Checklist for SMT Process
2
ItemY/N
(Check or not)
ProcessNo.QuestionCriterionDistributionComment
(All items must be commented
and Evidence)
CheckNote
3
SMT ProcessYManagement of SMT material1Do you check the BGA/IC/PCB vacuum packaging status?1. BGA/IC/PCB should income in vacuum packaging
(Use ESD prevention wrapping material and band)
○ : Compliance, ▲ : Middle, X : Non-Compliance1. Visual check of vacuum packaging status
4
SMT ProcessY2Does MSL component manage the time based on standards?Incoming parts after vacuum packaging should check the moisture
(store the indicator card and manage history - 24Hr storage)
○ : Compliance, ▲ : Middle, X : Non-Compliance1. Check the indicator card
2. Check at the site (MSL management sheet)
5
SMT ProcessY3Does it comply with BGA/IC/PCB management standards?After the production quantity is released, the remaining quantity should be immediately vacuum-packed (material warehouse)○ : Compliance, ▲ : Middle, X : Non-Compliance
Check compliance with standard
6
SMT ProcessY2. The unpacked IC shipped from the field should be used within 24 hours
(time management by level)
○ : Compliance, ▲ : Middle, X : Non-Compliance
Check compliance with standard
7
SMT ProcessY3. If not available within 24 hours
- Vacuum packaging and storage within 30 minutes after baking
(Refer standard of baking according to MSL level or requirements of maker)
*Opened ICs waiting for use are stored in a designated place
○ : Compliance, ▲ : Middle, X : Non-Compliance
Check compliance with standard
8
SMT ProcessY4. The PCB should store on a flat surface○ : Compliance, ▲ : Middle, X : Non-Compliance
Check compliance with standard
9
SMT ProcessY4Is Tray IC managed by Part No.?Tray IC should use tag for identification Part No
It should manage history when repacking the tray (packaging date, time, quantity)
○ : Compliance, ▲ : Middle, X : Non-Compliance
Check Identification mark
10
SMT ProcessY5Do you comply with the warehouse temperature/humidity standards?1. Temperature (25±3℃), humidity 30~60%○ : Compliance, ▲ : Middle, X : Non-Compliance
Check at the site
11
SMT ProcessY. Check temperature/humidity check sheet (twice a day, day/night)○ : Compliance, ▲ : Middle, X : Non-Compliance
Check at the site
12
SMT ProcessY3. Temperature/humidity upper/lower limit should be managed○ : Compliance, ▲ : Middle, X : Non-Compliance
Check at the site
13
SMT ProcessY6Do you comply with first-in/first-out management when using materials?1. It should be managed first-in/first-out○ : Compliance, ▲ : Middle, X : Non-Compliance1. Check the material incoming date
(shipping company month label)
2. Place materials in a structure that allows
first in / first out (recommended)
14
SMT ProcessY7Do you manage dry chamber temperature/humidity check sheet?1. Dry Chamber internal temperature/humidity
- Temperature: 25±5℃. Humidity: less than 10%
○ : Compliance, ▲ : Middle, X : Non-Compliance1. Check the calibration of temmometer and hygrometer
2. Check the temperature/humidity check sheet
3. Temperature/humidity can be checked without opening the chamber door
4. Close the door and check if it reaches 10% within an hour
15
SMT ProcessYTemperature/humidity management by c/sheet : Twice a day (day/night)○ : Compliance, ▲ : Middle, X : Non-Compliance1. Check the calibration of temmometer and hygrometer
2. Check the temperature/humidity check sheet
3. Temperature/humidity can be checked without opening the chamber door
4. Close the door and check if it reaches 10% within an hour
16
SMT ProcessY3. Temperature/humidity upper/lower limit should be managed○ : Compliance, ▲ : Middle, X : Non-Compliance1. Check the calibration of temmometer and hygrometer
2. Check the temperature/humidity check sheet
3. Temperature/humidity can be checked without opening the chamber door
4. Close the door and check if it reaches 10% within an hour
17
SMT ProcessY4. Temperature/humidity can be checked without opening the equipment door○ : Compliance, ▲ : Middle, X : Non-Compliance1. Check the calibration of temmometer and hygrometer
2. Check the temperature/humidity check sheet
3. Temperature/humidity can be checked without opening the chamber door
4. Close the door and check if it reaches 10% within an hour
18
SMT ProcessY8Do you manage the incoming/outgoing of dry chamber equipment?In/out and time of equipment internal parts should be managed○ : Compliance, ▲ : Middle, X : Non-Compliance
Check the C/sheet
19
SMT ProcessYIC Memory9(Common) Do you have work instructions for each IC?It should have a Own work instructions based on IC model○ : Compliance, ▲ : Middle, X : Non-Compliance
Check the own work instrucments
20
SMT ProcessY10(Common) Are you performing sampling inspection of the copied model?One IC per tray should be inspected (manual inspection)○ : Compliance, ▲ : Middle, X : Non-Compliance
Check at the site
21
SMT ProcessY11(Auto) Is the loading area of the copied model and the waiting model separated?The copy-completed model and the waiting model loading area should be separated○ : Compliance, ▲ : Middle, X : Non-Compliance
Check at the site
22
SMT ProcessY12(Manual) Is the copy program the latest version?The program should be the latest version○ : Compliance, ▲ : Middle, X : Non-Compliance
Check the program version
23
SMT ProcessY13When creating Bin file→ Project, is it compared with the Option (Device Setting) value and the work instructionsl?It should Match with the work instructions○ : Compliance, ▲ : Middle, X : Non-Compliance
Check the work instructions
24
SMT ProcessYSolder Paste14Is the solder paste in/out managed?1. Income date / inputed date to refrigerator / Outgoing date to refrigerator / Mixing time / Opened date○ : Compliance, ▲ : Middle, X : Non-ComplianceCheck the tag or system management check
1. Visual check, management by incoming date/lot
2. Check the validity period whichbe secured at least 2 months
25
SMT ProcessY2. It should be managed from storage to disposal○ : Compliance, ▲ : Middle, X : Non-ComplianceCheck the tag or system management check
1. Visual check, management by incoming date/lot
2. Check the validity period whichbe secured at least 2 months
26
SMT ProcessY3. The validity period should be secured at least 2 months at the time of stock○ : Compliance, ▲ : Middle, X : Non-ComplianceCheck the tag or system management check
1. Visual check, management by incoming date/lot
2. Check the validity period whichbe secured at least 2 months
27
SMT ProcessY15Does it comply with refrigerated storage standards?1. Refrigerator temperature: 1~10℃ (Recommended: 5±3℃ management)○ : Compliance, ▲ : Middle, X : Non-Compliance1. Check the calibration of thermometer
2. Check Temperature C/Sheet
3. Check First in/first out
4. Check that High/low temperature solder classification management
28
SMT ProcessY2. Temperature Check Sheet twice a day (recorded day/night)○ : Compliance, ▲ : Middle, X : Non-Compliance1. Check the calibration of thermometer
2. Check Temperature C/Sheet
3. Check First in/first out
4. Check that High/low temperature solder classification management
29
SMT ProcessY3. Temperature upper/lower limit should be managed○ : Compliance, ▲ : Middle, X : Non-Compliance1. Check the calibration of thermometer
2. Check Temperature C/Sheet
3. Check First in/first out
4. Check that High/low temperature solder classification management
30
SMT ProcessY4. It should be managed first-in/first-out○ : Compliance, ▲ : Middle, X : Non-Compliance1. Check the calibration of thermometer
2. Check Temperature C/Sheet
3. Check First in/first out
4. Check that High/low temperature solder classification management
31
SMT ProcessY5. high/low temperature solders should Separate and be managed○ : Compliance, ▲ : Middle, X : Non-Compliance1. Check the calibration of thermometer
2. Check Temperature C/Sheet
3. Check First in/first out
4. Check that High/low temperature solder classification management
32
SMT ProcessY16Does the Solder Paste mix in machine?RPM management of mix machine
①400 RPM : 150 sec
②1,000 RPM : 45 sec
○ : Compliance, ▲ : Middle, X : Non-Compliance
Check at the site (manual or system)
33
SMT ProcessY17Do you comply with the conditions of use of Solder Paste?1. Storage in room temperature : 2 ~ 12 hour
(2Hour ↓ : Can't be used, 2~12Hour Not opened solder : Re-refrigerated,
12Hour ↑ : Disposal)
○ : Compliance, ▲ : Middle, X : Non-Compliance
Check the standards
34
SMT ProcessY2. Remained solder after opening : Use within 12 hour
(12Hour ↓ : Re-refrigerated after sealing, 12Hour ↑ : Disposal)
○ : Compliance, ▲ : Middle, X : Non-Compliance
Check the standards
35
SMT ProcessY3. Input to the screen printer : Use within 4 hour (4Hour ↑ : Disposal)○ : Compliance, ▲ : Middle, X : Non-Compliance
Check the standards
36
SMT ProcessY4. Printed solder on PCB : Input SMT line within 2 hour
(2Hour ↑ : Re-print after cleaning)
○ : Compliance, ▲ : Middle, X : Non-Compliance
Check the standards
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100