Compound Wall Estimate
2
`
3
S.No
DescriptionNosLBDQtyRate unitAmount
4
In feetIn feetIn feet
5
1Pile :
6
Driving bored cast in situ piles of
7
300mm dia to a depth of 2.5m from the
8
virgin G.L. (Labour Only)228.6585366
9
Pile1x6636.00
10
Sundries0.00
11
36.00130rft4,680
12
2Earthwork:
13
Earthwork in excavation including disposal
14
of earth; disposed earth to be levelled and
15
neatly dressed.
16
Grade Beam1x15011.575.00
17
Sundries0.00
18
75.0012cft900
19
3River Sand Filling:
20
Supplying and filling with river sand
21
including, watering, ramming consolidating
22
and dressing complete.1x1501.250.5031.25
23
Sundries0.50
24
31.7546cft1,461
25
4P.C.C:
26
P.C.C work: Providing and laying plain
27
cement concrete of 1:4:8 (1cement:
28
4 coarse sand: 8 graded stone aggregate)1x1501.250.5031.25
29
Sundries0.50
30
31.75118cft3,747
31
58" Hollow Block
32
Supplying and executing 8" Hollow Block
33
including the cost of loading, lead and
34
unloading at site and inclusive the cost of
35
scaffolding.1x1507350.00
36
Sundries0.00
37
350.0065Sq.ft22,750
38
6Pointing
39
Providing and constructing Raised Pointing
40
for all the 8" Thk Hollow Block Joints
41
above ground level in CM 1:31x182075740.00
42
Sundries0.00
43
5740.0015Sqft86,100
44
45
7Reinforced Concrete Work:
46
R.C.C 1:1.5:3 mix using 20 mm stone
47
jelly for Pile, Column excluding fabrication of
48
RCC items and including cost and
49
conveyance of all materials labour etc.,
50
Pile1x830.788517.92
51
Grade beam1x18200.751615.00
52
Column1x830.750.758373.50
53
Coping1x18200.830.16108.90
54
Sundries0.68
55
1616.00187Cft302,191
56
8Reinforcement:
57
Reinforcement for R.C.C work including
58
straightening, cutting, bending, placing
59
in position & binding all TMT barsAssume 100Kg/m3
60
Qty as per item no 7 4.58T
61
Sundries0.02
62
4.6063,000T289,561
63
64
9Centering and Shuttering work:
65
Centering and shuttering including of
66
strutting, propping etc. and removal o
67
formwork for column & Grade Beams
68
Using MS Sheets
69
Grade Beam1x282011640.00
70
Column1x83381992.00
71
Sundries0.00
72
3632.0028Sq.ft101,696
73
10Plastering:
74
Plastering with cement mortar 1:4
75
(1cement : 4 fine sand) of 12mm thickness.
76
Column1x83281328.00
77
Grade beam1x282011640.00
78
Coping (bottom+Top+ side)1x18201.251025.00
79
Sundries0.00
80
3993.0031Sq.ft123,783
81
11Painting: Outer wall
82
Wall painting with exterior emulsion Paint
83
ACE (Asian brand) to give an even shade1x2820813120.00
84
two coats 0.00
85
13120.0018Sq.ft236,160
86
12Supplying and Fixing of Barbed wire angle
87
(75x75x6) angle1x8383.001450nos120,350
88
89
13Supplying and fixing of Barbed wire
90
8 lines1x88206560.0019Rft124,640
91
92
14Existing Chain link removing1x1726726.0028Sq.ft20,328
93
94
15Existing fencing post Removing1x137137.00170nos23,290
95
96
16Site cleaning for 3mts on each sideLumpsum35,000
97
98
Rs. 1,496,636
99
(Rupees Twenty lac twenty nine thousand six hundred and eighty three only)