55 KEW INTERIOR FINISHES & EQUIPMENT BOQ
2
PROJECT NAME
55 ON KEWDOCUMENT DETAILSWORKBOOK CONTENTS & CONTROL MAP
3
PROJECT DETAILS
ARCHITECTURAL & INTERIOR DESIGN - CONCEPT STAGEISSUE DATE06 Sep 2026REVISIONv0.4
4
PRELIMINARY BUDGET / PROVISIONAL: Quantities are derived from the 55 Kew Master Schedule. IMS is the coded benchmark for quality, rates and scope. Verify quantities, product matches, duties, freight and live quotations before procurement or site instruction.
5
6
NO.SHEETPURPOSEGUIDED BYCONTROL NOTE
7
01A. FINISHES SUMMARYHigh-level cost, payment and outstanding-value summaryIMS commercial hierarchyBudget-priced in USD from SA/IMS reference rates
8
02B. DEPT BREAKDOWNTrade-by-trade material, labour, logistics, contingency and VAT breakdownIMS department breakdownFormula-linked to the detailed BOQ sheets
9
031. FLOOR FINISHESFloor finish quantities, specifications and pricing inputs55 Kew FF codesMaster quantities include concept-stage waste allowances
10
042. WALL FINISHESWall, feature and specialist cladding quantities55 Kew FW codesWall and feature quantities consolidated by finish code
11
053. CEILING FINISHESInternal, wet-area, external and specialist ceiling finishes55 Kew FC codesCeiling quantities include the master-schedule allowance
12
064. PAINTWORKInterior, exterior and cinema paintwork55 Kew FP codesRates and systems remain supplier inputs
13
075. SKIRTING & TRIMSSkirting and perimeter trim quantities55 Kew SK codesMeasured in linear metres
14
086. ANCILLARY MATERIALSProportional adhesive, grout, trims, joints, protection and waterproofingIMS sundries approachDerived from finish quantities using editable coverage factors
15
097. BALUSTRADESPremium glazed and metal fall-protection allowances55 Kew balconies + IMS qualityLengths are provisional pending measured take-off and engineering
16
108. SANITARY FIXTURESSanitaryware, brassware, drains and bathroom accessories55 Kew quantities + IMS fixturesPremium SA supply allowance; rough-ins and final models to confirm
17
119. ELECTRICALSLighting, sockets, controls, data and equipment points55 Kew electrical scheduleFixture/device budget; distribution and consultant scope excluded
18
1210. CABINETRYFixed kitchen, utility, wardrobe, vanity and feature joinery55 Kew quantities + IMS cabinetry175.6 lin.m grouped scope; detailed shop drawings required
19
1311. APPLIANCESKitchen, laundry, wine, sauna, cinema, AV and HVAC equipment55 Kew appliance schedule + IMS quality56 items; consultant packages remain provisional
20
1412. ROOM FINISHESRoom-level audit trail feeding consolidated finish quantities55 Kew room itineraryEdit room allocations here to update finish quantities
21
15ASSUMPTIONS & SOURCESCommercial inputs, rate library, quantity factors and source register55 Kew + IMS + SA benchmarksGold cells are inputs; blue cells are formula-derived
22
23
PRICING WORKFLOW
24
1 Confirm quantities and specifications → 2 Replace allowances with quotations → 3 Review logistics, tax and duties → 4 Record approvals, orders and payments
25
Preliminary budget only. IMS-coded references, proxy rates and provisional quantities require design, consultant, QS and supplier confirmation before procurement or construction.
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100