heat, air conditioning TBD 7
155
8SPECHSRepaint older Lockers (only original lockers 1967)$15,00018
156
9SPECHSUpdate stairwell in front lobby with ceramic tile (paint?)$25,00019
157
10SPECHSPurchase 45 clocks to finish clock system inatallation$7,000 10
158
11ROOFHSReplace pool roof$225,000111
159
12HVACHSRepair A/C for front office$15,00012
160
13SPECHSNew Sound System for pool$32,414 13
161
14ELECHSReplace ceramic drinking fountains by chorus/band and spec ed$5,000114
162
15SPECHSReplace remaining outside doors $150,000115
163
16SPECHSPaint large gym$25,000 16
164
17SPECHSClean Main Gym Ductwork$2,000117
165
18SPECHSInstall LED lights throughout the school (Focus On Energy Rebate)TBD18
166
19SPECHSReplace Suchy Gym curtain$20,000 19
167
_20SPECHSReplace Suchy, large, and freshmen gym doors$13,500 20
168
21SPECHSReview and replace certain cafeteria furniture items (ripped and worn)$5,000 21
169
22SPECHSRemove large center scoreboard$5,500 22
170
23SPECHSReview and replace PE lockers (girls rusting significantly)$26,500 23
171
24HVACHSAuditorium air handler replacement$75,00024
172
25HVACHSRelocate auto shop compressor to boiler room$8,00025
173
26SPECHSReplace motors on basketball hoop lifts.$3,500 26
174
27PLUMHSUpdate Lobby Bathrooms Look at changing womens door$40,000 27
175
28SPECHSAutomated Pool Monitoring System$7,50028
176
29SPECHSAdditional furniture plan for the front lobbyTBD 29
177
30SPECHSRepair (2) large gym door panels (holes) and overall system repairs$16,500130
178
31SPECHSTech ED.- woods, welding, metals areas visual (wave) indicatorsTBDneed install31
179
32SPECJSRefinish/reline Gym Floor $12,500132
180
33ELECJSReplace old generator unit$52,100 33
181
34HVACJSDuct Cleaning on all AHU'S $25,798 34
182
35ELECJSRecarpet Gym Stage add electrical outlets to front step $3,500135
183
36SPECJSRemove trees along Armory fence line/replant new trees that are not Walnut $5,000136
184
37SPECJSRepair gym parapit wall flashing $15,00037
185
38HVACJSNew Heat and Air conditioning in Gym$75,000 38
186
39SPECJS
Walking path between Jackson and the high school: replace and make wider for wheelchair access
Discuss w/ CityTBD39
187
40SPECJSoutside wall in kitchen by dishwasher needs repair, water damage25k-35k40
188
41SPECJSReplace bathroom stalls in 95 add.41
189
42SPECMSUpdate furniture in PodsTBD142
190
43FLOORMSRefinish/reline Gym Floor $25,000143
191
44SPECMSRenovate computer lab 119 carpet, paint ,furniture$5,000144
192
45SPECMSReplace carpeting in the pods throughout the school$75,00045
193
46SPECMSConnect adjacent storage room to aux. gym for weight room$50,00046
194
47SPECMSAlternate portable sound system instead of permanent install$15,00047
195
48SPECMSBegin chalkboard replacement throughout building$36,00048
196
49SPECMSInstall new projection screen on stage. Electrified.TBD49
197
50SPECMSInstall horizontal climbing wall$30,00050
198
51SPECMSReplace exterior doors in Gym$60,00051
199
52SPECTBInstall new cabinet / sink counters in rooms 30 and 31$10,000152
200
53SPECTBUpdate Kindergarten bathrooms room 30 and 31TBD153
201
54SPECTBCreate Counter Top for front office areaTBD54
202
55SPECTBExterior door replacement (6 entrance locations)$75,00055
203
56SPECTBReplace windows on pre 1995 building section$75,00056
Loading...