Submitted OnYour NameTrailPurposeAre there pending tasksCommentsHoursMinutesPicturesArticle
2
12/24/2021 14:57:28John HansenMT - John WilliamsBothNo* Removed large protruding silt fence spike from middle of trail with carbide Sawzall that was recently reported
* Repaired critical cribbing on steep slope that washed out recently. Needed to be done ASAP for all the holiday traffic
230Before & After
3
12/23/2021 18:27:54John HansenMT - Covered BridgeWorkNo* Loose wooden step on "Steep Steps" fixed with screws
* Loose stepping rock on feeder creek fixed
* Widened part of trail near a tree which had numerous roots exposed. Replaced 50 feet of cribbing in same area
2Before & After
4
12/23/2021 16:34:03Mitch WaldmanNV - LakeWorkNoLiz and I cleared the logs and debris that was impacting water flow over the spillway between Lake Disharoon and the Rock Slide.130
5
12/23/2021 7:03:08Mark DeckerME - MeadowsWorkYesblew leaves off trails1
6
12/22/2021 18:15:20Liz SchererOther - More than one trailWorkNoI blew the leaves off of the bobcat Ridge access trail and the blazing star access trail.130
7
12/22/2021 18:13:09Liz SchererMT - Blackwell Creek Way AccessWorkNoJohn Hansen, Mike Sheely and I went to clear a tree across the trail yesterday. 20 minutes1
8
12/22/2021 16:31:40Marcel JacobNV - Nancy WomackBothNoPicked up some fallen branches, trimmed back a few pepper branches.45
9
12/20/2021 14:24:43John HansenMT - John WilliamsWorkNo* Installed four 6x6's on a parking pad, removed old timbers and set up a railing left and right side
* Root mitigation and cribbing rebuilding on JWT - Pictures sent
Jim and John Hansen 3.5 hours each = 7 hours total
7Before & After
10
12/17/2021 20:03:25Victor ShannonIR - Indian MoundsWorkNoCleared the trail of debris.130
11
12/17/2021 15:24:39Bill NelsonWC - Bobcat Ridge AccessBothNoCleared debris on trail, swept bridge and steps10
12
12/17/2021 15:24:28Edward HickmanWC - Bobcat Ridge AccessBothNoClear debris on trail, swept bridge and steps10
13
12/17/2021 15:22:09Edward HickmanWC - Blazingstar AccessWorkNoReplaced three log steps and cleared debris on trail10
14
12/17/2021 15:22:08Bill NelsonWC - Blazingstar AccessWorkNoReplaced 3 log steps and cleaerd debris on trail10
15
12/16/2021 9:55:56Kay DavisWA - Mike DavisBothNoCombined hours this year for inspections and blowing the leaves20
16
12/16/2021 6:55:56Ken BechelyME - MeadowsWorkNoNovember 19, 2021 - Part of work crew that replaced stairs off Gadalutsee Pass on Meadows Spur Trail; additional work done240
17
12/15/2021 20:21:24Mike SheelyNV - Lower FallsInspectionNoTrimmed branches, removed down tree from falls, cleared leaves5
18
12/15/2021 20:04:17Ignacio leonNV - Wildflower TrailBothNoTwo dead trees down and blocking the Wildflower Trail1
19
12/15/2021 18:43:37Greg RiccardiWC - PerimeterInspectionNo30
20
12/15/2021 18:42:18Greg RiccardiWC - Wildcat ConnectorInspectionNoNone1
21
12/15/2021 17:29:16Carl PetersonWA - Blackwell SpringsWorkNoBlew leaves off access trail and around the cove area20
22
12/15/2021 16:02:14Terry StewartPF - PlayfieldWorkYesremoved a couple of smaller trees from the trail that had fallen during last storm. Also straightened up the trail sign at end of trail up near post office.1
23
12/15/2021 14:25:04John HansenMT - John WilliamsWorkNo* Continued cribbing replacement
* Installed 3 steps to go over roots between trees
Jim and John Hansen 3 hours each
6
24
12/14/2021 8:23:05Doug HanleyNV - JeepInspectionYesPost storm inspection.
Refilled trail maps, picked up trash.
Trail is clear and open
145
25
12/13/2021 15:25:33John HansenMT - John WilliamsWorkYes* Replaced 3 rotted log steps and added 2 additional ones at trail head
* Continued root mitigation of trail by either removing or covering up with dirt
2
26
12/13/2021 14:36:28Pete StahlmanMT - Blackwell Creek Way AccessBothNoTrail was in good shape. Used blower to clear leaves in some areas. Removed small branches.025
27
12/13/2021 13:20:16Marcel JacobNV - Nancy WomackInspectionYesThere is one small tree limb that needs to be tied back and not sure if I can just use some twine I have or if there is specific material in storage?45
28
12/13/2021 10:53:27Malcolm HallsWC - Wildcat Trail AccessWorkNoJeff Weigl and I cleared tree from trail.1
29
12/13/2021 10:44:33Jeff WeiglWC - Wildcat Trail AccessBothNoCut tree that had fallen on Saturday.10
30
12/12/2021 17:10:26Malcolm HallsWC - Wildcat Trail AccessInspectionYesOne downed tree across the trail close to where it starts at Wildcat Trail. Will clear tomorrow.1
31
12/12/2021 12:59:32John HansenMT - John WilliamsBothYes* Walked trail, Blew leaves off and removed numerous downed limbs. Nothing major.
* Replaced 3 wooden steps that were rotted
3
32
12/12/2021 11:55:30Phil WaldropIR - Lake PetitInspectionNoAfter the storm on 12/11 the trail is clean and clear.40
33
12/10/2021 16:32:33John HansenMT - Covered BridgeWorkNo* Fixed a 50 foot section of the trail that was washed away and had numerous roots exposed as tripping and slipping hazards.
* Installed 5 new steps with logs and rebar
John and Jim Hansen 2.5 hours each
5Before & After
34
12/9/2021 10:10:06Doug HanleyNV - JeepWorkYesLooked for tree mentioned in recent emails, couldn't find it.
Restocked trail maps.
Parking bumper needs to be re-attached by Public Works at Yellow Root Trail entrance. pics on the way.
Trail was clear and open Monday 12-6-21.
115
35
12/8/2021 16:37:55Jim HansenMT - John WilliamsWorkNoRepaired and secured a section of cribbing along the JW trail. Also did some root and rock mitigation in the same area.130
36
12/8/2021 8:55:30Mitch WaldmanCT - ChoctawWorkNoSheila Waldman painted the sign that Joe Tipton built for the Weaver Mill ruins10
37
12/5/2021 19:43:42James SpearmanHG - High Gap ConnectorBothYesDoug and I constructed erosion barriers. We need to construct 3-4 more erosion barriers.430
38
12/4/2021 15:33:53Steve PapkeNV - Lower FallsInspectionNoMulch the POA put down is holding up well. Trails in good shape Also walked the upper falls, jeep and wildflower there is a Galen tree to keep an eye on the jeep trail between the first two and second foot bridges. Will send phot separately20
39
12/4/2021 10:55:36Reg RichardMT - Blackwell CreekBothNo12/3/2021 Walked both the Nature Trail and Blackwell Creek Trails and blew leaves off treadway.
No issues on either Trail noted.
1
40
12/2/2021 15:14:13John HansenMT - Covered BridgeWorkYes* Repaired and replaced multiple rotted cribbing logs with stone on entrance to going under Covered Bridge
* Removed numerous roots and tripping rocks on trail between Covered Bridge and Marble Bench on CB trail
* Added a new step onto Covered Bridge walkway
Jim and John Hansen 2.5 hours each over 2 days
50Before & After
41
12/2/2021 12:18:56Marcel JacobNV - Nancy WomackBothNoBlew leaves, but not as many as the first time. Cleaned off sign designated tree on Indian Trail50
42
11/30/2021 15:53:14Terry StewartPF - PlayfieldBothYesToday I blew off leaves and debris on Playfield and Village trail. I want to go back and straighten some trail signs and anchor some steps Liz and I installed a few weeks ago.45
43
11/29/2021 15:15:31John HansenMT - John WilliamsWorkYes* Rebuilt trail of about 50 feet before going from the JWT to the Covered bridge. Added a step over a large unmovable rock in the middle of the trail that would not allow redirecting around it.
* Continued up to near the marble bench and began repairing the trail that had a large number of roots and rocks. Removed them to smooth out the trail
* Acquired a few 2x6's and sawed them into long cribbing stakes.
Jim and John Hansen 3.5 hrs each - Pic to follow
7Before & After
44
11/27/2021 14:40:10Malcolm HallsWC - Wildcat Trail AccessBothNoWalked down to trail to blow leaves and found Jeff had already done the areas I saw during last inspection. Since I had my blower with me I went ahead and blew the trail off again.1
45
11/27/2021 9:20:26Mitch WaldmanNV - Wildflower TrailWorkNoSheila blew the leaves off of the Wildflower Trail while Ignacio was out of the country for a few weeks.030
46
11/26/2021 17:17:48Victor ShannonIR - Indian MoundsWorkNoI blew off the trail of leaves and debris. I also replenished the brochures.10
47
11/25/2021 18:23:20Mitch WaldmanNV - LakeWorkNoSheila blew the leaves off of the Lake Trail between the Fitness Center and Wilderness Parkway.115
48
11/25/2021 14:29:22John HansenMT - John WilliamsWorkNoBlew leaves around Trotters Lane parking and trail head. Also blew some more on the trail1
49
11/24/2021 14:52:46Jeff WeiglWC - Wildcat Trail AccessBothNoBlow leaves. Blow leaves. And blow leaves!10
50
11/24/2021 12:09:09John HansenMT - John WilliamsWorkNoReestablished and replaced 5 large stone steps that were no longer functioning well.
Pictures to follow
Jim and John Hansen 2 hours each
4Before & After
51
11/23/2021 17:36:12Malcolm HallsWC - Wildcat Trail AccessInspectionNoparts of the trail could use leave blowing, will try to do this weekend1
52
11/23/2021 17:32:26Peter StahlmanMT - Blackwell Creek Way AccessBothNoChecked trail. Cleared some small branches and used blower to clear leaves.025
53
11/22/2021 17:05:03John HansenMT - John WilliamsWorkNoBlew leaves off JWT and CB along with the CB Loop130
54
11/21/2021 16:45:03Doug HanleyNV - JeepBothYesBlew leaves where necessary. See all photos please.130
55
11/21/2021 12:15:07Liz SchererCT - ChoctawWorkNoPainted the bench at the mill ruins that was looking pretty bad.50
56
11/20/2021 21:44:00Reg RichardMT - Nature TrailBothNoWalked the trail today 11/20/2021 and cleared leaves from treadway using battery powered leaf blower.
No issues noted.
45
57
11/20/2021 18:07:12Vic ShannonIR - Indian MoundsWorkNoI cut the lumber that was salvaged from a Big Canoe resident early this week. The lumber will be used to build (repace) 2 bridges.330
58
11/19/2021 17:39:08Phil WaldropIR - Lake PetitBothYesAfternoon of 11/19 blew the pathway clear of leaves. Blower battery died about 100 yards from the last bridge, so I'll go back to finish this weekend.45
59
11/19/2021 17:30:34Marcel JacobNV - Nancy WomackWorkNoI blew off the trail and added a few “guard rails”. Encountered a family during this time and they thanked the trail committee for what they do to maintain the trails.130
60
11/19/2021 16:04:21Liz SchererME - MeadowsWorkNoWork day. Replaced the old RR tie steps at one of the entrances to the Meadows from Gadalutsee Pass with fresh 6x6 timbers. Cleaned up the trail. Mitch Waldman, Terry Stewart, Ken Bechely, Clardy Schwarz, Bill Dempsey and I. Took 5 hrs and 20 minutes. Next time we do this, we need the timbers pre cut and pre drilled before beginning the work.32
61
11/19/2021 14:11:00Joe TiptonHG - High Gap ConnectorWorkNoCleared leaves from all HG trails with leaf blower. Removed 12" downed pine across Red trail. Reset dovetail bench on Blue trail.330
62
11/19/2021 13:18:18Vic ShannonIR - Indian Mounds LoopWorkNoI cleared debris and leaves from the trail.10
63
11/18/2021 20:54:23Liz SchererCT - ChoctawWorkNoMitch, Clardy and I took care of a tree across the creek right behind the mill ruins. Cut it and moved the trunk along the shore to help support the shore and prevent erosion that threatens one of the stone pillars. Pressure washed the bench.3
64
11/17/2021 17:51:55John HansenMT - Covered BridgeWorkNo* Final work on Loop section where we added 3 new steps
* Repositioned about 20 stone steps that were in difficult positions to step on
* Added new cribbing
Work on Loops section is now complete
Jim and John Hansen 3 hours each
6Before & After
65
11/17/2021 17:07:52Liz SchererCT - ChoctawWorkNoMitch Waldman, Don Gallagher, Mike Sheely, Bob Kenyon and I cleared up the view from a bench onto the golf course and stream beyond. Also cleaned up the crowns of prior downfalls that were left on the side of the trail.12
66
11/16/2021 15:32:10Carl PetersonWA - Blackwell SpringsBothYesInspected steps on access trail from Water Lily to determine how many need replacement. Picked up timbers from Burrow Pit. Cut timbers to size. Blew leaves off access trail and part of the main trail around pond. Still to do: install new timber stairs replacing rotting ones.45
67
11/16/2021 15:04:16Mitch WaldmanNV - LakeWorkNoSheila Waldman blew the leaves off of the trail from Wilderness Parkway to the Fitness Center10
68
11/16/2021 13:34:32Doug HanleyNV - JeepInspectionYesNormal inspection.
Blew leaves on Upper Falls bridge.
Refilled trail map holders.
130
69
11/16/2021 10:27:21Liz SchererNV - Nancy WomackBothNoOrientation session for new member Marcel Jacob. Clardy, Marcel and I walked the NWT from the beginning to Valley View.3
70
11/15/2021 15:17:34Rita BojeWA - Blackwell SpringsInspectionNoCleared leaves around the lake.10
71
11/15/2021 14:51:50Mitch WaldmanNV - LakeWorkNoLiz, Sheila and I completed the new stone pathway over muddy/boggy trail area near the wildflower intersection of the Lake Trail. We brought in 14 buckets of gravel from the borrow pit to complete the project.230
72
11/15/2021 14:38:48Victor ShannonIR - Indian Mounds LoopWorkNoI was able to obtain lumber for the bridges I will be replacing in Indian Mounds Park. The lumber was donated by a BC resident- with the condition that I demo the handicap ramp in his carport. A “win-win” for all concerned. Time logged is how long it took to break down the handicap ramp.50
73
11/13/2021 20:25:12Peter StahlmanMT - Blackwell Creek Way AccessBothNoCleared small branches and leaves from the trail.050
74
11/13/2021 16:03:56Jeff WeiglWC - Wildcat Trail AccessBothNoBlew a lot of leaves!10
75
11/13/2021 12:21:00Liz SchererPF - PlayfieldBothNoChecked trail and blew off the leaves. Replenished the brochures at the kiosk.1
76
11/12/2021 17:59:42Vic ShannonIR - Indian MoundsWorkNoI secured logs being used to mark the trail. Also cleared the trail of leaves and debris from last nights storm130
77
11/12/2021 17:44:32John HansenMT - John WilliamsWorkNo* Blew leaves at Trotters Lane parking including cleaning out the culvert
* Blew leaves on JWT and CB, including Loop section.
* Removed numerous downed branches but nothing major
245
78
11/11/2021 17:18:55clardy schwarzNV - Nancy WomackWorkYesinstalled nonskid on foot bridge, cleared trail of leaves with blower, inspected for future improvements2
79
11/11/2021 17:07:51John HansenMT - John WilliamsWorkNo* Repaired two sections where cribbing was moved and damaged
* Created a step over roots near a tree where roots could not be removed
130
80
11/11/2021 13:19:30Lin CrouseIR - Indian Mounds LoopWorkNoDebarked large tree limbs and placed them on the trail. Picked up 4 6x6 timbers from the borrow pit and drlivered them to the trail in preparation for bridge building.430
81
11/11/2021 13:16:52Vic ShannonIR - Indian MoundsBothNoI blew off the leaves on the trail, moved a large branch that came down across the trail. Also debarked downed tree limbs and placed as trail markers. Also picked up 4 6x6 timbers from the borrow pit and delivered them to IR Loop in preparation for bridge building.530
82
11/10/2021 20:50:22John HansenMT - Covered BridgeWorkYes* Installed 8 new steps at the loop trail loop back section with further steps to be remediated and added at a future time.
* Jim and John Hansen 3 hours each
Noted that there were two sections of cribbing maliciously kicked aside and part of the parking railing at the Trotters lane entrance kicked aside with intent to cause damage.
6Before & After
83
11/8/2021 12:58:49Mitch WaldmanNV - LakeWorkNoWe worked on another log jam today on the Lake Trail/Disharoon Creek that had re-reouted the stream and was eroding banks, endangering more trees.
We used straps, chainsaws, Cant Dog and other tools to get the job done with some folks in the stream and some swampers on land.
Today's work crew was Bill Dempsey, Don Gallagher, Jeff Weigl, Bob Kenyon, Mike Sheely, Liz Scherer and Mitch Waldman.
1030
84
11/8/2021 9:25:26Carl PetersonWA - Blackwell SpringsWorkNocleaned leaves off access pass from Water Lily and around cove30
85
11/7/2021 14:02:22John HansenMT - Covered BridgeWorkNoRebuilt steps near the marble bench on CB trail
* Installed 3 steps and removed numerous roots
* Put 4 buckets of good creek gravel on trail
* Widened and added addition rock cribbing
Pictures sent to Liz
2Before & After
86
11/7/2021 8:46:37Mitch WaldmanNV - LakeWorkNoSheila and I worked on the Lake Trail. Sheila blew the leaves off from the Fitness Center to Wilderness while i added a rock walkway next to the bog bridges where more underground springs had developed, rendering the trail very muddy. Before and after pictures have been sent to the Trail number.40
87
11/6/2021 14:45:10Terry StewartPF - PlayfieldWorkYesBlew off and cleared all leaves and sticks. In addition I straightened three trail signs which will suffice for now but a couple of them need to be set a little deeper for stability. There is also one short section of the trail that has a slope down to the creek so I will either add cribbing to build up and level or may shift trail over a few feet to avoid the slope....I will take care of this no later than early spring.45
88
11/4/2021 14:50:35Phil WaldropIR - Lake PetitBothNo11/3 blew leaves off trail path.40
89
11/3/2021 15:15:19Liz SchererMT - Blackwell CreekInspectionNoWalk through with trail overseer, going over things that can be improved and things that are fine as they are. Clardy joined Bill Merrick and I. 1 hr3
90
11/3/2021 14:32:02Jim HansenOther - More than one trailBothNoBlew trail off. Removed some branches and debris as well. Replaced and repositioned 4 lag bolts on crossover bridge that were loose and rusted.130
91
11/3/2021 13:43:23Mitch WaldmanNV - LakeInspectionYesSteve Papke and I walked the Lake Trail to another Creek log jam area midway between Wilderness and the Fitness Center. We will put together another workday next week to tackle this jam that has re-directed the creek and caused bank erosion.10
92
11/2/2021 19:28:37Lin CrouseIR - Indian Mounds LoopWorkNoHelped Vic clear debris from an old blow down.230
93
11/2/2021 19:23:20Vic ShannonIR - Indian MoundsWorkNoI cleared the trail of leaves and debris. In the process I discovered a small tree down, coming across the trail. I cut the tree and also did some work on the large blow down from a year ago.330
94
11/2/2021 19:19:23Mitch WaldmanNV - LakeWorkYes6 of us cleared a very severe log jam on the Disharoon Creek/Lake Trail headed downstream into Lake Disharoon. Water flow was clearly negatively impacted. There is another huge log jam further upstream that Steve Papke and I will inspect tomorrow 11/3 to determine size and scope of the project for a possible workday next week, the week of the 8th. There remain dozens, if not hundreds of trees in Disharoon Creek on the 1.2 mile Lake Trail that are being left as is.150
95
11/1/2021 15:12:29Bill merrickMT - Blackwell CreekBothNo10/16 Cut away tree across trail
10/25. Walked trail and blew leaves off Blackwell creek trail and Nature trail
230
96
11/1/2021 14:56:12John HansenMT - John WilliamsWorkYes* Removed numerous tripping roots and put 20 buckets of dirt on a long portion of the trail covering exposed roots
* Finalized installation of railings on new parking spot on Trotter Lane
2
97
11/1/2021 11:48:29Joe TiptonHG - High Gap TrailsWorkNoUsed leaf blower on all HG trails and access paths.230
98
11/1/2021 0:02:23James SpearmanHG - High Gap ConnectorBothYesDoug Hickman and I constructed three erosion control barriers and did some pruning today. We will construct a few more barriers later this week. Gravel should be placed at the steps at marker 7 on the blue trail and at the path entrance at Blazingstar Lane. I did some path pruning and clearing earlier this month and in September.

Note: time reported includes time in September
430
99
10/31/2021 15:31:21John HansenMT - Covered BridgeWorkNo* Remediated long and too steep a step on part of the trail near the stream bridge next to the marble bench. Added 3 more steps to make it more level and comfortable for hikers. It was one of the issues identified by Liz during her walkabout with us to identify areas we can improve.
Pictures to follow
2
100
10/30/2021 15:12:01Peter StahlmanMT - Blackwell Creek Way AccessInspectionNoPicked up a few small branches.030