| A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | Q | R | S | T | U | V | W | X | Y | Z | |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | replae | Projects | Home Automation | |||||||||||||||||||||||
2 | Phase 1: Control | |||||||||||||||||||||||||
3 | Address plaque with LEDs | HVAC - Nest | done | all-in-one gadget | ||||||||||||||||||||||
4 | Hektor-style chalkboard | smart light switches | done | wifi repeater node | ||||||||||||||||||||||
5 | Insulation for attic access | Make electical map of house | passable openhab setup | done | camera | $30 | ||||||||||||||||||||
6 | Hot Tub Solar Heater | LED bulbs | done | alexa | $50 | |||||||||||||||||||||
7 | crown moulding in laundry room | Bedside table lamp | garage door | done | motion (part of camera?) | |||||||||||||||||||||
8 | Wireless LEDs for dresser vase | Skybell | done | Use contact magnet switches for open/closed | temperature | $50 | ||||||||||||||||||||
9 | Paint Bannister | Outlet in master bathroom, by Brianna's sink (run conduit through vanity) | Door Locks | use contact wire contacts for locked/unlocked | humidity | |||||||||||||||||||||
10 | Roof-line LED strips | Phase 2: Monitoring and Automation | air particulates | $200 | ||||||||||||||||||||||
11 | Paint window sills | Power Outlet for Tesla | Smoke Alarms | done | bluetooth tag tracker | |||||||||||||||||||||
12 | Caulk windows | Pull-out Drawers in Pantry | contact switches | |||||||||||||||||||||||
13 | motion sensors | install Zwave? | Window List | |||||||||||||||||||||||
14 | ip cams | done | yes | Nursery | wyze | |||||||||||||||||||||
15 | integrate nest | yes | Office | wyze | ||||||||||||||||||||||
16 | Ceiling Touchup: | integrate solar inverter | Yes | upstairs bathroom | zwave | |||||||||||||||||||||
17 | just outside guest bedroom | integrate IREA smart meter | MBr vertical | |||||||||||||||||||||||
18 | across from stairwell | current sensor on hot tub | done | MBr horizontal | ||||||||||||||||||||||
19 | General touch up in Guest bedroom | try to get outdoor cameras working | MBr bath | |||||||||||||||||||||||
20 | Patched screw holes in master bedroom | automate hot tub | yes | laundry room | zwave | |||||||||||||||||||||
21 | blue in kitchen ceiling above dog door (18" from wall) | yes | Left of fireplace | |||||||||||||||||||||||
22 | wall-white around cabinet crown moulding | phase 3: Plumbing | Air conditioner | right of fireplace | ||||||||||||||||||||||
23 | touch up edges of crown moulding. | pressure control valve | done | family room left | ||||||||||||||||||||||
24 | Laundry room touchup | master water valve | done | family room right | ||||||||||||||||||||||
25 | Master closet | water metering | yes | kitchen window | wyze | |||||||||||||||||||||
26 | flood sensors | yes | dining room | wyze | ||||||||||||||||||||||
27 | Plumbing To-Dos: | Sprinkler controller | done | No Screen | Great Room left (swamp cooler) | |||||||||||||||||||||
28 | Replace Water pressure regulator | replace gate valves with ball valves | in progress | Air conditioner | Great Room Right | |||||||||||||||||||||
29 | install water hammer arrestor | Level meter on Brine Tank | ||||||||||||||||||||||||
30 | Magnetometer on utility water meter | automatic pet waterer | done | yes | bay window | wyze | ||||||||||||||||||||
31 | Whole House water valve (smart) | phase 4: fix up basement | Wired | Basement | ||||||||||||||||||||||
32 | Water softener | new TV | done | Wired | Basement bedroom | |||||||||||||||||||||
33 | Water Filter (two stage?) | Xbox w/Kinect | done | Wired | Brian's Shop | wyze | ||||||||||||||||||||
34 | Replace Drain PVC under kitchen sink | smart lighting | done | |||||||||||||||||||||||
35 | Replace kitchen sink hoses with purchased, shorter hoses | Window Liner | done | Door List | ||||||||||||||||||||||
36 | automatic water bowl for pets | Automate fish tank | done | Front Door | wyze | |||||||||||||||||||||
37 | Replace water valve with ball valve: | fix drywall and ceiling tape | Back Porch | wyze | ||||||||||||||||||||||
38 | Finished Tasks: | master bedroom sink 1 hot | use garage door opener | Garage Door | zwave | |||||||||||||||||||||
39 | Remove main-floor toilet tank | master bedroom sink 1 cold | Side Garage Door | zwave | ||||||||||||||||||||||
40 | Prime behind toilet tank | master bedroom sink 2 hot | Computers | Zwave | House/Garage door | |||||||||||||||||||||
41 | Prime triangular wall - second coat | master bedroom sink 2 cold | CAD105 | Workshop workstation | Basement Door | |||||||||||||||||||||
42 | Prime Trim on Chicken Coop | master bedroom toilet | Xbox One | Media Center | ||||||||||||||||||||||
43 | Paint wall-white (first coat) in upstairs hallway. Get spot in Family room too. | Guest bathroom sink hot | Macbook Air | Kitchen Laptop | Misc | |||||||||||||||||||||
44 | Paint Trim on Chicken Coop | Guest bathroom sink cold | Scooter Computer | Great Room Office | ||||||||||||||||||||||
45 | Paint main-floor bathroom - first coat | Guest bathroom toilet | Winbook7 tablet | |||||||||||||||||||||||
46 | Closet Shelves | Main floor bathroom sink hot | Netbook | Eggbot Controller | front gate | |||||||||||||||||||||
47 | Get swamp cooler running | main floor bathroom sink cold | NetTop | In Storage (retired) | back gate | |||||||||||||||||||||
48 | Paint main-floor bathroom - second coat | Main floor bathroom toilet | RasPi (Gen 1) | PiHole | ||||||||||||||||||||||
49 | Paint second coat wall-white in upstairs hallway | basement bathroom sink hot | RasPi (Gen 3) | Rostock (OctoPi) | ||||||||||||||||||||||
50 | Caulk bathroom counter | basement bathroom sink cold | RasPi (Gen 3) | HomeSeer | ||||||||||||||||||||||
51 | Install mirror and other hardware in bathroom | basement bathroom toilet | RasPi (Gen 4) | HomeAssistant/PiHole/Mosquito | ||||||||||||||||||||||
52 | Paint trim in stairway and upstairs hallway | Kitchen sink hot | RasPi (Gen 3) | Delta Mini (OctoPi) | ||||||||||||||||||||||
53 | Paint door for main-floor bathroom | Kitchen sink cold | RasPi (Gen 3) | Monoprice printer (OctoPi) | ||||||||||||||||||||||
54 | Paint Chicken Coop | Kitchen Sink - Dish washer | RasPi (Gen 3) | Retropie (OctoPi) | ||||||||||||||||||||||
55 | Paint triangular wall (blue?) first coat | Utility Tub Sink hot | ||||||||||||||||||||||||
56 | Paint triangular wall (blue?) second coat | Utility Tub Sink cold | ||||||||||||||||||||||||
57 | Touch up ceiling in nursery | floor drain in laundry room | ||||||||||||||||||||||||
58 | Hang 2 sets of window blinds | Install utility sink in laundry room | ||||||||||||||||||||||||
59 | Hang backdoor curtain | |||||||||||||||||||||||||
60 | paint trim on south wall | Cerebro | Recycled | |||||||||||||||||||||||
61 | paint trim on east wall | |||||||||||||||||||||||||
62 | Paint and re-hang Entryway closet door | |||||||||||||||||||||||||
63 | sand window sills | |||||||||||||||||||||||||
64 | prime window sills | |||||||||||||||||||||||||
65 | Paint and re-hang Nursery Door | |||||||||||||||||||||||||
66 | Paint and hang Nusery closet door (1) | |||||||||||||||||||||||||
67 | paint trim on north wall | |||||||||||||||||||||||||
68 | paint trim on west wall | |||||||||||||||||||||||||
69 | paint window sills | |||||||||||||||||||||||||
70 | Paint and hang Nusery closet door (2) | |||||||||||||||||||||||||
71 | Paint and re-hang Guest Bedroom Door | |||||||||||||||||||||||||
72 | pull crap out of walls in Great Room | |||||||||||||||||||||||||
73 | patch holes in Great Room | |||||||||||||||||||||||||
74 | Paint and re-hang Guest Bathroom Door | |||||||||||||||||||||||||
75 | Paint trim - guest bathroom | |||||||||||||||||||||||||
76 | Paint and re-hang master closet door | |||||||||||||||||||||||||
77 | Paint and re-hang water closet door | |||||||||||||||||||||||||
78 | Paint trim in master bathroom | |||||||||||||||||||||||||
79 | Paint and re-hang Master Bedroom Door | |||||||||||||||||||||||||
80 | Re-install toilet in main-floor bathroom | |||||||||||||||||||||||||
81 | paint laundry room door trim | |||||||||||||||||||||||||
82 | replace water line to evaporative cooler | |||||||||||||||||||||||||
83 | Install Curtain in Kitchen | |||||||||||||||||||||||||
84 | Paint and re-hang laundry room door | |||||||||||||||||||||||||
85 | paint and re-hang basement door - replace door knob | |||||||||||||||||||||||||
86 | Paint trim - Master Suite | |||||||||||||||||||||||||
87 | Replace outlets in Guest Bedroom | |||||||||||||||||||||||||
88 | Paint trim - guest bedroom | |||||||||||||||||||||||||
89 | Figure out lights in nursery | |||||||||||||||||||||||||
90 | Install two junction boxes | |||||||||||||||||||||||||
91 | Wire junction boxes | |||||||||||||||||||||||||
92 | Install light fixtures | |||||||||||||||||||||||||
93 | replace switch in nursery | |||||||||||||||||||||||||
94 | Replace outlets in nursery | |||||||||||||||||||||||||
95 | Install trim in Master Bedroom | |||||||||||||||||||||||||
96 | replace noisy sprinkler head | |||||||||||||||||||||||||
97 | drip line as back up water for chickens | |||||||||||||||||||||||||
98 | clean up yard | |||||||||||||||||||||||||
99 | convert window AC to indoor | |||||||||||||||||||||||||
100 | Install window A/C |