1 | SBG Action Tracking Log | |||||||||||||||||||||
2 | SBG-HSE-CORP-FR-EN-214 | |||||||||||||||||||||
3 | Issue/Modified Date | Mar.2025 | Rev. | 03 | ||||||||||||||||||
4 | Item No. | DATE ENTERED | Project | Reported by | Source | Classfication | Hazard Cat. | Priority | Consequance | Issue | Type | Action | Closing Target Date | Responsible | Status | Evidence | Closed Date | Verification | Comment | NOTES | ||
5 | 1 | 2024-06-10 | CUC | anonymous | Hazard Report | Compliance | Welfare | Medium | Reputation | لا يوجد مواقف للموظفين ولا يوجد مواقف قريبة و اقرب موقف يبعد مسافة ١٥ دقيقة مشي و عند الوصول للموقع لا يمكننا استخدام المصعد و هذا متعب و مرهق للموظف | Unsafe Condition | مخاطبة إدارة المشروع لحل المشكلة | 2024-06-11 | Implementation | Closed | 2024-06-11 | الاتفاق مع إدارة المشروع لتوفير باصات للموظفين تنقلهم الي المشروع كما تم زيادة عدد المصاعد وجاري استكمال تركيبها | |||||
6 | 2 | 2024-06-11 | CUC | anonymous | Hazard Report | Compliance | Welfare | Medium | People | المكاتب الدور الثالث والرابع لا يوجد نظام smoke managment system لا يوجد هواء نقي في المكاتب لا يوجد صابون في الحمامات اغلب الحمامات لا تعمل لايوجد شفط هواء من داخل الحمامات المصعد لا يعمل المصعد لا يعمل المصعد لا يعمل لا يوجد مياه للشرب | Unsafe Condition | تنفيذ تفتيش عاجل (HSE/MEP/المرافق) لتقييم الامتثال لأنظمة السلامة من الحريق (Smoke Management / Sprinklers) وإعداد خطة تصحيح معتمدة، واستكمال/إصلاح الأنظمة طبقا للكود، مع إعادة اختبار/تشغيل المصاعد والتهوية وتوفير مياه الشرب، وإغلاق الملاحظة بأدلة وصور وتقارير اختبار. | 2024-06-12 | Implementation | Closed | 2024-06-12 | تم مخاطبة مدير المشروع وتم التكليف بحل المشاكل وتم التأكد من ذلك | |||||
7 | 3 | 2024-07-01 | CUC | anonymous | Hazard Report | Compliance | Welfare | Medium | People | "المكاتب في الدور الثالث 1- مياه الصرف تخرج من ماسورة الصرف في المطبخ وتملأ الممرات وابواب المكاتب 2- لايوجد مياه للشرب للموظفين 3- لا يوجد صابون في الحمامات 4- اغلب الحمامات لاتعمل بسبب عدم انهاء تركيباتها وبعضها الباب لايقفل بسبب سوء التنفيذ " | Unsafe Condition | عزل المنطقة المتأثرة فورًا، إصلاح التسريب/الانسداد، تنفيذ تنظيف وتعقيم، واستكمال/إصلاح مرافق الحمامات والأبواب (أقفال/مفصلات). تنفيذ تفتيش قبول بعد الإصلاح وتوثيق الإغلاق | 2024-07-02 | Implementation | Closed | 2024-07-02 | تم مخاطبة مدير المشروع وتم التكليف بحل المشاكل وتم التأكد من ذلك | |||||
8 | 4 | 2024-07-02 | CUC | anonymous | Hazard Report | Compliance | Welfare | Medium | People | ايوجد صابون وشطافات الحمامات خربانة بالدور الرابع | Unsafe Condition | توفير الصابون ومستلزمات النظافة فورًا، وإصلاح/استبدال الشطافات المعطلة. تعيين مسؤول متابعة يومية وتوثيق ذلك ضمن قائمة تفتيش المرافق. | 2024-07-03 | Implementation | Closed | 2024-07-03 | تمت اعمال الصيانة وتوفير الصابون | |||||
9 | 5 | 2024-08-18 | CUC | anonymous | Hazard Report | Compliance | Welfare | Medium | Reputation | الرجاء ايضاح آلية توزيع مواقف السيارات في المبنى بشكل واضح وعلني حفاظاً على الشفافية ودرءاً لأي شبهة فساد اداري ومحسوبية في توزيع تصايح المواقف. حيث انه عند طلب مدراء الاقسام لتصريح موقف تم اجباتنا بعدم توفر اماكن فارغة ونتفاجئ حالياً بأن تصاريح جديدة صدرت لرسامين وومدققي بيانات لمجرد علاقتهم الشخصية من قريب او من بعيد بمن يصدر التصاريح. الرجاء التوضيح | Unsafe Condition | إصدار سياسة مكتوبة لتوزيع تصاريح المواقف (معايير/أولوية/اعتماد/سحب) وتعميمها على الموظفين، مع قناة تظلمات ومراجعة دورية للالتزام | 2024-08-20 | Implementation | Closed | 2024-08-20 | تم مخاطبة إدارة المشروع والامن وتم التوضيح بان المواقف الموجودة جميعها تخص مالك المشروع (عناية) كما تم تطبيق الية توصيل الموظفين عن طريق الباصات | |||||
10 | 6 | 2024-09-19 | CUC | anonymous | Hazard Report | Compliance | Welfare | Medium | Asset | شركة موقف تسحب السيارات عند بوابة المكاتب بمجرد نزول الموظف لعمل البصمة في اقل من دقيقتين على وقوف السيارة مطلوب من ادارة المبنى وقسم السلامة الاتفاق مع شركة موقف على عدم سحب السيارات او مخالفتها الا اذا تعدى وقت الوقوف 5 دقائق | Unsafe Condition | وضع لوحات إرشادية عند البوابة بمنع الدخول لغير موظفي المشروع ، وتكليف الامن بمنع وقوف أي سيارة امام المشروع | 2024-09-21 | Implementation | Closed | 2024-09-21 | بعد المتابعة مع فريق الامن اتضح ان الموظفين من مشاريع خارجية ويقوموا بالدخول الي المشروع لتوثيق بصمتهم ثم الخروج امن المشروع | |||||
11 | 7 | 2024-12-07 | CUC | anonymous | Hazard Report | Compliance | Welfare | Medium | People | عدم توفر مياه للشرب في الدور الثالث | Unsafe Condition | توفير مياه للشرب | 2024-12-07 | Implementation | Closed | 2024-12-07 | بعد مخاطبة مدير المشروع اتضح انهم غير تابعين لقوة المشروع وعليه تم مخاطبة المسؤول عنهم وتم توفير عربات لنقل المياه لهم من مستودعهم وضمان وصولها وتوزيعها | |||||
12 | 8 | 2024-12-17 | CUC | HSE Team | Drill | HSE Observations | Falls from height | Medium | People | تأخراخلاء المصاب: تأخر فريق الانقاذ في عملية اخلاء المصاب لمدة 7 دقائق عن الوقت المخطط له ، بسبب عدم ملائمة حجم النقالة مع عرض السلم. | Unsafe Condition | يوصى بتوفير نقالة ذات حجم أصغر وأكثر توافقاً مع المساحات الضيقة لضمان سرعة وكفاءة عمليات اإلخالء في المستقبل | 2024-12-24 | مسؤول السلامة | Closed | 2024-12-24 | ||||||
13 | 9 | 2025-01-05 | CUC | Consultant(Ali Mukhtar) | Inspection | Non-Conformity (NC) | Fire and explosion | MEDIUM | Envirmental | يوجد تسريب داخلي وخارجي في صمام العزل الخاص بمضخة الحريق | Unsafe Condition | تم تغيير صمام العزل ومعالجة التسريب | 3/16/2025 | SALAMATIC | Closed | 1/8/2025 | ||||||
14 | 10 | 2025-01-05 | CUC | Consultant(Ali Mukhtar) | Inspection | Non-Conformity (NC) | Fire and explosion | MEDIUM | People | معايرة المحبس الخاص بصندوق الحريق | Unsafe Condition | تم معايرة المحبس وصيانة القاذف لتمكن من سهولة استخدامة | 3/27/2025 | SALAMATIC | Closed | 1/8/2025 | ||||||
15 | 11 | 2025-01-05 | CUC | Consultant(Ali Mukhtar) | Inspection | Non-Conformity (NC) | Fire and explosion | MEDIUM | Asset | خرطوم صندوق الحريق تالف | Unsafe Condition | تم استبدال الخرطوم | 5/31/2025 | SALAMATIC | Closed | 1/8/2025 | ||||||
16 | 12 | 2025-01-07 | CUC | DAR | Hazard Report | HSE Observations | Falls from height | High | People | It has been observed that workers were working without safe platform. The workers were standing on top of pipeline without any protection measures. This practice poses significant risk of serious injury due to falls from height . | Unsafe Act | TBT has been conducted for work at height safety. And instructed to do not stand on pipeline. | 2/7/2025 | On-Site Safety Team | Closed | 3/7/2025 | ||||||
17 | 13 | 2025-01-07 | CUC | DAR | Hazard Report | Non Compliance | Falls from height | Medium | People | Another similar observation with supporting picture in other location of unsafe act from workers working at height not using them safety safety harness , Raises the same corrective action of above observation to mitigate the risk effectively | Unsafe Act | TBT has been conducted for work at height safety and instructed to wear full body harness while working at height. | 2/7/2025 | On-Site Safety Team | Closed | 3/7/2025 | ||||||
18 | 14 | 2025-01-07 | CUC | DAR | Hazard Report | Non Compliance | Falling objects | Medium | People | It has been observed unsafe stored of plywoodstanding in poor condition , that may fall and hit workers , moreover block the access also having a risk of falling object leading injuries | Unsafe Act | Materials has bee secured properly. | 2/7/2025 | Construcion Team | Closed | 3/7/2025 | ||||||
19 | 15 | 2025-01-07 | CUC | DAR | Hazard Report | Non Compliance | Human Behavior | Medium | People | Another similar observation with supporting pictureof unsafe condition of steel can fall and hit workers , Raises the same corrective action of above observation to mitigate the risk effectively | Unsafe Act | That steel materials has been removed. | 2/7/2025 | Construcion Team | Closed | 3/7/2025 | ||||||
20 | 16 | 2025-01-07 | CUC | DAR | Hazard Report | Non Compliance | Human Behavior | Medium | People | Another similar observation with supporting pictureof unsafe condition of lighting with poor installation can fall and hit workers , Raises the same corrective action of above observation to mitigate the risk effectively | Unsafe Act | That light has been removed. | 2/7/2025 | Electrical department | Closed | 3/7/2025 | ||||||
21 | 17 | 2025-01-07 | CUC | DAR | Hazard Report | Non Compliance | Human Behavior | High | People | It has been observed that unsafe storage of materials , this practice poses a significant risk of serious injury due to poor storage of materials | Unsafe Act | All loose materials has been removed from box. | 2/7/2025 | MEP. Department | Closed | 3/7/2025 | ||||||
22 | 18 | 2025-01-07 | CUC | DAR | Hazard Report | Non Compliance | Human Behavior | Medium | People | Another similar observation with supporting pictureof unsafe condition of poor material management , Raises the same corrective action of above observation to mitigate the risk effectively | Unsafe Act | Materials has been removed. | 2/7/2025 | Scaffolding Team | Closed | 3/7/2025 | ||||||
23 | 19 | 2025-01-07 | CUC | DAR | Hazard Report | Non Compliance | Slips/trips/falls | Medium | People | Another similar observation with supporting pictureof unsafe condition of poor housekeeping , Raises the same corrective action of above observation to mitigate the risk effectively | Unsafe Condition | Housekeeping has been done.Materials has been secure properly. | 2/7/2025 | Construcion Team | Closed | 3/7/2025 | ||||||
24 | 20 | 2025-01-07 | CUC | DAR | Hazard Report | Non Compliance | Human Behavior | Medium | People | Another similar observation with supporting pictureof unsafe condition of poor material management , Raises the same corrective action of above observation to mitigate the risk effectively | Unsafe Act | Laddder has been removed. | 2/7/2025 | Construcion Team | Closed | 3/7/2025 | ||||||
25 | 21 | 2025-01-07 | CUC | DAR | Hazard Report | Non Compliance | Human Behavior | Medium | People | Another similar observation with supporting pictureof unsafe condition of poor material management , Raises the same corrective action of above observation to mitigate the risk effectively | Unsafe Act | Materials has been removed. | 2/7/2025 | Construcion Team | Closed | 3/7/2025 | ||||||
26 | 22 | 2025-01-07 | CUC | DAR | Hazard Report | Non Compliance | Human Behavior | Medium | People | Another similar observation with supporting pictureof unsafe condition of poor material management , Raises the same corrective action of above observation to mitigate the risk effectively | Unsafe Act | Materials has been removed. | 2/7/2025 | Construcion Team | Closed | 3/7/2025 | ||||||
27 | 23 | 2025-01-07 | CUC | DAR | Hazard Report | Non Compliance | Slips/trips/falls | Medium | People | Another similar observation with supporting pictureof unsafe condition of poor housekeeping , Raises the same corrective action of above observation to mitigate the risk effectively | Unsafe Condition | Materials has been removed. | 2/7/2025 | Construcion Team | Closed | 3/7/2025 | ||||||
28 | 24 | 2025-01-07 | CUC | DAR | Hazard Report | HSE Observations | Asphyxiation/drowning | High | People | It has been observed that stagnant water accumulated on the tunnel access , creating unsanitary conditions and increasing the risk of contamination , and potential breeding of harmful bacteria and pests. | Unsafe Act | Water has been removed. | 2/7/2025 | Construcion Team | Closed | 3/7/2025 | ||||||
29 | 25 | 2025-01-07 | CUC | DAR | Hazard Report | Non Compliance | Human Behavior | Medium | People | Another similar observation with supporting pictureof unsafe condition stagnant water , Raises the same corrective action of above observation to mitigate the risk effectively | Unsafe Act | Water has been removed. | 2/7/2025 | Construcion Team | Closed | 3/7/2025 | ||||||
30 | 26 | 2025-01-07 | CUC | DAR | Hazard Report | Non Compliance | Human Behavior | Medium | People | Another similar observation with supporting pictureof unsafe condition stagnant water , Raises the same corrective action of above observation to mitigate the risk effectively | Unsafe Act | Water has been removed. | 2/7/2025 | Construcion Team | Closed | 3/7/2025 | ||||||
31 | 27 | 2025-01-07 | CUC | DAR | Hazard Report | HSE Observations | Electricity | Urgent | Asset | It has been observed an energized cable was trailing through metallic parts without proper protection that could damage the cables insulation increasing the risk of electrical shock or fire | Unsafe Act | Cable has been removed. | 2/7/2025 | MEP. Department | Closed | 3/7/2025 | ||||||
32 | 28 | 2025-01-07 | CUC | DAR | Hazard Report | Non Compliance | Electricity | High | People | Another similar observation with supporting pictureof unsafe condition energized cable , Raises the same corrective action of above observation to mitigate the risk effectively | Unsafe Act | Cable has been removed. | 2/7/2025 | MEP. Department | Closed | 3/7/2025 | ||||||
33 | 29 | 2025-01-07 | CUC | DAR | Hazard Report | Non Compliance | Electricity | High | People | Another similar observation with supporting pictureof unsafe condition energized cable , Raises the same corrective action of above observation to mitigate the risk effectively | Unsafe Act | cable has been fixed properly with plug. | 2/7/2025 | MEP. Department | Closed | 3/7/2025 | ||||||
34 | 30 | 2025-01-07 | CUC | DAR | Hazard Report | Non Compliance | Electricity | High | People | Another similar observation with supporting pictureof unsafe condition energized cable , Raises the same corrective action of above observation to mitigate the risk effectively | Unsafe Act | Light has been removed. | 2/7/2025 | Electrical department | Closed | 3/7/2025 | ||||||
35 | 31 | 2025-01-07 | CUC | DAR | Hazard Report | Non Compliance | Electricity | High | People | Another similar observation with supporting pictureof unsafe condition energized cable , Raises the same corrective action of above observation to mitigate the risk effectively | Unsafe Act | Charger has been removed from site. TBT has been condcuted for the issue and instructed to do not use charger at workplace area . | 2/7/2025 | On-Site Safety Team | Closed | 3/7/2025 | ||||||
36 | 32 | 2025-01-07 | CUC | DAR | Hazard Report | HSE Observations | Human Behavior | Medium | People | It has been observed workers was not adhering to mandatory ppe requirements specially failing to weraing hand gloves while working | Unsafe Act | TBT has been conducted for proper use of PPE. | 2/7/2025 | On-Site Safety Team | Closed | 3/7/2025 | ||||||
37 | 33 | 2025-01-07 | CUC | DAR | Hazard Report | HSE Observations | Human Behavior | Medium | People | It has been observed workers was not adhering to mandatory ppe requirements specially failing to weraing ear plug while working in chiller | Unsafe Act | TBT has been conducted for proper use of PPE. | 2/7/2025 | On-Site Safety Team | Closed | 3/7/2025 | ||||||
38 | 34 | 2025-01-07 | CUC | DAR | Hazard Report | HSE Observations | Human Behavior | Medium | People | It has been observed poor storage area and workers working in the thunne access. This practice may lead to block the access during emergency evacuation | Unsafe Act | Access has been cleared. Materials has been removed from access.TBT has been conducted for the and instructed to do not block the access. | 2/7/2025 | Construcion Team | Closed | 3/7/2025 | ||||||
39 | 35 | 2025-01-07 | CUC | DAR | Hazard Report | HSE Observations | Asphyxiation/drowning | High | People | It has been observed working area with inadequate lighting in the tunnel 4 . That may lead to increased chance of hit workerswill working and cause serious injury | Unsafe Condition | Adequate illumination has been provided. | 2/7/2025 | Electrical department | Closed | 3/7/2025 | ||||||
40 | 36 | 2025-01-07 | CUC | DAR | Hazard Report | HSE Observations | Asphyxiation/drowning | High | People | It has been observed working area with inadequate lighting in the tunnel 4 . That may lead to increased chance of hit workerswill working and cause serious injury | Unsafe Condition | Adequate illumination has been provided. | 2/7/2025 | Electrical department | Closed | 3/7/2025 | ||||||
41 | 37 | 2025-01-14 | CUC | HSE Team | Drill | HSE Observations | Human Behavior | Medium | People | تم تسجيل تأخير زمني مدته خمس (5) دقائق مقارنة بالوقت المخطط لتنفيذ خطوات الاستجابة الواردة في سيناريو التمرين. | Unsafe Act | تم تدريب المشاركين على إجراءات الاستجابة لحوادث تسرب المواد الكيميائية وفق سيناريو التمرين المعتمد . | 2025-01-23 | مسؤول السلامة | Closed | 2025-01-23 | YES | Issue | ||||
42 | 38 | 2025-01-20 | CUC | HSE Team | COMMITTEE MEETING | HSE Observations | Human Behavior | Medium | People | الابلاغ عن الحوادث | Unsafe Act | تم مناقشة اهمة الابلاغ عن الحوادث | 2025-01-28 | مسؤول السلامة والتنفيذ | Closed | 2025-01-28 | YES | |||||
43 | 39 | 2025-01-20 | CUC | HSE Team | COMMITTEE MEETING | HSE Observations | Human Behavior | Medium | People | خطة العمل | Unsafe Act | تم مناقشة خطة الاعمال والاعمال الحرجة وطرق التحكم السيطرة | 2025-01-28 | مسؤول السلامة والتنفيذ | Closed | 2025-01-28 | YES | |||||
44 | 40 | 2025-01-20 | CUC | HSE Team | COMMITTEE MEETING | HSE Observations | Human Behavior | Medium | People | مقاولي الباطن | Unsafe Act | رفع كفاءة وثقافة السلامة لمقاولي الباطن | 2025-01-28 | مسؤول السلامة والتنفيذ | Closed | 2025-01-28 | YES | |||||
45 | 41 | 2025-01-20 | CUC | HSE Team | COMMITTEE MEETING | OFI | Human Behavior | Medium | People | التحسينات | Unsafe Act | المناطق التي تحتاج الى تحسين بالمشروع | 2025-01-28 | مسؤول السلامة والتنفيذ | Closed | 2025-01-28 | YES | |||||
46 | 42 | 2025-01-20 | CUC | HSE Team | COMMITTEE MEETING | HSE Observations | Human Behavior | Medium | People | المرافق والخدمات | Unsafe Act | مواقف السيارات وتخصيص موقف لسيارة الاسعاف | 2025-01-28 | مسؤول السلامة والتنفيذ | Closed | 2025-01-28 | YES | |||||
47 | 43 | 2025-01-20 | CUC | HSE Team | COMMITTEE MEETING | HSE Observations | Security | Medium | People | الامن | Unsafe Act | جولات الامن لتفقد اماكن النوم غير المنظمة | 2025-01-28 | مسؤول السلامة والتنفيذ | Closed | 2025-01-28 | YES | |||||
48 | 44 | 2025-01-20 | CUC | HSE Team | COMMITTEE MEETING | HSE Observations | Human Behavior | Medium | People | احتياجات العمل | Unsafe Act | تم مناقشة احتياجات العمال وكيفية تلبيتها | 2025-01-28 | مسؤول السلامة والتنفيذ | Closed | 2025-01-28 | YES | |||||
49 | 45 | 2025-01-20 | CUC | HSE Team | COMMITTEE MEETING | HSE Observations | Human Behavior | Medium | People | مناطق الراحة | Unsafe Act | توسيع مناطق الراحة لتناسب اعداد العماال | 2025-01-28 | مسؤول السلامة والتنفيذ | Closed | 2025-01-28 | YES | |||||
50 | 46 | 2025-01-25 | CUC | HSE Team | COMMITTEE MEETING | HSE Observations | Electricity | High | People | Cables trailing through metallic structures without protection. | Unsafe Act | Provide adequate 'S-Frames' or other suitable cable support systems to safely elevate cables over metallic structures | 2025-01-28 | مسؤول السلامة والتنفيذ | Closed | 2025-01-28 | YES | Issue | ||||
51 | 47 | 2025-01-25 | CUC | HSE Team | Hazard Report | HSE Observations | Electricity | High | People | Cables trailing through wet environments or accumulated water. | Unsafe Act | Reroute cables away from wet areas and install protective conduits or overhead routing systems | 2025-01-28 | مسؤول السلامة والتنفيذ | Closed | 2025-01-28 | YES | Issue | ||||
52 | 48 | 2025-01-25 | CUC | HSE Team | Hazard Report | HSE Observations | Electricity | High | People | Exposed (naked) cables with no insulation. | Unsafe Condition | Immediately insulate all exposed cables or enclose them in protective sheathing | 2025-01-28 | مسؤول السلامة والتنفيذ | Closed | 2025-01-28 | YES | Issue | ||||
53 | 49 | 2025-01-25 | CUC | HSE Team | Hazard Report | HSE Observations | Electricity | High | People | Cables trailing across worker walkways. | Unsafe Act | Install cable guards or elevate cables above pedestrian paths | 2025-01-28 | مسؤول السلامة والتنفيذ | Closed | 2025-01-28 | YES | Issue | ||||
54 | 50 | 2025-01-25 | CUC | HSE Team | Hazard Report | HSE Observations | Electricity | High | People | Cable connected to an electrical panel without a proper plug. | Unsafe Act | Ensure all cables are fitted with proper plugs and securely connected | 2025-01-28 | مسؤول السلامة والتنفيذ | Closed | 2025-01-28 | YES | Issue | ||||
55 | 51 | 2025-01-25 | CUC | HSE Team | Hazard Report | HSE Observations | Electricity | High | Asset | Damaged or cut electrical cables. | Unsafe Condition | Replace or properly repair damaged cables using appropriate insulation connectors | 2025-01-28 | مسؤول السلامة والتنفيذ | Closed | 2025-01-28 | YES | Issue | ||||
56 | 52 | 2025-01-25 | CUC | HSE Team | Hazard Report | HSE Observations | Electricity | High | Asset | Cables connected to damaged electrical sockets or plugs. | Unsafe Condition | Replace defective plugs and sockets and ensure routine inspections | 2025-01-28 | مسؤول السلامة والتنفيذ | Closed | 2025-01-28 | YES | Issue | ||||
57 | 53 | 2025-01-25 | CUC | HSE Team | Hazard Report | HSE Observations | Electricity | High | People | Weak supervision of electrical cable management on-site. | Unsafe Act | Strengthen HSE supervision and conduct routine safety inspections | 2025-01-28 | مسؤول السلامة والتنفيذ | Closed | 2025-01-28 | YES | Issue | ||||
58 | 54 | 2025-01-25 | CUC | HSE Team | Hazard Report | HSE Observations | Electricity | High | People | Lack of worker training on proper cable management. | Unsafe Condition | Conduct awareness sessions and refresher training for workers and supervisors on safe cable handling | 2025-01-28 | مسؤول السلامة والتنفيذ | Closed | 2025-01-28 | YES | Issue | ||||
59 | 55 | 2025-01-25 | CUC | DAR | Inspection | Non-Conformity (NC) | Electricity | High | People | 1-Electrical cables were observed trailing through metallic structures, such as scaffolding and pipelines, exposing the cables to potential damage from sharp edges. 2- Electrical cables were found trailing through areas with accumulated water. 3- Electrical cables were observed in an exposed state, with no insulation or protective sheathing. 4- Cables were trailing across worker walkways and passage routes. | Unsafe Condition | 1- Manage all cables and develop systems to either provide protective covers or route them at an elevation (e.g., overhead) away from moving or projecting equipment. 2- Provide sufficient number of S wooden frames or other appropriate cable support systems to ensure that the cables pass safely over metallic structures. 3- Exposed cables need to be immediately insulated or placed in protective sheathing to ensure there is no contact with live parts. 4- All unprotected cable ends need to be capped or insulated. 5- Use of cable guards or covers to ensure that cables do not create trip hazards. 6- Conduct workshop/refresher training to workers regarding the risks of trailing cables and proper cable management techniques. Same training to be delivered to the HSE team and supervision to perform their duties in preventing similar breaches | 1/28/2025 | Baraa Qattan | Closed | https://sbgo365-my.sharepoint.com/personal/hse_director_office_sbg_com_sa/_layouts/15/onedrive.aspx?id=%2Fpersonal%2Fhse%5Fdirector%5Foffice%5Fsbg%5Fcom%5Fsa%2FDocuments%2FArchive%2FProjects%2FCUC%2FSBG%20Action%20Tracking&ga=1 | 2/10/2025 | |||||
60 | 56 | 2025-01-27 | CUC | HSE Team | Hazard Report | HSE Observations | Electricity | High | People | energized Cable trailing through Metal Parts . Observation raised in Dar WCUC-19-09-24-11 | Unsafe Act | Cable has been removed | 2025-01-25 | مسؤول السلامة والتنفيذ | Closed | 2025-01-25 | YES | Issue | ||||
61 | 57 | 2025-01-27 | CUC | HSE Team | Hazard Report | HSE Observations | Electricity | High | People | Exposed (naked) cable at the site . Observation raised in Dar WCUC-21-11-24-10 | Unsafe Condition | That cable has bee removed. | 2025-01-25 | مسؤول السلامة والتنفيذ | Closed | 2025-01-25 | YES | Issue | ||||
62 | 58 | 2025-01-27 | CUC | HSE Team | Hazard Report | HSE Observations | Electricity | High | Asset | Damaged cable plug was being used at the site . Observation raised in Dar WCUC-01-01-25-04 | Unsafe Condition | Plug has been replaced. Inspection has been done for extension cable & plug | 2025-01-25 | مسؤول السلامة والتنفيذ | Closed | 2025-01-25 | YES | Issue | ||||
63 | 59 | 2025-01-27 | CUC | HSE Team | Hazard Report | HSE Observations | Falls from height | Medium | People | Energized cables trailing through scaffolding structure . raised in Dar WCUC-10-10-24-36 | Unsafe Act | Cable has been removed | 2025-01-25 | مسؤول السلامة والتنفيذ | Closed | 2025-01-25 | YES | Issue | ||||
64 | 60 | 2025-01-27 | CUC | HSE Team | Hazard Report | HSE Observations | Falls from height | Medium | People | Energized cables trailing through metallic parts have a sharp edge. raised in Dar WCUC-12-12-24-14 | Unsafe Act | Cable has been removed | 2025-01-25 | مسؤول السلامة والتنفيذ | Closed | 2025-01-25 | YES | Issue | ||||
65 | 61 | 2025-01-27 | CUC | HSE Team | Hazard Report | HSE Observations | Electricity | High | People | Repeated Observations of Electrical Cable safety management raised as regular in weekly HSE Meeting with the contractor MOM-11-12-2024 | Unsafe Act | training has been conducted for electrical safety with involving FM & HSE Personnel | 2025-01-25 | مسؤول السلامة والتنفيذ | Closed | 2025-01-25 | YES | Issue | ||||
66 | 62 | 2025-01-27 | CUC | HSE Team | Hazard Report | HSE Observations | Electricity | High | People | Broken Cable Plug connected to electrical panel . Observation raised in Dar WCUC-19-09-24-10 | Unsafe Condition | lug has been replaced with newp Plug | 2025-01-25 | مسؤول السلامة والتنفيذ | Closed | 2025-01-25 | YES | Issue | ||||
67 | 63 | 2025-02-12 | CUC | HSE Team | Drill | HSE Observations | Contact with machinery/hand tools | Medium | People | عدم التزام مسؤول الكهرباء بدوره في سيناريو الفرضية(القيام بقطع التيار الكهربائي ) | Unsafe Act | تدريبه بشكل كافي وتوزيع الادوار | 2025-02-19 | مسؤول السلامة | Closed | 2025-02-19 | YES | Issue | ||||
68 | 64 | 2025-02-12 | CUC | HSE Team | Drill | Non Compliance | Human Behavior | Medium | People | مخالفة بعض العمالة لتعليمات السلامة وقت الاخلاء | Unsafe Act | اجراء المخالفة | 2025-02-19 | مسؤول السلامة | Closed | 2025-02-19 | YES | Issue | ||||
69 | 65 | 2025-01-20 | CUC | HSE Team | COMMITTEE MEETING | HSE Observations | Human Behavior | Medium | People | الاضاءة | Unsafe Act | تم مناقشة مشكلة ضعف الاضاءة في مبنى المبردات | 2025-02-27 | مسؤول السلامة والتنفيذ | Closed | 2025-02-27 | YES | |||||
70 | 66 | 2025-01-20 | CUC | HSE Team | COMMITTEE MEETING | HSE Observations | Health | Medium | People | الضوضاء | Unsafe Act | تم وضع خطة لتحكم غي الضوضاء في مبنى المبردات والمولدات | 2025-02-27 | مسؤول السلامة والتنفيذ | Closed | 2025-02-27 | YES | |||||
71 | 67 | 2025-01-20 | CUC | HSE Team | COMMITTEE MEETING | HSE Observations | Human Behavior | Medium | People | التشجيع والتكريم | Unsafe Act | الية تكريم العمال الملتزمين وتشجيعهم | 2025-02-27 | مسؤول السلامة والتنفيذ | Closed | 2025-02-27 | YES | |||||
72 | 68 | 2025-01-20 | CUC | HSE Team | COMMITTEE MEETING | HSE Observations | Human Behavior | Medium | People | فرضيات | Unsafe Act | تم الاتفاق على جدول فرضيات المشروع | 2025-02-27 | مسؤول السلامة والتنفيذ | Closed | 2025-02-27 | YES | |||||
73 | 69 | 2025-01-20 | CUC | HSE Team | COMMITTEE MEETING | HSE Observations | Human Behavior | Medium | People | المرافق | Unsafe Act | رفع كفاءة منطقة الراحة للعمال | 2025-02-27 | مسؤول السلامة والتنفيذ | Closed | 2025-02-27 | YES | |||||
74 | 70 | 2025-02-19 | CUC | DAR | Inspection | Non-Conformity (NC) | Electricity | High | People | 1- Electrical cables were observed trailing through metallic structures, such as rebar steel, without protective measures. 2- Electrical cables were observed in an exposed state, with no insulation or protective sheathing. 3-Electrical cables was Trailing Through Worker Walkways and heavy equipments routs. 4- Connecting unsafe cables and electrical cable reel directly to the internal switches of the main electrical panels, without cable plug. 5- Uncertified, un-inspected, unsafe and unstable electrical panels & Power tools. | Unsafe Act | 1- Conducting full site inspection to identify and replace damaged electrical cables, tools, and panels. 2- Enforce a structured monthly inspection program for electrical installations, cables, and tools. 3- managing all cables and developing systems to either provide protective covers or route them at an elevation (e.g., overhead) away from moving or projecting equipment (e.g., scaffolding). 4- Provide sufficient number of S wooden frames or other appropriate cable support systems to ensure that the cables pass safely over metallic structures. 5- Using cable guards or covers to ensure that cables do not create trip hazards | 2025-02-22 | Baraa Qattan | Closed | https://sbgo365-my.sharepoint.com/personal/hse_director_office_sbg_com_sa/_layouts/15/onedrive.aspx?id=%2Fpersonal%2Fhse%5Fdirector%5Foffice%5Fsbg%5Fcom%5Fsa%2FDocuments%2FArchive%2FProjects%2FCUC%2FSBG%20Action%20Tracking&ga=1 | 2025-02-23 | |||||
75 | 71 | 2025-03-07 | CUC | SBG | Hazard Report | HSE Observations | Falls from height | Medium | People | Observed during Working at height , and the authorized person or their representative was not present to supervise the work. | Unsafe Act | Warning has been issued to the person. Toolbox talk has been conducted for the issue and instructed to be present at workplace area. | 6/7/2025 | HSE DEPT. | Closed | 6/7/2025 | ||||||
76 | 72 | 2025-03-07 | CUC | SBG | Hazard Report | HSE Observations | Human Behavior | Medium | People | Another similar observation at a different location with supporting picture of workers were observed the authorized person or their representative was not present to supervise the work.. raises the same concerns and requires the same corrective action as the above observation to effectively mitigate the risk. | Unsafe Act | Toolbox talk has been conducted for the issue and instructed to be present at workplace area. | 6/7/2025 | On-Site Safety Team | Closed | 6/7/2025 | ||||||
77 | 73 | 2025-03-07 | CUC | DAR | Hazard Report | HSE Observations | Physical | Medium | People | It has been observed unsecured floor opening without the required safety provisions, creating a severe hazard for workers, passersby, and increasing the risk of falls and accidents. | Unsafe Condition | Floor opening has been secured properly. | 6/7/2025 | MEP. Department | Closed | 6/7/2025 | ||||||
78 | 74 | 2025-03-07 | CUC | DAR | Hazard Report | HSE Observations | Transport | High | Asset | Observed Absence of traffic control & precautions by allowing the heavy equipment moment without availability of flag man as agreed with SBG for escorting process and workers segregation. | Unsafe Act | Instructed flagman to be present with moving equipment always to control the traffic. | 6/7/2025 | On-Site Safety Team | Closed | 6/7/2025 | ||||||
79 | 75 | 2025-03-07 | CUC | DAR | Hazard Report | Non Compliance | Human Behavior | Medium | People | It have been observed that construction and combustible materials were improperly found in unsafe condition. | Unsafe Act | Materials has been removed. | 6/7/2025 | MEP. Department | Closed | 6/7/2025 | ||||||
80 | 76 | 2025-03-07 | CUC | DAR | Hazard Report | Non Compliance | Human Behavior | Medium | People | Another similar observation with supporting picture of unsafe conditions of unsafe material management ,Raises the same concern and requires the same corrective action of above observation to mitigate the risk effectively. | Unsafe Act | Materials has been removed. | 6/7/2025 | MEP. Department | Closed | 6/7/2025 | ||||||
81 | 77 | 2025-03-07 | CUC | DAR | Hazard Report | Non Compliance | Human Behavior | Medium | People | Another similar observation with supporting picture of unsafe conditions of unsafe material management ,Raises the same concern and requires the same corrective action of above observation to mitigate the risk effectively. | Unsafe Act | Materials has been removed. | 6/7/2025 | MEP. Department | Closed | 6/7/2025 | ||||||
82 | 78 | 2025-03-07 | CUC | DAR | Hazard Report | Non Compliance | Slips/trips/falls | Medium | People | Another similar observation with supporting picture of unsafe conditions of Housekeeping ,Raises the same concern and requires the same corrective action of above observation to mitigate the risk effectively. | Unsafe Act | Housekeeping has been done. Area has been clean. | 6/7/2025 | MEP. Department | Closed | 6/7/2025 | ||||||
83 | 79 | 2025-03-07 | CUC | DAR | Hazard Report | Non Compliance | Electricity | High | People | Another similar observation with supporting picture of unsafe conditions of unsafe storage of cable drums without implement the required safety precautions,Raises the same concern and requires the same corrective action of above observation to mitigate the risk effectively. | Unsafe Act | Storage area has been secured. | 6/7/2025 | MEP. Department | Closed | 6/7/2025 | ||||||
84 | 80 | 2025-03-07 | CUC | DAR | Hazard Report | Non Compliance | Human Behavior | Medium | People | Another similar observation with supporting picture of unsafe conditions of unsafe chiller units without implement the required safety precautions,Raises the same concern and requires the same corrective action of above observation to mitigate the risk effectively. | Unsafe Act | Storage area has been secured. | 6/7/2025 | MEP. Department | Closed | 6/7/2025 | ||||||
85 | 81 | 2025-03-07 | CUC | DAR | Hazard Report | HSE Observations | Human Behavior | Medium | Asset | Some workers are not obligated to wear complete personal protective equipment (Helmet & glasses ) while performing manual work, which may expose them to injuries at the site. | Unsafe Act | Toolbox talk has been conducted for the proper use of PPE. | 6/7/2025 | On-Site Safety Team | Closed | 6/7/2025 | ||||||
86 | 82 | 2025-03-07 | CUC | DAR | Hazard Report | Non Compliance | Fire and explosion | High | People | Another similar observation with supporting picture of unsafe condition of welder helper was not wearing the required PPEs (Hot work protiction),Raises the same concern and requires the same corrective action of above observation to mitigate the risk effectively. | Unsafe Act | Toolbox talk has been conducted for the proper use of PPE. | 6/7/2025 | On-Site Safety Team | Closed | 6/7/2025 | ||||||
87 | 83 | 2025-03-07 | CUC | DAR | Hazard Report | HSE Observations | Falls from height | High | People | Worker was observed working on the water supply tanker at height without using full body harnesses. This could result in falls and serious injury. | Unsafe Act | Toolbox talk has been conducted for work at height safety. Instructed to always wear full body harness while filling water on height. | 6/7/2025 | On-Site Safety Team | Closed | 6/7/2025 | ||||||
88 | 84 | 2025-03-07 | CUC | DAR | Hazard Report | HSE Observations | Contact with Chemical | Medium | People | It has been observed that a worker was not adhering to the mandatory PPE requirements while performing work, specifically not wearing a safety mask and glasses and gloves , which increases the worker's vulnerability to potential health hazards and injuries associated with painting materials. Additionally, the work was being performed in an undesignated area. | Unsafe Act | Toolbox talk has been conducted for the proper use of PPE. | 6/7/2025 | On-Site Safety Team | Closed | 6/7/2025 | ||||||
89 | 85 | 2025-03-07 | CUC | DAR | Hazard Report | HSE Observations | Fire and explosion | Urgent | Reputation | ANOTHER SIMILAR OBSERVATION WITH SUPPORTING PICTURE OF GRINDING WORK WITHOUT PROVISION OF FIRE PLANKET TO ISOLATE THE ARAE FROM FLYING SPARKS, REQUIRES SAME IMMEDIATE EFFECTIVE CORRECTIVE ACTIONS AS RECOMMENDED IN PREVIOUS OBSERVATION. | Unsafe Act | Toolbox talk has been conducted for hot work safety and instructed to isolate the area properly with fire blanket. | 6/7/2025 | On-Site Safety Team | Closed | 6/7/2025 | ||||||
90 | 86 | 2025-03-07 | CUC | DAR | Hazard Report | HSE Observations | Human Behavior | High | People | it has been observed that, hand and powered tools are being used on a man lift without being properly secured poses a significant risk of falling from height and could lead to serious incidents. | Unsafe Act | Toolbox talk has been conducted for the falling object issue. Tools carry bag has been provided. | 6/7/2025 | On-Site Safety Team | Closed | 6/7/2025 | ||||||
91 | 87 | 2025-03-07 | CUC | DAR | Hazard Report | HSE Observations | Fire and explosion | Urgent | People | There are obstacles hindering access to the fire hose cabinet. | Unsafe Act | The project management was notified, and all violations blocking the cabinet are being removed | 3/7/2025 | HSE DEPT. | Closed | 3/7/2025 | ||||||
92 | 88 | 2025-03-07 | CUC | DAR | Hazard Report | HSE Observations | Fire and explosion | Urgent | People | **The access path to the fire hose cabinet is blocked.** | Unsafe Condition | The obstacles on the stairs were removed, and the path to the cabinet is now clear. | 3/7/2025 | HSE DEPT. | Closed | 3/7/2025 | ||||||
93 | 89 | 2025-03-07 | CUC | DAR | Hazard Report | HSE Observations | Human Behavior | Medium | People | **There is oil on the nozzle, causing difficulty in its use, especially in opening and closing.** | Unsafe Act | The observation was closed, and a corrective action card was issued (Closed). | 3/7/2025 | HSE DEPT. | Closed | 3/7/2025 | ||||||
94 | 90 | 2025-03-07 | CUC | DAR | Hazard Report | HSE Observations | Human Behavior | Medium | People | **Oil is present on the nozzle, making it difficult to operate, particularly when opening and closing.** | Unsafe Act | The observation was closed, and a corrective action card was issued (Closed). | 3/7/2025 | HSE DEPT. | Closed | 3/7/2025 | ||||||
95 | 91 | 2025-03-07 | CUC | DAR | Hazard Report | HSE Observations | Human Behavior | Medium | People | There is oil on the nozzle, which caused difficulty in using it, particularly in opening and closing. | Unsafe Act | The observation was closed, and a corrective action card was issued (Closed). | 3/7/2025 | HSE DEPT. | Closed | 3/7/2025 | ||||||
96 | 92 | 2025-03-07 | CUC | DAR | Hazard Report | HSE Observations | Human Behavior | Medium | People | **There is oil on the nozzle, which caused difficulty in its use, especially in opening and closing.** | Unsafe Act | The note has been closed and the inspection card has been signed (closed). | 3/7/2025 | HSE DEPT. | Closed | 3/7/2025 | ||||||
97 | 93 | 2025-03-07 | CUC | DAR | Hazard Report | HSE Observations | Human Behavior | Medium | People | **There is oil on the nozzle, which has caused difficulty in using it, particularly when opening and closing.** | Unsafe Act | The note has been closed and the inspection card has been signed (closed). | 3/7/2025 | HSE DEPT. | Closed | 3/7/2025 | ||||||
98 | 94 | 2025-03-07 | CUC | DAR | Hazard Report | HSE Observations | Human Behavior | Medium | People | **There is oil on the nozzle, which has caused difficulty in using it, particularly when opening and closing.** | Unsafe Act | The note has been closed and the inspection card has been signed (closed). | 3/7/2025 | HSE DEPT. | Closed | 3/7/2025 | ||||||
99 | 95 | 2025-03-07 | CUC | DAR | Hazard Report | HSE Observations | Human Behavior | Medium | People | **There is oil on the nozzle, which has caused difficulty in using it, particularly when opening and closing.** | Unsafe Act | The note has been closed and the inspection card has been signed (closed). | 3/7/2025 | HSE DEPT. | Closed | 3/7/2025 | ||||||
100 | 96 | 2025-03-07 | CUC | DAR | Hazard Report | HSE Observations | Human Behavior | Medium | People | **There is oil on the nozzle, which has caused difficulty in using it, particularly when opening and closing.** | Unsafe Act | The note has been closed and the inspection card has been signed (closed). | 3/7/2025 | HSE DEPT. | Closed | 3/7/2025 | ||||||