T&C Requirement Compliance Sheet
2
Sr. No.Test DescriptionFATSAT
3
HVAC Package - CHW AHU
4
1Physical inspection and specs. Verificationra
5
2Duct Pressure testra
6
3Chilled water coil pressure testra
7
4Condensate drain line slope testra
8
5Air CFM Measurementra
9
6Air Balancing verificationra
10
7Duct static pressure verificationra
11
8Alarm & Fire interlocking verificationra
12
9Modulation valve operation verificationra
13
10Heat Load test @ Design Loadrr
14
11Noise Level Verificationra
15
12Vibration checkra
16
13AHU VFD Panel VFD Modulation & Panel Operation verificationra
17
14CHW Water Balancingra
18
15BMS integration verificationra
19
16Dampers Operation Verificationra
20
17Heat Recovery Unit Operation Verificationra
21
18CHW line Pressure test & Chemical Flushingra
22
19AHU Filters Verificationra
23
HVAC Package - VAV Boxes
24
1Installation Verificationra
25
2VAV box calibration verification as per designaa
26
3BMS integration verificationaa
27
HVAC Package - EXHAUST & FRESH AIR FANS
28
1Physical inspection and specs. Verificationra
29
2Duct pressure testra
30
3Fan Functional Verification (CFM & Electrical Parameter)ra
31
4Fan Static measurementra
32
5Fan Auto/manual & Fire Integration verificationra
33
6Air Balancing verificationra
34
7Alarm & Fire interlocking verificationra
35
8Noise level Verificationra
36
9Vibration level verificationra
37
10BMS integration verificationra
38
HVAC Package - VRF System
39
1Physical inspection and specs. Verificationra
40
2Copper pipe pressure testra
41
3Unit vacuum testra
42
4Unit startup and verification of alarmsra
43
5Air CFM Measurementra
44
6Air Balancing verificationra
45
7Display Control Panel & Operations Checksra
46
8Performance test, Heat rejection & COP Calculation & Verification.
100% sensible design load of unit / room capacity to be placed 24 hrs. during SAT with 12 Hrs changover between wrking and stand by unit. Temperature data loggers shall be hang at different locations as per drawing to log the T + Rh for 24 hrs. during heat run test. Measure the parameters of Airside & Electrical for indoor & outdoor units.
ra
47
9Drain Pump - Drain Line leakage/slope check and Drain Pump operation to be
verify.
ra
48
10Sequential Timer Panel Verification (if any): Units logic Operations & Verificationsra
49
11Alarm & Fire interlocking verificationra
50
12BMS integration verificationra
51
12Noise level Verificationra
52
53
Test Instrumentation Required/Considered For SAT
54
Sr. No.DescriptionQty.
55
1Heater load (for Critical Rooms HLT)
As per heat load calculation sheet
1 No.
56
2True RMS Multi-meter1 No.
57
3True RMS Clamp meter1 No.
58
4Digital Thermometer1 No.
59
5Velocity Matrix1 No.
60
6Digital T+ RH Data loggers15 Nos.
61
7Sling Phsychrometer1 No.
62
8Sound level db meter1 No.
63
9Digital Vacuum Gauge1 No.
64
10Insulation Resistance tester1 No.
65
11Air Capture Hood1 No.
66
12Duct Pressure test kit1 No.
67
13Vibration Meter1 No.
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100