2 | Notice of Funding Opportunity (NOFO) Date | Grant Program | Submission Deadline | Lead | Project Name | Project Fact Sheet | Project Grant Application | Grant Request/Award Amount | Match Amount | Match Source | Total Project Estimate | Status | Grant Award Announcement Date | Notes | |||||||||||||||||
3 | CURRENT UPDATE ITEMS | ||||||||||||||||||||||||||||||
4 | 09/01/2016 | Accelerated Innovation Deployment (AID) | Open Rolling Date | UDOT Project Development | Utility Detection | $1,000,000 | $250,000 | Statewide Transportation Solutions | $1,250,000 | UDOT Submitted | This project was approved by the Transportation Commission, contingent upon being awarded the grant, at the October 2021 Commission Meeting. $250,000 from Statewide Transportation Solutions for the grant match was included in the contingent approval. | ||||||||||||||||||||
5 | 1/28/2022 | Rebuilding American Infrastructure with Sustainability & Equity (RAISE) | 4/14/2022 | UDOT Project Development / UDOT Region 3 | U.S. 189: University Ave Viaduct Replacement (0F-84) | Project Fact Sheet | Project Application | $25,000,000 | $24,000,000 | State Transportation Funds | $49,000,000 | UDOT Submitted | TBD - August 2022 | $1.5 Billion in available funds this year. | |||||||||||||||||
6 | 1/29/2022 | Rebuilding American Infrastructure with Sustainability & Equity (RAISE) | 4/14/2022 | UTA | Westside Express | Project Fact Sheet | UTA Submitted | TBD - August 2022 | |||||||||||||||||||||||
7 | 1/30/2022 | Rebuilding American Infrastructure with Sustainability & Equity (RAISE) | 4/14/2022 | High Valley Transit (Summit Co) | S.R.224 Battery Electric Bus and BRT Project: A Project to Transform a Gateway Cooridor | $27,530,000 | $39,500,000 | High Valley Transit | $67,030,000 | High Valley Transit Submitted | TBD - August 2022 | ||||||||||||||||||||
8 | 3/4/2022 | Low or No Emission + Buses and Bus Facilities | 5/31/2022 | High Valley Transit (Summit Co) | High Valley Transit Electric Vehicle Project | $17,200,000 | $5,000,000 | High Valley Transit | $22,200,000 | UDOT Submitted | |||||||||||||||||||||
9 | 3/4/2022 | Low or No Emission + Buses and Bus Facilities | 5/31/2022 | Park City Transit | Park City’s Electric Fleet Conversion | $2,389,699 | $597,423 | Park City Transit | $2,987,122 | UDOT Submitted | |||||||||||||||||||||
10 | 3/16/2022 | 2022 National Scenic Byways Program | 6/20/2022 | Utah Patchwork Parkway (SR-143) Byway Committee | Brian Head Fire Interpretive Facilities Project | Letter of Intent | Project Application | $249,886 | $62,472 | Brian Head, Panguitch, Parowan, Garfield Co., and Iron Co. Local Funds | $312,358 | UDOT Submitted | All primary project sponsors must be a State DOT or Indian Tribe and be entered through grants.gov $22 Million in available funds this year. | ||||||||||||||||||
11 | 3/16/2022 | 2022 National Scenic Byways Program | 6/20/2022 | Zion Scenic Byway Committee | Zion Scenic Parkway Corridor Management Plan Update | Letter of Intent | Project Application | $48,000 | $12,000 | Kane Co., Washington Co., La Verkin, Rockville, Sprngdale, Virgin, Zion Forever Project | $60,000 | UDOT Submitted | All primary project sponsors must be a State DOT or Indian Tribe and be entered through grants.gov $22 Million in available funds this year. | ||||||||||||||||||
12 | 3/16/2022 | 2022 National Scenic Byways Program | 6/20/2022 | Flaming Gorge - Uintas National Scenic Byway Committee | Flaming Gorge - Uintas National Scenic Byway Facility Access Improvements | Letter of Intent | Project Application | $343,890 | $119,000 | Ashley National Forest, Utah Division of State Parks (Steinaker State Park) | $462,890 | UDOT Submitted | All primary project sponsors must be a State DOT or Indian Tribe and be entered through grants.gov $22 Million in available funds this year. | ||||||||||||||||||
13 | 3/16/2022 | 2022 National Scenic Byways Program | 6/20/2022 | Utah Office of Tourism | Scenic Byway Marketing Plan and Asset Development | Letter of Intent | Project Application | $200,000 | $50,000 | Utah Office of Tourism | $250,000.0 | UDOT Submitted | All primary project sponsors must be a State DOT or Indian Tribe and be entered through grants.gov $22 Million in available funds this year. | ||||||||||||||||||
14 | 3/16/2022 | 2022 National Scenic Byways Program | 6/20/2022 | Utah Office of Tourism | Program Review & Strategic Plan for Utah State Scenic Byway Program | Letter of Intent | Project Application | $80,000 | $20,000 | Utah Office of Tourism | $100,000 | UDOT Submitted | All primary project sponsors must be a State DOT or Indian Tribe and be entered through grants.gov $22 Million in available funds this year. | ||||||||||||||||||
15 | 3/22/2022 | Multimodal Project Discretionary Grant Opportunity (MPDG) | 5/23/2022 | UDOT Program Development / UDOT Region 4 | I-15 South Iron County Freight, Mobility, and Safety Project | Fact Sheet | Project Application | $76,534,067 | $51,022,711 | State Transportation Investment Funds | $127,556,778 | UDOT Submitted | Combining the MEGA, INFRA & Rural Surface Transportation Funding Programs into one NOFO. Applicants can apply for all three programs with one application. $2.9 Billion in available funds this year. | ||||||||||||||||||
16 | 6/10/2022 | Bridge Investment Program - Planning Bridge Projects, and Large Bridge Projects | Planning 7/25/2022 | UDOT | I-84; Uintah Junction to Echo Junction Feasibility Study | Fact Sheet | Project Application | $800,000 | $200,000 | State Bridge Preservation Funds | $1,000,000 | UDOT Submitted | |||||||||||||||||||
17 | 6/10/2022 | Bridge Investment Program - Planning Bridge Projects, and Large Bridge Projects | Bridge Project 9/8/2022 | UDOT | I-80 Bridge Preservation & Rehabilitation near SL International Airport (22 Bridges) | Fact Sheet | $60,960,000 | $15,240,000 | Structures / Transportation Solutions | $76,200,000 | Application Development | ||||||||||||||||||||
18 | Wildlife Crossings Pilot Program | Federal Discretionary Grant to Construct a Wildlife Mitigation Project on I-84 | $1,000,000 | Legislated - Transportation Fund | PLACEHOLDER | Placeholder per 2022 Utah General Legislative Session H.B. 3 Appropriation | |||||||||||||||||||||||||
19 | August 2022 | Railroad Crossing Elimination Program or CRISI??? | Federal Rail Grant - Provo Sub Rail Consolidation | $40,000,000 | Legislated - Transportation Fund | PLACEHOLDER | Placeholder per 2022 Utah General Legislative Session H.B. 3 Appropriation | ||||||||||||||||||||||||
20 | |||||||||||||||||||||||||||||||
21 | PREVIOUS UPDATE ITEMS | ||||||||||||||||||||||||||||||
22 | 3/16/2022 | 2022 National Scenic Byways Program | 6/20/2022 | Zion Scenic Byway Committee | Zion Scenic Parkway Signage | Letter of Intent | Zion Scenic Byway Committee withdrew Project for Consideration | All primary project sponsors must be a State DOT or Indian Tribe and be entered through grants.gov $22 Million in available funds this year. Zion Scenic Byway Committee submitted a Letter of Interest but then didn't follow through with a project application. | |||||||||||||||||||||||
23 | 3/22/2022 | Multimodal Project Discretionary Grant Opportunity (MPDG) | 5/23/2022 | UDOT / UTA | Frontrunner Forward | $15,000,000 | $15,000,000 | State Transportation Funds | $30,000,000 | Not an Eligible Project | The NOFO incorrectly states the following as an eligible project: A public transportation project that is eligible under assistance under Chapter 53 of title 49 or is a part of any of the project types described above. It was clarified on the grant faq list that the correct wording should have been: A public transportation project that is eligible under assistance under Chapter 53 of title 49 and is a part of any of the project types described above. FrontRunner Forward does not meet both of the requirements – it is not a part of any of the project types described above | ||||||||||||||||||||
24 | 4/13/2021 | Rebuilding American Infrastructure with Sustainability & Equity (RAISE) | 7/12/2021 | UTA | 5600 West Express Bus | Project Fact Sheet | $25,000,000 | $7,706,600 | UDOT R/W Inkind | $32,706,600 | UTA Not Awarded | 11/22/2021 | Notice of Funding Opportunity released on 01/20/21 was withdrawn and will be revised. Wording from the USDOT BUILD Grant website: "The Department is currently revising the FY 2021 BUILD Notice of Funding Opportunity. Any FY2021 BUILD NOFOs issued before January 21, 2021, including any previously published on this website or Grants.gov, are withdrawn, and will not be used. The Department will publish the final FY 2021 BUILD NOFO at Grants.gov and https://www.transportation.gov/buildgrants/build-nofo by the April 26, 2021 statutory deadline." | ||||||||||||||||||
25 | 2/17/2021 | Infrastructure for Rebuilding America (INFRA) | 3/19/2021 | UDOT Program Development / Region 2 | Northwest Quadrant Non-Motorized Access Project | Project Fact Sheet | Project Grant Application | $6,972,000 | $6,972,000 | Statewide Transportation Solutions | $13,944,000 | UDOT Not Awarded | 7/1/2021 | UDOT Submitted on 03/18/2021 | |||||||||||||||||
26 | 09/01/2016 | Accelerated Innovation Deployment (AID) | Open Rolling Date | UDOT Project Development | Advancing Digital Construction & Data Capture | Project Fact Sheet | Project Grant Application | $1,000,000 | $250,000 | Statewide Transportation Solutions | $1,250,000 | UDOT Awarded | 5/26/2021 | Up to $250,000 state match was requested and approved by the Commission at the February 21, 2020 Commission Meeting. | |||||||||||||||||
27 | 01/28/2020 | Surface Transportation System Funding Alternatives Program (STSFA) | 7/10/2020 | Technology & Innovation | Road Usage Charge Customer Service Optimization | Project Fact Sheet | Project Grant Application | $1,250,000 | $1,250,000 | Transportation Fund - Engineering Services Line Item | $2,500,000 | UDOT Awarded | 03/16/2021 | For information only. No Commission action required for the grant match. Grant match appropriated to the Transportation Fund - Engineering Services Line Item through 2021 SB2 Item 44. | |||||||||||||||||
28 | 07/01/2020 | Advanced Transportation & Congestion Managment Technologies Deployment (ATCMTD) | 08/31/2020 | UDOT Operations / UDOT Project Development | Utah Broadly Connected | Project Fact Sheet | Project Grant Application | $5,450,000 | $5,450,000 | Traffic Management Program, Private In-kind | $10,900,000 | UDOT Awarded | 12/31/2020 | $60M total available with a $12M award ceiling. 50% Match required. UDOT $4.5M match and $950k in other funds from Carnegie Mellon University in-kind match. | |||||||||||||||||
29 | 06/16/2020 | Work Zone Data Exchange (WZDx) | 08/03/2020 | UDOT Operations / UDOT Project Development | UDOT Workzone Data Exchange Demonstration Project | Not Available | Project Grant Application | $200,000 | $87,591 | Traffic Management Program, Private In-kind | $287,591 | UDOT Awarded | 1/19/2021 | $2.4M total available to promote the development of shared data feeds on work zones. Per AASHTO article quoting FHWA "Approximately 12 grants up to $200,000 each are expected to be awarded" | |||||||||||||||||
30 | 06/01/2020 | State Transportation Innovation Councils (STIC) Technology & Innovation Deployment Program | 08/07/2020 | UDOT Technology & Innovation / UDOT Structures | Mobile Inspection Application for Emergency Bridge Inpsections | Project Fact Sheet | Project Grant Application | $100,000 | $25,000 | Structures Program, Private In-kind | $250,000 | UDOT Awarded | 2020 | Vendor providing $125,000 in matching in-kind services. | |||||||||||||||||
31 | 4/20/2020 | Consolidated Rail Infrastructure and Safety Improvements Program (CRISI) | 06/19/2020 | UTA | Sharp-Tintic Railroad Connection | Project Fact Sheet | Project Grant Application | $3,300,000 | $1,000,000 | Region 3 Contingency, MAG, UTA, Local Gov | $9,800,000 | UTA Not Awarded | 9/23/2020 | ||||||||||||||||||
32 | 02/18/2020 | Better Utilizing Investments to Leverage Development (BUILD) | 5/18/2020 | UDOT Program Development | 9000 South: Redwood Rd to 700 W | Project Fact Sheet | Project Grant Application | $25,000,000 | $12,187,000 | TIF | $37,187,000 | UDOT Not Awarded | 12/16/2020 | ||||||||||||||||||
33 | 01/17/2020 | Low or No Emission Vehicle Program (Low-No) | Park City | Overhead Charging Infrastructure - Supporting the electric bus expansion replacing diesel buses in PCT fleet | Project Grant Application | $1,080,000 | $120,000 | Local Transit Sales Tax | $1,200,000 | UDOT Awarded | 06/02/2020 | The Utah Department of Transportation on behalf of Park City Municipal Corporation will receive funds to purchase support charging infrastructure to meet the needs of its electric bus service expansion. | |||||||||||||||||||
34 | 01/13/2020 | Infrastructure for Rebuilding America (INFRA) | 2/25/2020 | UDOT Region 3 / UDOT Program Development | U.S. 40 Climbing Lanes | Project Fact Sheet | Project Grant Application | $13,678,200 | $9,118,800 | $22,797,000 | UDOT Not Awarded | 06/18/2020 | 173 Applicants requested $7.3B in funding (more than 8x available funding). 11.5% of the applicants that submitted recevied award. UDOT has scheduled a application debrief with FHWA on Tuesday 06/30/2020. | ||||||||||||||||||
35 | 11/9/2011 | FHWA 2012 Discretionary Grant Programs | 3/31/2012 | Region 2 | Echo Truck Parking | $1,700,000 | $320,000 | Region 2 Transportation Solutions | $2,020,000 | UDOT Awarded | 02/19/2020 | ||||||||||||||||||||
36 | 04/23/2019 | Better Utilizing Investments to Leverage Development (BUILD) | 07/15/2019 | Region 3 / Program Development | U.S. 189 Safety and Mobility Enhancements | Project Fact Sheet | Project Grant Application | $25,000,000 | $66,100,000 | UDOT Not Awarded | 11/12/2019 | ||||||||||||||||||||
37 | 12/21/2018 | Automated Driving System Demonstration (ADS) | 03/21/2019 | Traffic Management | Utah's Cooperative Automation Demonstration: A Data-Driven Safety Evaluation | Project Fact Sheet | Project Grant Application | $4,420,631 | $5,633,373 | UDOT Not Awarded | 09/18/2019 | ||||||||||||||||||||
38 | 09/05/2018 | Competitive Highway Bridge Program (CHBP) | 12/04/2018 | Structures | Interstate 15 Bridge Bundle | Project Fact Sheet | Project Grant Application | $15,840,000 | $17,000,000 | UDOT Not Awarded | 08/28/2019 | ||||||||||||||||||||
39 | Interstate 80 Bridge Bundle | Project Fact Sheet | Project Grant Application | $28,900,000 | $85,000,000 | UDOT Not Awarded | |||||||||||||||||||||||||
40 | 12/21/2018 | Infrastructure for Rebuilding America (INFRA) | 03/04/2019 | Region 1 / Program Development | Ogden 24th Street Interchange | Project Fact Sheet | Project Grant Application | $25,000,000 | $97,679,000 | UDOT Not Awarded | 07/25/2019 | ||||||||||||||||||||
41 | Region 3 / Program Development | U.S. 40 Climbing Lane & Underpasses | Project Fact Sheet | Project Grant Application | $22,500,000 | $48,313,000 | UDOT Not Awarded | ||||||||||||||||||||||||
42 | 10/05/2018 | Nationally Significant Federal Lands and Tribal Projects Program (NSFLTP) | 12/17/2018 | Region 4 | SR-262 & SR-162 Safety and Energy Corridor Enhancements | Project Fact Sheet | Project Grant Application | $47,920,779 | $24,999,221 | $72,920,000 | UDOT Awarded | 06/05/2019 | |||||||||||||||||||
43 | 04/18/2018 | Advanced Transportation and Congestion Management Technologies Deployment (ATCMTD) | 06/18/2018 | Traffic Management | Utah Connected | Project Fact Sheet | Project Grant Application | $3,000,000 | $3,000,000 | Connected Autonomous Vehicle Operations Program Funds | $6,000,000 | UDOT Awarded | 04/01/2019 | ||||||||||||||||||
44 | |||||||||||||||||||||||||||||||
45 | FOR INFORMATION ONLY (GRANTS OR PROJECTS NOT REQUIRING COMMISSION ACTION) | ||||||||||||||||||||||||||||||
46 | |||||||||||||||||||||||||||||||
47 | 3/7/2022 | Low or No Emmission and Grants for Buses and Bus Facilities | 5/31/2022 | Park CIty | Park City Electric Fleet Conversion: Purchases of Battery Electric Buses and Charging Equipment to Expand Net-Zerp Express Route Service | Project Application | $6,095,770 | $1,045,206 | Park City Transit Sales Tax, Transportation Resort Sales Tax, and Business Licensing Fees | $7,140,976 | UDOT Submitted | ||||||||||||||||||||
48 | 3/7/2022 | Low or No Emmission and Grants for Buses and Bus Facilities | 5/31/2022 | High Valley Transit (Summit Co) | High Valley Transit Electric Vehicle Project | Project Application | $12,875,012 | $2,167,038 | Transit Sales Tax Revenue | $15,042,050 | UDOT Submitted | ||||||||||||||||||||
49 | 9/20/2021 | Bus and Bus Facilities Program | 11/19/2021 | Park City | Expansion of fare-free, no emission bus services to affordable housing communities - purchase vehicles | $2,389,699 | $597,423 | Park City Transit Sales Tax | $2,987,122 | Park City Awarded | 3/14/2022 | ||||||||||||||||||||
50 | 9/21/2021 | Bus and Bus Facilities Program | 11/20/2021 | High Valley Transit (Summit Co) | High Valley Transit Multimodal Facility | $17,200,000 | $500,000 | High Valley Transit District (cash on hand) | $22,200,000 | High Valley Transit (Summit County) Not Awarded | |||||||||||||||||||||
51 | 4/13/2021 | Rebuilding American Infrastructure with Sustainability & Equity (RAISE) | 7/12/2021 | Tooele County | Ibapah Road | Project Fact Sheet | Project Grant Application | $21,202,364 | $1,115,914 | Tooele County | $22,318,278 | Tooele County Not Awarded | 11/22/2021 | Notice of Funding Opportunity released on 01/20/21 was withdrawn and will be revised. Wording from the USDOT BUILD Grant website: "The Department is currently revising the FY 2021 BUILD Notice of Funding Opportunity. Any FY2021 BUILD NOFOs issued before January 21, 2021, including any previously published on this website or Grants.gov, are withdrawn, and will not be used. The Department will publish the final FY 2021 BUILD NOFO at Grants.gov and https://www.transportation.gov/buildgrants/build-nofo by the April 26, 2021 statutory deadline." | |||||||||||||||||
52 | 08/08/2019 | Surface Transportation System Funding Alternatives Program (STSFA) | 10/15/2019 | Technology & Innovation | Road Usage Charge Local Overlay | Project Fact Sheet | Project Grant Application | $350,000 | $350,000 | Transportation Fund - Engineering Services Line Item | $700,000 | UDOT Awarded | 07/09/2020 | ||||||||||||||||||
53 | Integration of Road Usage Charge and Express Lanes Tolling | Project Fact Sheet | Project Grant Application | $395,000 | $395,000 | Transportation Fund - Engineering Services Line Item | $790,000 | UDOT Awarded | 07/09/2020 | ||||||||||||||||||||||
54 | DEQ VW Settlement | 9/1/2019 | Strategic Investments | EVSE Project Installations | Project Fact Sheet | $949,672 | $1,197,623 | Awarded | 12/17/2019 | ||||||||||||||||||||||
55 | DEQ VW Settlement | 9/1/2019 | Operations | Vehicle/Engine Replacement Awards | Project Grant Application | $2,604,948 | $5,209,896 | Awarded | 12/17/2019 | ||||||||||||||||||||||
56 | 05/15/2019 | Buses and Bus Facilities Program | Local Government | Park City Transit Bus Communications Technology Upgrades | $400,000 | $100,000 | Park City Transit Sales Tax | $500,000 | Awarded | 11/25/2019 | |||||||||||||||||||||
57 | 04/13/2018 | Surface Transportation System Funding Alternatives Program (STSFA) | 07/15/2018 | Technology & Innovation | Utah Alternative Fuel Vehicle Road Usage Charge Program | Project Fact Sheet | Project Grant Application | $1,250,000 | $1,250,000 | Transportation Fund - Engineering Services Line Item | $2,500,000 | UDOT Awarded | 02/12/2019 | ||||||||||||||||||
58 | |||||||||||||||||||||||||||||||
59 | |||||||||||||||||||||||||||||||
60 | |||||||||||||||||||||||||||||||
61 | |||||||||||||||||||||||||||||||
62 | |||||||||||||||||||||||||||||||
63 | |||||||||||||||||||||||||||||||
64 | |||||||||||||||||||||||||||||||
65 | |||||||||||||||||||||||||||||||
66 | |||||||||||||||||||||||||||||||
67 | |||||||||||||||||||||||||||||||
68 | |||||||||||||||||||||||||||||||
69 | |||||||||||||||||||||||||||||||
70 | |||||||||||||||||||||||||||||||
71 | |||||||||||||||||||||||||||||||
72 | |||||||||||||||||||||||||||||||
73 | |||||||||||||||||||||||||||||||
74 | |||||||||||||||||||||||||||||||
75 | |||||||||||||||||||||||||||||||
76 | |||||||||||||||||||||||||||||||
77 | |||||||||||||||||||||||||||||||
78 | |||||||||||||||||||||||||||||||
79 | |||||||||||||||||||||||||||||||
80 | |||||||||||||||||||||||||||||||
81 | |||||||||||||||||||||||||||||||
82 | |||||||||||||||||||||||||||||||
83 | |||||||||||||||||||||||||||||||
84 | |||||||||||||||||||||||||||||||
85 | |||||||||||||||||||||||||||||||
86 | |||||||||||||||||||||||||||||||
87 | |||||||||||||||||||||||||||||||
88 | |||||||||||||||||||||||||||||||
89 | |||||||||||||||||||||||||||||||
90 | |||||||||||||||||||||||||||||||
91 | |||||||||||||||||||||||||||||||
92 | |||||||||||||||||||||||||||||||
93 | |||||||||||||||||||||||||||||||
94 | |||||||||||||||||||||||||||||||
95 | |||||||||||||||||||||||||||||||
96 | |||||||||||||||||||||||||||||||
97 | |||||||||||||||||||||||||||||||
98 | |||||||||||||||||||||||||||||||
99 | |||||||||||||||||||||||||||||||
100 |