A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | AA | AB | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 2022 Land Use | @dropdown | ||||||||||||||||||||||||||
2 | ||||||||||||||||||||||||||||
3 | Email: landuse@stjohnspdx.org | |||||||||||||||||||||||||||
4 | Date of first contact | Address | Building Details | Dwelling Units | Contact | Reviewed at General Meeting | Plans | |||||||||||||||||||||
5 | - | |||||||||||||||||||||||||||
6 | 1/10/2022 | Bethel Baptist Church Lot 7807 N Fessenden St, Portland, OR 97203 | Large empty lot is being split into 3 separate lots and each lot will have a duplex on it with its own private driveway. | 3 | anamicconstruction@gmail.com | https://www.portlandoregon.gov/bds/article/798073 | ||||||||||||||||||||||
7 | 1/23 | 9110 N Central St (and st louis) | Rezoned city egress in back yard | 1 | markdaneplanning@gmail.com | |||||||||||||||||||||||
8 | 1/24/22 | 9486 N Trumbull Ave | Intent to demolish structure. | Unknown | Info@locuscustomhomes.com | |||||||||||||||||||||||
9 | 2/10/22 | Cathedral Park | St. Johns Bridge Concrete Column Repair | N/a | bit.ly/stjohnsbridgerepair | |||||||||||||||||||||||
10 | 2/10/22 | 9340 N Polk Ave | Conversion of garage to ADU | 1 | Lawrence Wikowsky 503-287-6846 | |||||||||||||||||||||||
11 | 2/25/22 | 9211 N. John Ave | Airbnb renewal, 2 bedroom apartment. See listing for more details | 1 | Shane Wallack 971-313-2366 | https://www.airbnb.com/rooms/20282301?source_impression_id=p3_1647304516_kzrZoW82BtBrKdL3 | ||||||||||||||||||||||
12 | 2/26/22 | 10405 N Macrum Ave, Portland, OR 97203 | 2 vacant buildings across 6 historic lots to be split into 2 parcels one with each building. The new parcels will be 29000 and 20000 square feet respectively. Water and utilities will be run to both builds so they can be self sufficient. The intent is to split the land and sell each building individually. No city Bureaus have raised concerns on the proposal. | 2 | Kim Hall Kim@ozwest.toys.com (owner) or Daniel Gevurtz Daniel@zelios.com (representative) | https://www.portlandoregon.gov/bds/article/798787 | ||||||||||||||||||||||
13 | 3/8/22 | 7007 N Columbia Way, Portland, OR 97203 | Airbnb Rental of 2 bedroom house 1-2 weekends a month. Parking in driveway and on Columbia Way for guests. Emily will be residing in the house except for the weekends when she is away. | 1 | Emily Heleva-Ponaski (971)-517-7034 | |||||||||||||||||||||||
14 | 3/17/22 | 6832 N Seneca St. | Intent to demolish structure. | Unknown | Walter@fasterpermits.com (503)703-7592 | |||||||||||||||||||||||
15 | 4/5/22 | 7715 N Central St | Replat 3 existing historic lots to 2 lots. 1 with single occupency home on it currently and 1 vacant lot with no current plans for development. | 1 | Joshua Simpson Josh@ignitionlab.co | https://www.portlandoregon.gov/bds/article/799185 | ||||||||||||||||||||||
16 | 3/24/22 | 9110 N Central St | The applicant is developing two properties located at the intersection of N. Central St. and N. St. Louis St. with one new single-family dwelling each. Both new single-family homes are proposed to be 5-feet from the front property line. Additionally, the garage for each home extends in front of the longest street facing wall of the home which does not meet the standard for garages (33.120.283.E) or the allowed exception. Because the new homes will only have a 5-foot front building setback and the garages extend beyond the longest street-facing façade of the home, Adjustments to the standards are required. | 2 | Markdaneplanning@gmail.com | https://www.portlandoregon.gov/bds/article/799072 | ||||||||||||||||||||||
17 | 4/6/22 | 6823 N SKY ST | The applicant is proposing to convert an unpermitted 390 square foot detached garage into an accessory dwelling unit. The Portland Zoning Code requires that structures be set back a minimum of 5 feet from the side lot lines in this zone (Section 33.110.220; Table 110-4). The existing garage is 3 feet from the side (west) lot line. An Adjustment is therefore requested to reduce the minimum side (west) building setback from 5 feet to 3 feet for a new accessory dwelling unit. | 1 | Dustin Travis Vance & Jonathan Edwards III Adams | https://www.portlandoregon.gov/bds/article/799192 | ||||||||||||||||||||||
18 | 4/27/22 | N lombard and Rivergate | Proposal to add another electrical power transmission line pole. Poles are proposed to connect to the Rivergate Substation. Project will take place in or adjacent to identified wetlands. To mitigate disturbances to wetlands PGE proposes planting 464 native shrubs and 36 live sitka willow stakes. Business concerns for loading and staging zone from PBOT, concerned business contacted BDS for questions and will be working with PBOT on lane closures. | n/a | Jennifer Santhouse Jennifer.santhouse@pgn.com | https://www.portlandoregon.gov/bds/article/799393 | ||||||||||||||||||||||
19 | 5/16/22 | 7804 N Kellogg St | Airbnb one bedroom finished basement rental. Street parking on Tyler ave between Kellogg and Jersey | 1 | Sara Merker 269-568-4455 | |||||||||||||||||||||||
20 | 5/20/22 | 8317 N Swenson St. | Airbnb 1 bedroom rental application. Guests park in driveway | 1 | Russell Kalita 503-998-2687 | |||||||||||||||||||||||
21 | 5/25/22 | Kelley Point Park | In a landscape concert happening 8/13, private event. | n/a | https://www.eventbrite.com/o/in-a-landscape-10898118534 | https://www.eventbrite.com/e/sold-out-in-a-landscape-kelley-point-park-600pm-sat-813-tickets-311584556797?aff=ebdsoporgprofile | ||||||||||||||||||||||
22 | 6/14/2022 | 9405 N Ivanhoe St | Intent to demolish structure. | unknown | kevinp@gorge.net | |||||||||||||||||||||||
23 | 6/15/2022 | 6917 N Bank St | Intent to demolish structure. | unknown | garrett@dezdevelopment.com | |||||||||||||||||||||||
24 | 7/6/22 | 7840 N UPLAND DRIVE | The applicant is seeking a Lot Validation Review to establish a unit of land that is not recognized by the City as a legal lot or lot of record. T | unknown | sarah@stratalanduse.com | https://www.portlandoregon.gov/bds/article/800066 | ||||||||||||||||||||||
25 | 8/17/22 | 8107 N Syracuse St. | submitted an application for a development permit, including removal of a tree 36" in diameter or greater, for the property located at 8107 N Syracuse St. Description of tree to be removed: 36 inch in diameter tree located at the left rear (Northern Corner) of the lot. | unknown | garrett@dezdevelopment.com | |||||||||||||||||||||||
26 | 8/19/22 | 11020 W/ N LOMBARD ST (Access through 11040 N Lombard St) | The Project involves installing six new 14-foot by 14-foot mooring structures landward of Berth 416 at the Port of Portland’s Terminal 4 to provide mooring for a USNS Bob Hope-Class vehicle cargo ship or equivalent. The Project also includes the installation of new electrical equipment to serve the moored vessel(s) and security fencing, both in the paved upland parking area. | N/a | sydg@gretteassociates.com | https://www.portlandoregon.gov/bds/article/800474 | ||||||||||||||||||||||
27 | 8/5/22 | 7040 N Leonard St | Intent to demolish structure. | unknown | garrett@dezdevelopment.com | |||||||||||||||||||||||
28 | 8/9/2022 | EV Code Project | City hearing 9/13 12:30pm to discuss The Bureau of Planning and Sustainability (BPS) to require all new multi-dwelling and mixed use development with five or more units - that include onsite parking - to provide Electic Vehicle charging infastructure at higher rates than required by state rules. | N/a | Phil.nameny@portlandoregon.gov | portland.gov/bps/ev-ready | ||||||||||||||||||||||
29 | 7/28/22 | 8327 N Swenson St. | Intent to demolish structure. | unknown | garrett@dezdevelopment.com | |||||||||||||||||||||||
30 | 8/12/22 | PIR | Grand Prix of Portland noise variance notice 9/1 - 9/4 | N/a | Ron Huegil 503-823-5899 | |||||||||||||||||||||||
31 | 8/30/22 | Planning and Sustainability Commission Hearing on Floodplain Resilience | Updates floodplain regulations throughout the city to ensure that new development in the floodplain addresses flood risk from a changing climate, does not jeopardize threatened and endangered species, and allows Portlanders to continue to obtain federally backed flood insurance. | N/a | floodplainproject@portlandoregon.gov | https://www.portland.gov/bps/planning/environ-planning/floodplain-project | ||||||||||||||||||||||
32 | 8/30/22 | Neighborhood Profile Map (2020 census data) | Civic Life profliing of neighborhoods | N/a | CivicLife@PortlandOregon.gov | https://www.portland.gov/sites/default/files/2022/st_johns_civiclife.pdf | ||||||||||||||||||||||
33 | 1/19/2023 | East Columbia: 720 N Hayden Meadows | Replace existing office and shop as add on to existing freight movement facility | Jerich Bankston jerichob@vlmk.com | ||||||||||||||||||||||||
34 | 1/242023 | Kenton 7620 N Delaware | Trinity Adademy to convert former K-8 school to 6-12. Proposal includes demo of church building and rectory | Debbie Ceek | ||||||||||||||||||||||||
35 | 2/1/2023 | Piedmont 7205 NE MLK | Convert existing building to cabinet making business | James Alan artisanwoodworking@comcast.net | ||||||||||||||||||||||||
36 | ||||||||||||||||||||||||||||
37 | ||||||||||||||||||||||||||||
38 | ||||||||||||||||||||||||||||
39 | ||||||||||||||||||||||||||||
40 | ||||||||||||||||||||||||||||
41 | ||||||||||||||||||||||||||||
42 | ||||||||||||||||||||||||||||
43 | ||||||||||||||||||||||||||||
44 | ||||||||||||||||||||||||||||
45 | ||||||||||||||||||||||||||||
46 | ||||||||||||||||||||||||||||
47 | ||||||||||||||||||||||||||||
48 | ||||||||||||||||||||||||||||
49 | ||||||||||||||||||||||||||||
50 | ||||||||||||||||||||||||||||
51 | ||||||||||||||||||||||||||||
52 | ||||||||||||||||||||||||||||
53 | ||||||||||||||||||||||||||||
54 | ||||||||||||||||||||||||||||
55 | ||||||||||||||||||||||||||||
56 | ||||||||||||||||||||||||||||
57 | ||||||||||||||||||||||||||||
58 | ||||||||||||||||||||||||||||
59 | ||||||||||||||||||||||||||||
60 | ||||||||||||||||||||||||||||
61 | ||||||||||||||||||||||||||||
62 | ||||||||||||||||||||||||||||
63 | ||||||||||||||||||||||||||||
64 | ||||||||||||||||||||||||||||
65 | ||||||||||||||||||||||||||||
66 | ||||||||||||||||||||||||||||
67 | ||||||||||||||||||||||||||||
68 | ||||||||||||||||||||||||||||
69 | ||||||||||||||||||||||||||||
70 | ||||||||||||||||||||||||||||
71 | ||||||||||||||||||||||||||||
72 | ||||||||||||||||||||||||||||
73 | ||||||||||||||||||||||||||||
74 | ||||||||||||||||||||||||||||
75 | ||||||||||||||||||||||||||||
76 | ||||||||||||||||||||||||||||
77 | ||||||||||||||||||||||||||||
78 | ||||||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||||
100 |