1 | _____ | ||||||||||||||||||||||||
2 | JOB SAFETY ANALYSIS (JSA) | ||||||||||||||||||||||||
3 | Title of Activity / Work: | Excavation & Trenching | |||||||||||||||||||||||
4 | Name of Project Site and Location | Date of JSA preparation | |||||||||||||||||||||||
5 | Name of Contractor: | Activity/ Work location Name : | JSA No.: | ||||||||||||||||||||||
6 | Sl. No. | Subactivity / Steps | Hazard | Effect | Control Measures | Responsibility | Remarks | ||||||||||||||||||
7 | STANDARD JSA | ||||||||||||||||||||||||
8 | 1 | Manual excavation / Mechanical Excavation | Dust | Skin and eye irritation, cough , lung irritation | Proper leveling/compacting ground. | Job Supervisor | |||||||||||||||||||
9 | Storing soil or other fine particles material in low height of the heap. Cover them with empty gunny bags. | ||||||||||||||||||||||||
10 | Ensure all site traffic adhere to the site speed limit. | ||||||||||||||||||||||||
11 | Vegetation clearing should be carried out on a needs basis. | ||||||||||||||||||||||||
12 | Wear dust mask. | ||||||||||||||||||||||||
13 | Sprinkle the ground surface with water unless it is moist. | ||||||||||||||||||||||||
14 | Underground utilities like electrical, telephone cables, water,steam pipes, gas line, etc. | Fire / Explosion / Electric shock may cause Injury | Take excavation permit. In case isolation of underground services required take LOTO permit. | ||||||||||||||||||||||
15 | Obtain permission from respective authorities of U/G services, prior to excavation, if required. | ||||||||||||||||||||||||
16 | Locate the position of buried utilities by referring to drawings, Route marker, Concrete saddles, Sand Padding.If required use Cable/utility detectors. | ||||||||||||||||||||||||
17 | Make trial pits by manual excavation to locate the exact position of buried utilities/cables prior and thereafter use mechanical means. | ||||||||||||||||||||||||
18 | Hand tools used for excavation shall be provided with wooden or insulated material handle. | ||||||||||||||||||||||||
19 | Unsecured / Loose pit walls | Cave-in can cause Injury or suffocation | Proper sloping, benching or shoring shall be done as appropriate as per soil type. | ||||||||||||||||||||||
20 | In case water emerged, dewatering by dewatering pump. | ||||||||||||||||||||||||
21 | Use PPE- Safety Shoes/Gum boot with steel toe, Safety Helmet, Dust mask, safety goggles | ||||||||||||||||||||||||
22 | Accumulation of debris and other material at the edges of the excavation | Falling of material (Soil) may cause injury. | Keep excavated soil, debris at least 1m away from the edge of the excavation. | ||||||||||||||||||||||
23 | Boulders and big stones that may be slide or roll into the excavation shall be removed promptly. | ||||||||||||||||||||||||
24 | Water logging , Rain water ingress | Drowning may cause illness/injury | In case water emerged, dewatering by dewatering pump. | ||||||||||||||||||||||
25 | Unsecured Excavation edges | Fall of person / material may cause injury | Provide barricade around excavations. Hard Barricade of 1m height should be provided for excavations beyond 1.5m depth. | ||||||||||||||||||||||
26 | Provide minimum two access / ladders for such excavation/trench. | ||||||||||||||||||||||||
27 | Provide access, ladders or stair every 25 feets in excavation. | ||||||||||||||||||||||||
28 | Don’t allow vehicle, equipment to operate too close to excavated areas and maintain at least 2 m distance from edge of cut. | ||||||||||||||||||||||||
29 | Display safety warning Signs | ||||||||||||||||||||||||
30 | 2 | Workers Movement near excavated pit. | person should stand , seat or move on the edge of excavated pit. | Fall of person into the pit | No person should stand , seat or move on the edge of excavated pit. | Job Supervisor | |||||||||||||||||||
31 | Note : If any incident happened during the work, then work will be stopped and JSA will be reviewed. Work will be restarted after implementing safety measures mentioned in revised JSA." | ||||||||||||||||||||||||
32 | Space for additional Remarks/Instruction/comments /safety measures to be taken as per site situation and nature of job. | ||||||||||||||||||||||||
33 | Use stick before taking any item from grass or walking to unknown area covered with grass/ wild bush. to avoid snake bite. | ||||||||||||||||||||||||
34 | Prepared by: Name and sign. | Reviewed by: Name and sign. | Approved by: Name and sign. | ||||||||||||||||||||||
35 | |||||||||||||||||||||||||
36 | |||||||||||||||||||||||||
37 | |||||||||||||||||||||||||
38 | |||||||||||||||||||||||||
39 | |||||||||||||||||||||||||
40 | |||||||||||||||||||||||||
41 | |||||||||||||||||||||||||
42 | |||||||||||||||||||||||||
43 | |||||||||||||||||||||||||
44 | |||||||||||||||||||||||||
45 | |||||||||||||||||||||||||
46 | |||||||||||||||||||||||||
47 | |||||||||||||||||||||||||
48 | |||||||||||||||||||||||||
49 | |||||||||||||||||||||||||
50 | |||||||||||||||||||||||||
51 | |||||||||||||||||||||||||
52 | |||||||||||||||||||||||||
53 | |||||||||||||||||||||||||
54 | |||||||||||||||||||||||||
55 | |||||||||||||||||||||||||
56 | |||||||||||||||||||||||||
57 | |||||||||||||||||||||||||
58 | |||||||||||||||||||||||||
59 | |||||||||||||||||||||||||
60 | |||||||||||||||||||||||||
61 | |||||||||||||||||||||||||
62 | |||||||||||||||||||||||||
63 | |||||||||||||||||||||||||
64 | |||||||||||||||||||||||||
65 | |||||||||||||||||||||||||
66 | |||||||||||||||||||||||||
67 | |||||||||||||||||||||||||
68 | |||||||||||||||||||||||||
69 | |||||||||||||||||||||||||
70 | |||||||||||||||||||||||||
71 | |||||||||||||||||||||||||
72 | |||||||||||||||||||||||||
73 | |||||||||||||||||||||||||
74 | |||||||||||||||||||||||||
75 | |||||||||||||||||||||||||
76 | |||||||||||||||||||||||||
77 | |||||||||||||||||||||||||
78 | |||||||||||||||||||||||||
79 | |||||||||||||||||||||||||
80 | |||||||||||||||||||||||||
81 | |||||||||||||||||||||||||
82 | |||||||||||||||||||||||||
83 | |||||||||||||||||||||||||
84 | |||||||||||||||||||||||||
85 | |||||||||||||||||||||||||
86 | |||||||||||||||||||||||||
87 | |||||||||||||||||||||||||
88 | |||||||||||||||||||||||||
89 | |||||||||||||||||||||||||
90 | |||||||||||||||||||||||||
91 | |||||||||||||||||||||||||
92 | |||||||||||||||||||||||||
93 | |||||||||||||||||||||||||
94 | |||||||||||||||||||||||||
95 | |||||||||||||||||||||||||
96 | |||||||||||||||||||||||||
97 | |||||||||||||||||||||||||
98 | |||||||||||||||||||||||||
99 | |||||||||||||||||||||||||
100 | |||||||||||||||||||||||||