ABCDEFGHIJKLMNOPQRSTUVWXYZ
1
Fill in the highlighted areas with your production data for a single shift. In some cases, you may have to convert units to simplify the calculation. For example, 3600 PPH (Pieces per Hour) is 60 PPM (Pieces per Minute).
2
3
4
Production Data
5
Shift Length8Hours =480Minutes
6
Short Breaks2Breaks @15Minutes Each =30Minutes Total
7
Meal Break1Breaks @30Minutes Each =30Minutes Total
8
Down Time47Minutes
9
Ideal Run Rate60
PPM (Pieces Per Minute)
10
Total Pieces19.271Pieces
11
Reject Pieces423Pieces
12
13
14
Support VariableCalculationResult
15
Planned
Production Time
Shift Length - Breaks
420Minutes
16
Operating Time
Planned Production Time - Down Time
373Minutes
17
Good Pieces
Total Pieces - Reject Pieces
18.848Pieces
18
19
20
OEE FactorCalculationMy OEE%
21
Availability
Operating Time / Planned Production Time
88,81%
22
Performance
(Total Pieces / Operation Time) / Ideal Run Rate
86,11%
23
Quality
Good Pieces / Total Pieces
97,80%
24
Overall OEE
Availability x Performance x Quality
74,79%
25
26
27
OEE FactorWorld ClassMy OEE%
28
Availability90,00%88,81%
29
Performance95,00%86,11%
30
Quality99,90%97,80%
31
Overall OEE85,00%74,79%
32
33
34
World Class Overall OEE for discrete manufacturing plants is generally considered to be 85% or better. Studies indicate that the average Overall OEE score for discrete manufacturing plants is approximately 60%.
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100