ABCDEFGHIJKLMNOPQRSTUVWXY
1
ProjectNotesEstimates
2
I. Marketing & Events
3
3rd party content creationProject whitepapers, casestudies, etc..
4
AR/PR/SocialContinue as in 2018
5
Event Giveways and SwagEvent giveaways at booths and workshops
6
Marketing and Events Total
7
II. Developer Collaboration
8
Infrastructure RequestsDoes the project have any hardware or additional hosting requirements
9
Additional Test beds for CSITDraft Specification given below Estimate TBD
10
Ixia Traffic Generator LicenseIxia Ixload/perfect storm appliance license renewalEstimate TBD
1/25/2019 renewal date -- flagged so it's not lost
11
Remote rack management gearadditional power cyclers and switches and cables to improve remote management of servers in Performance lab10K
12
13
6th Rack to be brought on Q3/Q4 Currently operating with 50% capacity on 5th rack. Anticipate expanding to 6th Rack in 201912 months
The cost of new circuit (3-phase, 208V, 30A, ~8.3kW usable power, same as the current circuit) is $xxxx per month.
We can add an additional full rack with power for $xxxx per month and give us an additional 42 U's of capacity (single rack) to work with.
14
Collaboration servicesDomain management,
Continue 2018 coverage
15
Support costs
16
Maintain (PDX, Vexhost, AWS)maintain current build and CSIT racks (5 racks at Vexhost). Carrry over from 2018 (AWS, Atmosera, Vexhost)
Continue 2018 coverage
17
18
Developer Metrics (Bitergia Dashboard)Dashboard license fees for 2019
Is this part of a centralized bitergia contract?
19
20
Community Events Co-located @ KubeCon EU (Mini-Summit)$45,000.00
30-40K per event
21
Co-located @ KubeCon US (Mini-Summit)$45,000.00
30-40K per event
22
Embedded Conference (additional device/IOT/hardware event/conf) $30,000.00Estimate TBD
Smaller colo event to expand colo geolocatation
23
24
TSC Community Discretionary FundInline with OPNFV misc spend line$25,000.00
25
26
Community Awards & RecognitionDeveloper appriciation gifts, t-shirts and puppies
27
28
Intern ProgramRequest for 4-5 interns for Year. 2018 had 2 interns in 2018. (~9K/intern)4 Interns
29
30
III. LF Staffing
31
Release EngineeringContinue 2018 coverage
Continue 2018 coverage
32
System AdministratorContinue 2018 coverage (remote hands from VexHost and Support from Anton)
Continue 2018 coverage
33
Program ManagerContinue 2018 coverage
Continue 2018 coverage
34
Marketing/PR ManagerContinue 2018 Coverage
Continue 2018 Coverage
35
36
Developer Collaboration
37
38
39
CSIT Gear Request
40
GearRequested for/ impact if we dont get itUnit Server Height in RUs
41
3 Server cluster, each server is: supermicro 2 socket Intel Xeon Platinum/Gold, 2x10GE interfaces, 4x 1.6TB SSD (or larger).CSIT measurement data storage, analytics, rendering and presentation tools. Required for dynamic report generation and presentation.Open-source tools hosted on cluster: incl. open-sql dbase, plotl.y dash, and FD.io CSIT framework code (Presentation and Analytics Layer, aka PAL). 3 server cluster.2U or 1U
42
3 Servers. Each server is supermicro 2 socket Intel Xeon Platinum/Gold, 2x 1.6TB SSD, Nx10GE, Nx25GE, Nx40GE.for Traffic Generator T-Rex for Arm SUT server farm, as many 10GE ports as possible, some 25GE, some 40GE.4U
43
1 Server. Each server is supermicro 2 socket Intel Xeon Platinum/Gold, 2x 1.6TB SSD, Nx10GE, Nx25GE, Nx40GE.for Traffic Generator T-Rex for Atom Denverton SUTs servers, as many 10GE ports as possible, some 25GE, some 40GE.4U
44
3 Server cluster, each server is: supermicro 2 socket Intel Xeon Platinum/Gold, 2x10GE interfaces, 4x 1.6TB SSD (or larger). 3 servers for each of container-cloud control and orchestration:
- vpp vpp_build x86
- vpp vpp_build arm
- csit vpp_device
2U or 1U
45
1 Server is: supermicro 2 socket Intel Xeon Platinum/Gold, 2x10GE interfaces, 4x 1.6TB SSD (or larger).e.g. x86 hosts for running vpp_build jobs in DRCs
fine until scaling for a while
1 skylake two socket server to move off virl3 server
2U or 1U
46
NICs
47
pluggables
48
cables
49
3 Servers. Each server is supermicro 2 socket Intel Xeon Platinum/Gold, 2x 1.6TB SSD, Nx10GE, Nx25GE, Nx40GE.additional skx SUT / TG servers for increased testbed capaity and spares4U
50
51
Lights out Operation items (Remote management)
52
power cyclers
53
switches
54
camera
55
KVM consoles
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100