Welcome to the master instruction and parts list for the PANOPTES robotic telescope build!
2
3
This document provides links to the steps for building the Project PANOPTES robotic telescope, based on the documents and parts lists as of (approximately) October, 2018.
4
5
6
How to use this document
7
1) The steps are listed in an order that works.
8
2) The values in the "After Step" column indicate the steps that should be done before the step on that row. If you re-order steps, make sure that you don't place a step before its predecessors or you might find yourself stuck.
9
3) If you plan to build multiple modules then it's worth consolidating the parts lists for those modules into one to minimize splitting orders to a given vendor and hence reduce shipping costs.
10
11
Step labelAfter StepComponent / TaskDate
Instructions
Parts ListNotes
12
Power Supply
13
UPS-Uninterruptible Power Supply2018.03DocumentUPS Parts List
14
Control Computer
15
NUC-Intel NUC Setup2018.01DocumentNUC Parts List
16
Camera Box
17
CBSUPSCamera Board Soldering2018.12DocumentCamera Electronics - 2018.12
18
TCBNUC, CBSTesting Camera Board2018.12DocumentCamera Board Test Parts List - 2018.10
19
CAMBF-Camera Box Fabrication2018.10DocumentCamera Box Fabrication Parts List - 2018.10
20
CAMBATCB, CAMBFCamera Box Assembly2018.10DocumentCamera Box Assembly Parts List - 2018.10
21
Control Box
22
PBSUPSPower Board Soldering2018.12DocumentPower Board Parts List - 2018.12
23
TPBNUC, PBSTesting Power Board2018.12DocumentPower Board Test Parts List - 2018.12
24
CTRLBF-Control Box Fabrication2018.10DocumentControl Box Fabrication Parts List - 2018.10
25
CTRLBATPB, CTRLBFControl Box Assembly2018.10DocumentControl Box Assembly Parts List - 2018.10
26
Pier
27
PIER-Custom Telescope Pier Fabrication2018.10DocumentTelescope Pier Parts List - 2018.10
28
Assembly, Testing, Weatherproofing
29
SYSASCAMBA, CTRLBA, PIERIndoor System Assembly2018.10Document
Indoor System Assembly Parts List - 2018.10
30
SYSTSYSASIndoor System testing2018.10Document
31
AAGNUCAAG Cloudwatcher Testing2017.01DocumentWeather Station Parts List - 2017.01
32
UWPSYSTUnit Weatherproofing2019.01DocumentMount Weatherproofing Parts List - 2018.10
33
EMC-
Building the external monitoring camera
2019.08Document
External monitoring camera Parts List - 2019.08
This is optional
34
Site Planning and Installation
35
SITESite Planning2019.03Document
36
DEPLOYSYSTDeploying a unit2017.01Document
37
Operation
38
POLARPolar Alignment2017.01Document
39
AUTOPPOLARAutomated Operation2019.08Document
40
MANUALPOLARManual OperationDocument
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
Loading...