| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | 55 KEW INTERIOR FINISHES & EQUIPMENT BOQ | |||||||||||||||||||||||||
2 | PROJECT NAME | 55 ON KEW | DOCUMENT DETAILS | WORKBOOK CONTENTS & CONTROL MAP | ||||||||||||||||||||||
3 | PROJECT DETAILS | ARCHITECTURAL & INTERIOR DESIGN - CONCEPT STAGE | ISSUE DATE | 06 Sep 2026 | REVISION | v0.4 | ||||||||||||||||||||
4 | PRELIMINARY BUDGET / PROVISIONAL: Quantities are derived from the 55 Kew Master Schedule. IMS is the coded benchmark for quality, rates and scope. Verify quantities, product matches, duties, freight and live quotations before procurement or site instruction. | |||||||||||||||||||||||||
5 | ||||||||||||||||||||||||||
6 | NO. | SHEET | PURPOSE | GUIDED BY | CONTROL NOTE | |||||||||||||||||||||
7 | 01 | A. FINISHES SUMMARY | High-level cost, payment and outstanding-value summary | IMS commercial hierarchy | Budget-priced in USD from SA/IMS reference rates | |||||||||||||||||||||
8 | 02 | B. DEPT BREAKDOWN | Trade-by-trade material, labour, logistics, contingency and VAT breakdown | IMS department breakdown | Formula-linked to the detailed BOQ sheets | |||||||||||||||||||||
9 | 03 | 1. FLOOR FINISHES | Floor finish quantities, specifications and pricing inputs | 55 Kew FF codes | Master quantities include concept-stage waste allowances | |||||||||||||||||||||
10 | 04 | 2. WALL FINISHES | Wall, feature and specialist cladding quantities | 55 Kew FW codes | Wall and feature quantities consolidated by finish code | |||||||||||||||||||||
11 | 05 | 3. CEILING FINISHES | Internal, wet-area, external and specialist ceiling finishes | 55 Kew FC codes | Ceiling quantities include the master-schedule allowance | |||||||||||||||||||||
12 | 06 | 4. PAINTWORK | Interior, exterior and cinema paintwork | 55 Kew FP codes | Rates and systems remain supplier inputs | |||||||||||||||||||||
13 | 07 | 5. SKIRTING & TRIMS | Skirting and perimeter trim quantities | 55 Kew SK codes | Measured in linear metres | |||||||||||||||||||||
14 | 08 | 6. ANCILLARY MATERIALS | Proportional adhesive, grout, trims, joints, protection and waterproofing | IMS sundries approach | Derived from finish quantities using editable coverage factors | |||||||||||||||||||||
15 | 09 | 7. BALUSTRADES | Premium glazed and metal fall-protection allowances | 55 Kew balconies + IMS quality | Lengths are provisional pending measured take-off and engineering | |||||||||||||||||||||
16 | 10 | 8. SANITARY FIXTURES | Sanitaryware, brassware, drains and bathroom accessories | 55 Kew quantities + IMS fixtures | Premium SA supply allowance; rough-ins and final models to confirm | |||||||||||||||||||||
17 | 11 | 9. ELECTRICALS | Lighting, sockets, controls, data and equipment points | 55 Kew electrical schedule | Fixture/device budget; distribution and consultant scope excluded | |||||||||||||||||||||
18 | 12 | 10. CABINETRY | Fixed kitchen, utility, wardrobe, vanity and feature joinery | 55 Kew quantities + IMS cabinetry | 175.6 lin.m grouped scope; detailed shop drawings required | |||||||||||||||||||||
19 | 13 | 11. APPLIANCES | Kitchen, laundry, wine, sauna, cinema, AV and HVAC equipment | 55 Kew appliance schedule + IMS quality | 56 items; consultant packages remain provisional | |||||||||||||||||||||
20 | 14 | 12. ROOM FINISHES | Room-level audit trail feeding consolidated finish quantities | 55 Kew room itinerary | Edit room allocations here to update finish quantities | |||||||||||||||||||||
21 | 15 | ASSUMPTIONS & SOURCES | Commercial inputs, rate library, quantity factors and source register | 55 Kew + IMS + SA benchmarks | Gold cells are inputs; blue cells are formula-derived | |||||||||||||||||||||
22 | ||||||||||||||||||||||||||
23 | PRICING WORKFLOW | |||||||||||||||||||||||||
24 | 1 Confirm quantities and specifications → 2 Replace allowances with quotations → 3 Review logistics, tax and duties → 4 Record approvals, orders and payments | |||||||||||||||||||||||||
25 | Preliminary budget only. IMS-coded references, proxy rates and provisional quantities require design, consultant, QS and supplier confirmation before procurement or construction. | |||||||||||||||||||||||||
26 | ||||||||||||||||||||||||||
27 | ||||||||||||||||||||||||||
28 | ||||||||||||||||||||||||||
29 | ||||||||||||||||||||||||||
30 | ||||||||||||||||||||||||||
31 | ||||||||||||||||||||||||||
32 | ||||||||||||||||||||||||||
33 | ||||||||||||||||||||||||||
34 | ||||||||||||||||||||||||||
35 | ||||||||||||||||||||||||||
36 | ||||||||||||||||||||||||||
37 | ||||||||||||||||||||||||||
38 | ||||||||||||||||||||||||||
39 | ||||||||||||||||||||||||||
40 | ||||||||||||||||||||||||||
41 | ||||||||||||||||||||||||||
42 | ||||||||||||||||||||||||||
43 | ||||||||||||||||||||||||||
44 | ||||||||||||||||||||||||||
45 | ||||||||||||||||||||||||||
46 | ||||||||||||||||||||||||||
47 | ||||||||||||||||||||||||||
48 | ||||||||||||||||||||||||||
49 | ||||||||||||||||||||||||||
50 | ||||||||||||||||||||||||||
51 | ||||||||||||||||||||||||||
52 | ||||||||||||||||||||||||||
53 | ||||||||||||||||||||||||||
54 | ||||||||||||||||||||||||||
55 | ||||||||||||||||||||||||||
56 | ||||||||||||||||||||||||||
57 | ||||||||||||||||||||||||||
58 | ||||||||||||||||||||||||||
59 | ||||||||||||||||||||||||||
60 | ||||||||||||||||||||||||||
61 | ||||||||||||||||||||||||||
62 | ||||||||||||||||||||||||||
63 | ||||||||||||||||||||||||||
64 | ||||||||||||||||||||||||||
65 | ||||||||||||||||||||||||||
66 | ||||||||||||||||||||||||||
67 | ||||||||||||||||||||||||||
68 | ||||||||||||||||||||||||||
69 | ||||||||||||||||||||||||||
70 | ||||||||||||||||||||||||||
71 | ||||||||||||||||||||||||||
72 | ||||||||||||||||||||||||||
73 | ||||||||||||||||||||||||||
74 | ||||||||||||||||||||||||||
75 | ||||||||||||||||||||||||||
76 | ||||||||||||||||||||||||||
77 | ||||||||||||||||||||||||||
78 | ||||||||||||||||||||||||||
79 | ||||||||||||||||||||||||||
80 | ||||||||||||||||||||||||||
81 | ||||||||||||||||||||||||||
82 | ||||||||||||||||||||||||||
83 | ||||||||||||||||||||||||||
84 | ||||||||||||||||||||||||||
85 | ||||||||||||||||||||||||||
86 | ||||||||||||||||||||||||||
87 | ||||||||||||||||||||||||||
88 | ||||||||||||||||||||||||||
89 | ||||||||||||||||||||||||||
90 | ||||||||||||||||||||||||||
91 | ||||||||||||||||||||||||||
92 | ||||||||||||||||||||||||||
93 | ||||||||||||||||||||||||||
94 | ||||||||||||||||||||||||||
95 | ||||||||||||||||||||||||||
96 | ||||||||||||||||||||||||||
97 | ||||||||||||||||||||||||||
98 | ||||||||||||||||||||||||||
99 | ||||||||||||||||||||||||||
100 | ||||||||||||||||||||||||||