FRAMING BID PROPOSAL
2
3
PROPOSAL CONTROL
4
Proposal Number
EXCO-FRM2401-2026-001-R00
Base Proposal Number
EXCO-FRM2401-2026-001Revision0Revision Date08/05/2026
5
StatusSubmittedProposal Date08/05/2026
Expiration Date
09/04/2026Proposal TypeLump Sum
6
7
8
9
CUSTOMER, CONTRACTOR, AND PROJECT
10
Customer Name
Example Customer
Customer Company
Example Development
11
Customer Address
200 Customer Ave
Customer Contact
Example Contact / contact@example.com
12
13
14
Contractor Name
Example Framing Contractor
Contractor Contact
Example Estimator / estimating@example.com
15
Project NameExample Framing Project
Project Number
FRM-2401
Project Address
300 Project Street
16
17
18
DRAWINGS, SPECIFICATIONS, AND ADDENDA
19
Drawing References
A1.1-A8.0; S1.1-S5.2
Specification References
Division 06 - Rough Carpentry
20
21
22
Addenda Acknowledged
Yes
Addendum Numbers
1, 2
Attachment References
Proposal drawings, estimate backup, alternates schedule
23
24
25
FRAMING SCOPE OF WORK
26
Framing Categories Included
Floor Framing; Wall Framing; Roof Framing; Engineered Wood; Sheathing; Hardware; Temporary Bracing
27
28
Floor Framing Scope
Provide floor joists, beams, rim board, blocking, subfloor, openings, and related hardware.
29
30
Wall Framing Scope
Provide exterior and interior wall framing, headers, posts, backing, fire blocking, and shear-wall framing.
31
32
Roof Framing Scope
Provide truss and stick-framed roof components, roof blocking, overhang framing, and roof sheathing.
33
34
Engineered Wood Scope
Provide I-joists, LVLs, PSLs, LSLs, glulam members, and engineered columns shown in the bid documents.
35
36
Sheathing Scope
Provide floor, wall, and roof sheathing with required panel thicknesses and fastening patterns.
37
38
Hardware / Equipment / Temporary Works
Provide framing hardware, connectors, temporary bracing, material handling equipment, and cleanup.
39
INCLUSIONS, EXCLUSIONS, RESPONSIBILITIES, AND QUALIFICATIONS
40
InclusionsLayout, rough framing, temporary bracing, standard equipment, delivery, installation, and punch-list completion.
41
42
43
ExclusionsStructural steel, concrete, firestopping beyond listed scope, permanent power, and work not specifically included.
44
45
46
Owner Responsibilities
Provide timely selections, approvals, access to owner-controlled areas, and payment according to the proposal.
47
48
49
General Contractor Responsibilities
Provide survey control, site access, staging, temporary power source, fall-protection anchor coordination, and area releases.
50
51
52
Work by OthersPrimary structural steel, concrete, permanent electrical service, firestopping beyond listed scope, and finish carpentry.
53
54
55
ALTERNATES, ALLOWANCES, UNIT PRICES, AND COMMERCIAL TERMS
56
AssumptionsPricing is based on issued bid documents, normal weekday access, coordinated releases, and standard material lead times.
57
58
59
QualificationsQuantities are subject to final contract documents. Changes require written authorization under the referenced change-order procedure.
60
61
62
Schedule / Site Access / Material Handling / Crane Assumptions
Normal site access and staging are assumed. Crane and telehandler use are based on standard setup conditions and coordinated picks.
63
64
65
66
Temporary Bracing / Safety / Insurance / Warranty
Temporary bracing remains until permanent structural systems are installed. Standard project safety and insurance requirements apply. Workmanship warranty is one year unless the contract states otherwise.
67
68
Payment Terms
Retainage Terms
Proposal Validity
Change-order Procedure Reference
Acceptance Status
Customer Acceptance
69
Net 3010% retainage30 daysPer contract change-order procedurePendingNo
70
71
PROPOSAL TOTALS
72
Base Proposal Value
Alternate Total
Allowance Total
Taxable Amount
Tax RateTax
73
$450,000.00-$12,000.00$180,000.00--
74
75
Proposal TotalGrand TotalDays OpenAging Status
76
$462,000.00$462,000.001Current
77
78
79
SIGNATURES AND ACCEPTANCE
80
Authorized Customer Name
Example CustomerCustomer TitleAuthorized Representative
Customer Signature Reference
Signature on file
81
82
83
Customer Acceptance Date
08/05/2026
Authorized Contractor Name
Example Framing Contractor
Contractor Signature Reference
Signature on file
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100