Bill of Quantity (BOQ)
2
F.Y. 2080/81
3
Name of the Programme : Construction of Deep Tube well for WAN/NWSC in Lahan Municipality, Siraha District
4
Name of Work : Construction of 300/200mm dia two Deep Tubewell to a depth of 175 m each
5
Location : Matiharwa, Lahan Municipality, Siraha District
Method: Rotary/Percusion Drilling
6
Tender No:
7
S. NoDetails of workUnitQuantityPer Unit Rate (Nrs)Total Amount (Nrs)Remarks
8
In figureIn word
9
1Mobilisation/Demobilisation of Drilling Equipment, Manpower & preparation for temporary access road for rig machine & other vehicles for the tubewell drilling site Job1
10
2Site Clearance Cutting uprooting & disposal of grass, with light compaction levelling, cleaning the site, Plate form preparation for rig, compressor & pump, and mudpitsJob1
11
3Supply and Delivery of 300 mm (12") MS Casing Pipe of min. 7mm thickness with Ring as per specificationmtr60
12
4Supply and Delivery of 200 mm (8") MS Casing Pipe of min. 6mm thickness with Ring as per specificationmtr91
13
5Supply and Delivery of 200 mm (8") Stainless Steel screen Pipe (SS304) with ring as per specificationmtr24
14
6Well cap with flange (12" Ø) and nut boltsset1
15
7CentraliserLS2
16
8Crossbar mtr6
17
9Sinking Guide pipe 24" dia all completemtr6
18
10300/200 mm Reducer set1
19
11Drilling of pilot hole by 9*7/8" dia. Drilling Bitmtr175
20
12Electrical Resistivity Logging, Plotting and Design mtr175
21
131st Reaming of Pilothole by 13*1/2 " dia. Drilling Bitmtr175
22
142nd Reaming of Pilothole by 20" dia. Drilling Bitmtr175
23
15Recondition of bore holemtr175
24
16Lowering of Pipe Assembly as per Approved Designmtr175
25
17Supply of gravel as per specificationm326
26
18Bentinote required to Seal using Bentonite Pellete/Balls/Chips upto 35 m from surfacekg3000
27
19Packing of gravel and Bentonite as per Instruction of Expertm31
28
20Well Development by Backwashing, Inner washing, Compressor/Surging/Jetting etc. as per the instruction of ExpertHr48
29
21Well Development by PumpHr48
30
22Pump Test (Time-Drawdown Test) Hr24
31
23Recovery TestHr24
32
24Pump Test (Step Drawdown test)Hr24
33
25Cementation for Sanitary Protection & Well Support Work (up to 1.5 m depth) by Concrete of M-20 Grade with pipe or iron bar as required with all completeLS1
34
26Drilling Report Preparation and Submission LS1
35
Sub Total (A)
36
Insurance against of work, third party & accident of workman (b) @.50% of A=B
37
Sub Total(Single Tubewell )
38
Sub Total(Two Tubewell )
39
VAT @ 13 %
40
Total
41
42
Name and Address of the Firm:
43
Authorised Person of the Firm:
44
Signature of Authorised Person of the Firm:
45
Seal of the Firm:
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100