1GENERAL REQUIREMENTS2/15/20254/26/202504080000
7
1.1Plans & Specifications2/15/20254/18/2025036000OpenMedium00
8
1.2Plan Review2/18/20254/19/2025036000OpenMedium00
9
1.3
Permits: Zoning, Building, Environemental
2/18/20254/19/2025036000OpenMedium00
10
1.4Survey2/18/20254/19/2025036000OpenMedium00
11
1.5Impact Fee2/19/20254/22/2025036000OpenMedium00
12
1.6Adminstrative Costs2/20/20254/23/2025036000OpenMedium00
13
1.7Financing Costs2/21/20254/24/2025036000OpenMedium00
14
1.8Legal Fees2/22/20254/25/2025036000OpenMedium00
15
1.9Engineering Fees2/25/20254/26/2025036000OpenMedium00
16
1.10Other2/25/20254/26/2025036000OpenMedium00
17
2SITE PREP4/29/20257/11/202504320000
18
2.1Demolition (Remodel)4/29/20256/28/2025036000OpenMedium00
19
2.2Jacking & Shoring (Remodel)4/30/20257/1/2025036000OpenMedium00
20
2.3
Dust control, Surface Protection
5/1/20257/2/2025036000OpenMedium00
21
2.4Job-Site Access5/2/20257/3/2025036000OpenMedium00
22
2.5Job-Site Security5/3/20257/4/2025036000OpenMedium00
23
2.6Dumpster & Removal5/3/20257/4/2025036000OpenMedium00
24
2.7Clear Lot5/3/20257/4/2025036000OpenMedium00
25
2.8Storage On Site5/6/20257/5/2025036000OpenMedium00
26
2.9Portable Toilet5/7/20257/8/2025036000OpenMedium00
27
2.10Temporary Power5/8/20257/9/2025036000OpenMedium00
28
2.11Temporary Heat5/9/20257/10/2025036000OpenMedium00
29
2.12Scaffolding Rental5/10/20257/11/2025036000OpenMedium00
30
2.13Tool/Equipment Rental5/10/20257/11/2025036000OpenMedium00
31
2.14Other5/10/20257/11/2025036000OpenMedium00
32
3ON-SITE WATER/SEWER7/12/20259/19/202504000000
33
3.1Soil & Perc Tests7/12/20259/12/2025036000OpenMedium00
34
3.2Septic System Design7/15/20259/13/2025036000OpenMedium00
35
3.3
Septic Permits, Inspections, Fees
7/16/20259/16/2025036000OpenMedium00
36
3.4
Septic System Installation, Tie in to House
7/17/20259/17/2025036000OpenMedium00
37
3.5Dewatering (High Water Table)7/17/20259/17/2025036000OpenMedium00
38
3.6
Well, Pump, Trenching, Plumbing to House
7/17/20259/17/2025036000OpenMedium00
39
3.7Well Permits & Fees7/18/20259/18/2025036000OpenMedium00
40
3.8Other7/19/20259/19/2025036000OpenMedium00
41
4UTILITIES3/22/20255/30/202504000000
42
4.1
Town Water: Tap Fees & Hookup
3/22/20255/23/2025036000OpenMedium00
43
4.2
Town Sewer: Tap Fees & Hookup
3/25/20255/24/2025036000OpenMedium00
44
4.3
Electrical: Permit, Connection Fee, Installation
3/25/20255/24/2025036000OpenMedium00
45
4.4
Gas: Permit, Connection Fee, Installation
3/25/20255/24/2025036000OpenMedium00
46
4.5LPN: Tank installation, Hookup3/26/20255/27/2025036000OpenMedium00
47
4.6Oil Tank Installation3/27/20255/28/2025036000OpenMedium00
48
4.7Telecom Hookup3/28/20255/29/2025036000OpenMedium00
49
4.8Other3/29/20255/30/2025036000OpenMedium00
50
5EXCAVATION & EARTHWORK4/1/20256/19/202504640000
51
5.1Cut & Fill4/1/20255/31/2025036000OpenMedium00
52
5.2Blasting4/1/20255/31/2025036000OpenMedium00
53
5.3Removal of Stone/Dirt4/2/20256/3/2025036000OpenMedium00
54
5.4Rough Grading4/3/20256/4/2025036000OpenMedium00
55
5.5Trenching For Utility Hookups4/4/20256/5/2025036000OpenMedium00
56
5.6Foundation Excavation4/5/20256/6/2025036000OpenMedium00
57
5.7Foundation Footing Drains4/8/20256/7/2025036000OpenMedium00
58
5.8Curtain Drains4/8/20256/7/2025036000OpenMedium00
59
5.9Culverts4/8/20256/7/2025036000OpenMedium00
60
5.10Swales4/9/20256/10/2025036000OpenMedium00
61
5.11Retaining Walls4/10/20256/11/2025036000OpenMedium00
62
5.12Ponds4/11/20256/12/2025036000OpenMedium00
63
5.13Other Site Drainage4/12/20256/13/2025036000OpenMedium00
64
5.14Backfill4/15/20256/14/2025036000OpenMedium00
65
5.15Compaction4/15/20256/14/2025036000OpenMedium00
66
5.16Top Soil4/15/20256/14/2025036000OpenMedium00
67
5.17Finish Grading4/16/20256/17/2025036000OpenMedium00
68
5.18Seeding/Sod4/17/20256/18/2025036000OpenMedium00
69
5.19Other4/18/20256/19/2025036000OpenMedium00
70
6FOUNDATION4/22/20257/8/202504480000
71
6.1Footings/Pads4/22/20256/21/2025036000OpenMedium00
72
6.2
Foundation walls/stem walls/grade beams
4/22/20256/21/2025036000OpenMedium00
73
6.3Piers4/22/20256/21/2025036000OpenMedium00
74
6.4
Slabs - Foundation, Basement, Garage
4/23/20256/24/2025036000OpenMedium00
75
6.5Steel Reinforcing4/24/20256/25/2025036000OpenMedium00
76
6.6Anchor Bolts, Hold Downs4/25/20256/26/2025036000OpenMedium00
77
6.7Buikheads4/26/20256/27/2025036000OpenMedium00
78
6.8Sub-Slab Vapor Barrier4/29/20256/28/2025036000OpenMedium00
79
6.9Sump Pump4/29/20256/28/2025036000OpenMedium00
80
6.10Crawlspace Vapor Barrier4/29/20256/28/2025036000OpenMedium00
81
6.11Crawlspace Vents4/30/20257/1/2025036000OpenMedium00
82
6.12Foundation Windows5/1/20257/2/2025036000OpenMedium00
83
6.13Damproofing, Water-proofing5/2/20257/3/2025036000OpenMedium00
84
6.14Foundation Drain Board5/3/20257/4/2025036000OpenMedium00
85
6.15Slab insulation: Edge/Blow5/6/20257/5/2025036000OpenMedium00
86
6.16Exterior Foundation Insulation5/6/20257/5/2025036000OpenMedium00
87
6.17
Exterior Insulation Coating/ Protection
5/6/20257/5/2025036000OpenMedium00
88
6.18Other5/7/20257/8/2025036000OpenMedium00
89
7OTHER MASONRY/PAVING5/9/20257/16/202503920000
90
7.1Patios5/9/20257/10/2025036000OpenMedium00
91
7.2Exterior Stairs5/10/20257/11/2025036000OpenMedium00
92
7.3Masonry Chimneys5/13/20257/12/2025036000OpenMedium00
93
7.4Fireplaces/Hearths5/13/20257/12/2025036000OpenMedium00
94
7.5Driveway5/13/20257/12/2025036000OpenMedium00
95
7.6Walkways5/14/20257/15/2025036000OpenMedium00
96
7.7Other5/15/20257/16/2025036000OpenMedium00
97
8ROUGH FRAMING5/17/20257/29/202504160000
98
8.1Sill & Seal5/17/20257/18/2025036000OpenMedium00
99
8.2
Steel/Wood Carrying Beam, Lolly Columns
5/20/20257/19/2025036000OpenMedium00
100
8.3Floor Framing5/20/20257/19/2025036000OpenMedium00